Monthly Operating Rept for Oct 1992 for Harris Nuclear Power Plant
ML18010A907
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/1992
From: Crenshaw A, Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-923030, NUDOCS 9211190227
Download: ML18010A907 (12)


Text

accsr.zahrxo OrSra.minax ozmO~~, ra~rrOx SvSrzrvr REGULAT INFORMATION DISTRIBUTION STEM (RIDS)

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.

Carolina Power

& Light Co.

VAUGHN,G.E.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly

'ng rept for Oct 1992 for Harris Nuclear Power Plant.

9211 r.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR I

ENCL

(

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

05000400

/

,,RECIPIENT ID CODE/NAME PD2-1'A LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2'OPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR -DLPQ/LPEB10 Ol COPIES LTTR ENCL 1

1 1

1 1

1 1

1 EXTERNAL EG&G BRYCE iJ ~ H NSIC 1

1 1

1 NRC PDR 1

1 NOTE TO ALL "RIDS RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

h 1l

, t~

CHILL Carolina Power & Light Company P.O. Box t65 ~ New Hill, NC 27562 G. E. VAUGHN Vice President Harris Nuclear Project NOV 1

6 1992 File Number:

SHF/10-15505 Letter Number:

HO-923030 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of October 1992.

Yours very truly, G.

E. Vaughn Vice President Harris Nuclear Project APC:dac Enclosure cc:

Mr. S.

D. Ebneter (NRC-RII)

Mr. J.

E. Tedrow (NRC-SHNPP)

ZOO006 MIS/DATAREP/1/OS4 92iii'lt0227 921031 PDR ADOCK 05000400 R

PDR H(p2

g4 1

DOCKET NO.:

050-400 UNIT:

Harris Unit 1 DATE:

October 1992 COMPLETED BY:

Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 0 percent Availability Factor for the referenced month and a -1.16 percent Capacity Factor.

There was one refueling outage.

Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 916 spent fuel assemblies and 60 new fuel assemblies in the Spent Fuel Pools.

413 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.

182 of the spent fuel assemblies are from CPGL's Robinson Plant.

The 60 new fuel assemblies and 97 of the Harris spent fuel assemblies will be reloaded into the reactor vessel for Cycle 5.

MISQDATAREP$2$0S4

~

e

CPhL CO r

RUN DATE

)1/66/92 RUN TIME 68:21:15 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 3

PAGE RPD36-000 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY AMANDA CRENSHAM TELEPHONE (919)362-2868 UNIT NAME:

HARRIS UNIT 1

NOTES 2.

REPORTIHG PERIOD:

OCTOBER 92 I

3.

LICENSED THERMAL POWER (MMT): 2775 See Operations Summary.

4.

NAMEPLATE RATING (GROSS MME): 956.9 l

5.

DESIGN ELECTRICAL RATING (NET MWE): 900.6 6.

MAX DEPENDABLE CAPACITY <GROSS MWE): 920.0 7.

MAX DEPENDABLE CAPACITY <NET MWE): 866.0

8. IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

9.

POMER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): None.

16.

REASONS FOR RESTRICTION IF ANY: N/A THIS MONTH YR TO DATE CUMUL ATIVE HOURS IH REPORTIHG PERIOD 745.00

$ 2.

NUMBER OF HOURS REACTOR CRITICAL

.00 13.

REACTOR RESERVE SHUTDOWN HRS

.00 14.

HOURS GENERATOR ON LINE

.00 15.

UNIT RESERVE SHUTDOWN HOURS

.00 16.

GROSS THERMAL ENERGY GEH.

(MWH)

.66 17.

GROSS ELEC.

ENERGY GEH.

(MWH)

.60 18.

HET ELEC.

ENERGY GENERATED (MWH)

-7440.00 19.

UNIT SERVICE FACTOR

.06 20.

UNIT AVAILABILITYFACTOR

.00 2$. UNIT CAP.

FACTOR

<USING MDC HET)

-1.16 22.

UNIT CAP.

FACTOR (USING DER NET) 23.

UNIT FORCED OUTAGE RATE

.00 24.

SHUTDOMNS SCHED.

OVER NEXT 6 MONTHS (TYPE,

DATE, Refueling Outage number 4 began on September 12, scheduled for completion November 23, 1992.

7320.00 48241.66 5866.17 38794.17

.00

.60 5777.65 38331.f5

.66

.00 35539291.82 163535436.30 5197685.66 33798448.00 4845452.00 31444135.66 78.92 79.46 78.'92 79.46 76.97 75.79 73.55 72.42 5.65 4.13 AND DURATION OF EACH):

1992 and.is currently

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATF OF START UP: 11-21 (Init. Crit:.)

26.

UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/DATAREP/3/OS4 1.36 9

lI

'1 1

II I

CPbL CO RUN DATE 3t/06/92 RUN TIME 10:37:04 PLANT PERFORMANCE DATA SYSTEM APPENDIX B - AVERAGE DAILY POWER LEVEL HARRIS UNIT 1

PAGE RPD39-000 OCTOBER 1 992 DAY AVG. DAILY POWER LEVEL (MWE-NET)

-10 DOCKET NO. 058-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (9)9)362-2808 DAY AVG. DAILY POWER LEVEL (MWE-NET) 20

-$ 0

-$ 0 32 t4

-10 29 30 1.36 8

MIS /DATAREP/4/OS 4

~

'y

M O

C UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: October 1992 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Harris 11/04/92 A. P. Crenshaw (919) 362-280&

No.

Date T1 y

P e

Duration (Hours)

R~

e a

s 0

n Method of Shutting Down Reactor'icensee Event Report ¹ System Code 4 Component Code 5 Cause 5 Corrective Action to Prevent Recurrence 92%18 920912 S

745.0 N/A N/A N/A Unit was shutdown for the scheduled Cycle 5 Refueling Outage.

1 F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 5. License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG%1 61) 5 Exhibit 1 -Same Source