Monthly Operating Rept for Nov 1992 for Harris Nuclear Power Plant,Unit 1
ML18010A954
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/30/1992
From: Crenshaw A, Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-923032, NUDOCS 9212180054
Download: ML18010A954 (9)


Text

~cere,a~xao oocunczNr orsr unary SVSraia REUULAT INFORMATION DISTRIBUTION a STEM (RIDE) il'.":

~":~"":

i FACIL;T50-'400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION CRENSHANFAF Carolina Power 6 Light Co.

VAUGHN,,G.E.

Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly opera t for Nov 1992 for Harris Nuclear Power Plant, unit 1

/921215 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR i ENCL i

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

05000400~

RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA N

DLRQ LPEB10 REG ILE 01 COPIES LTTR ENCL 1

1 1

1 1

1 1

1 EXTERNAL: EGGG BRYCE,J.H "

NSIC 1

1 1

1 NRC PDR 1

1 i EMOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iYASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

G. E. VAVGHN Vice President Harris Nuctear Project DEC

)

S 1992 CHILL Caroljna Power & Ljght Company P.O. Box 165 ~ New Hill, NC 27562 HARRIS NUCLEAR PROJECT P.

O.

Box 165 New Hill, North Carolina 27562 File Number:

SHF/10-15505 Letter Number:

HO-923032 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of November 1992.

Yours very truly, APC:dac Enclosure G.

E. Vaughn Vice President Harris Nuclear Project cc:

Mr. S.

D. Ebneter (NRC-RII)

Mr. J.

E. Tedrow (NRC-SHNPP) 92i2180054 92ii30 PDR,'DOCK 05000400 "R-'

PDR MIS/DATAREP/1/OS4

N H

DOCKET NO.:

050-400 UNIT:

Harris Unit 1 DATE:

November 1992 COMPLETED BY:

Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 0 percent Availability Factor for the referenced month and a -2.17 percent Capacity Factor.

There was one refueling outage.

Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel and 819 spent fuel assemblies stored in the spent fuel pools.

413 of the spent fuel assemblies are BWR, which were shipped to Harris from CP&L's Brunswick Plant.

182 of the spent fuel assemblies are from CP&L's Robinson Plant.

MISQDATAREP/2%0S4

CPbh.

CO RUN DATE 12/10/92 RUH TIME i3:65:24 NT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1

PAGE RPD36-006 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY AMANDA CREHBHAW TELEPHONE (939)362-2868 2 4 3 ~

4 ~

5 i 6.

7 4 8.

UNIT NAME:

HARRIS UNIT 1

NOTES REPORTIHG PERIOD:

NOVEMBER 92 See 0 erations Summary LICENSED THERMAL POWER (MWT): 2775 NAMEPLATE RATING

<GROSS MWE): 950.9 I

DESIGN ELECTRICAL RATING <NET MWE): 900.0 MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 MAX DEPENDABLE CAPACITY (HET MWE): 860.0 IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

None'.

16.

POWER LEVEL TO WHICH RESTRICTED IF ANY (HET MWE):

None.

REASONS FOR RESTRICTION IF AHY:

N/A THIS MONTH YR TO DATE CUMUL ATIVE 32.

33.

14.

15.

36.

$ 7.

18.

20.

21.

22.

23.

24

'OURS IN REPORTIHG PERIOD NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GEN.

(MWH)

GROSS ELEC.

ENERGY GEH.

(MWH)

HET ELEC.

ENERGY GENERATED (MWH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAP.

FACTOR (USING MDC HET)

UNIT CAP.

FACTOR (USING DER HET)

UNIT FORCED OUTAGE RATE SHUTDOWNS SCHED.

OVER NEXT 6 MONTHS None 720.00 30.73

.66

.00

.60

.00

.00

-$ 3425.66

.60

.00 2 ~ f 7

-2.07

.00 (TYPE,

DATE, 8046.00 5836.90

.60 5777.65

.60 35539291.82 5197685.66 4832027.00 71.85 71.85 69.88 66.78 5.65 AHD DURATIOH 4896$.66 38824.90

.00 38333.35

.00

$ 61515416.36 33798448.00 31436696.66 78.29 78.29 74.65 71.33 4.13 OF EACH):

25.

26.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

).16 9

MIS/DATAREP/3/OS4

CPht.

CO RUH DATE 12/10/92 RUN TIME 33:05:24 WHT PERFORMANCE DATA SYSTEM APPNFCX B AVERAGE DAILY POWER LEVEL HARRIS UNIT 3

PAGE RPD39-000 NOVEMBER 3992 DOCKET HO. 059-400 COMPI ETED BY AMANDA CRENSHAW TELEPHONE (939)362-2808 DAY AVG. DAILY POWER LEVEL (MWE-HET)

DAY AVG. DAILY POWER LEVEL (MWE-HET) 4 5

19 20

-10 24 25 30

-37 12 30

-40 3.16 8

MIS/DATAREP/4/OS 4

11 II I

P c

V UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Harris'2/07/92 A. P. Crenshaw (919) 362-2808 REPORT MONTH: November 1992 No.92-018 Date 920912 T1 y

P e

Duration (Hours) 720 R~

e a

s 0

n Method of Shutting Down Reactor~

Licensee Event Report ¹ N/A System

'ode 4

N/A Component Code 5 N/A Cause

& Corrective Action to Prevent Recurrence Unit was shutdown for the scheduled Cycle 5 Refueling Outage.

Reactor criticality was achieved on November 29, 1992, at 1716 hours0.0199 days <br />0.477 hours <br />0.00284 weeks <br />6.52938e-4 months <br />.

1 F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 5 License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-01 61) 5 Exhibit 1 -Same Source

0 0

~

4 W t+p4 e

5