Corrected Summary of 921007 Meeting W/Util in Rockville,Md Re Design Details for Safety Injection Alternate Miniflow Sys Mod Planned for Current Refueling Outage at Plant
ML18010A918
Person / Time
Site: Harris 
Issue date: 11/17/1992
From: Le N
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-M84620, NUDOCS 9211240247
Download: ML18010A918 (3)


Text

Docket No. 50-400 November 17, 1992 CORRECTED COPY LICENSEE:

Carolina Power 8 Light Company FACILITY:

Shearon Harris Nuclear Power Plant, Unit 1

SUBJECT:

MEETING

SUMMARY

OF OCTOBER 7,

1992, REGARDING MODIFICATION OF THE SAFETY INJECTION ALTERNATE HINIFLOW SYSTEM (TAC NO. H84620)

This refers to the subject meeting conducted at the NRC Headquarters in Rockville, Maryland, on October 7, 1992.

The purpose of the meeting was for Carolina Power 8 Light Company to brief and provide responses to the staff questions related to the design details for the Safety Injection Alternate Hiniflow (AHF) system modification planned for the current refueling outage at the Shearon Harris Nuclear Power Plant.

Enclosure 1 is the list of attendees, and Enclosure 2 contains copies of material used during the meeting.

The licensee stated that the planned modification will:

(1) provide the same deadheading protection for the Charging/SI

pumps, (2) not affect the high-head SI system ability to protect the core, and (3) remove weak links that were previously identified in LER 91-08.

Highlights of the discussion included detailed design regarding planned piping

changes, hardware
changes, logic changes, and instrumentation and control changes to the AHF system.

In addition, post-modification testing, procedural

changes, and operator training regarding the modification were also discussed at the meeting.

The licensee committed to provide details of the AHF modification package and additional information related to design documents for further staff review.

Enclosures:

1.

List of Attendees 2.

Heeting Materials cc w/enclosures:

See next page ORIGINAL SIGNED BY:

Ngoc B. Le, Project Manager Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation OFC L '1:DRPE PM:PD21:DRPE PD'

'DRPE NAME

%> tie

'ATE II /I "/92 NBLe:tmd l~/92 EAde am

/

/92 FILENAME:

HAR84620.HTS 92ii240247 92iii7 PDR ADOCK 05000400 P

PDR)

(

\\

C

DISTRIBUTION:

<Pock~eF-ice

'RC/Local PDRs PD II-I Reading T. Hurley F. Hiraglia J.

Ramsey J.

Parti,oow S.

Varga G. Lainas ED Adensam N. B.

Le S.,Little OGC E. Jordan J.

Jacobson F. Orr, R. Jones T. Scarbrough C. Doutt T.

Chan H.

C. Shannon H.

E. Hayfield J.

Ramsey S.

Peterson A. Lee T. Koshy R. Schaaf ACRS (10)

L. Plisco, EDO E. Merschoff, Region II cc:

Licensee 5 Service List