Monthly Operating Rept for Sept 1992 for Harris Nuclear Power Plant Unit 1
ML18010A817
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/1992
From: Crenshaw A, Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-923029, NUDOCS 9210190271
Download: ML18010A817 (12)


Text

~cczr.ka.~~zv ra.~am~Ox ozwOX 8.~nOx SvSrnc REGULATOR% INFORMATION DISTRIBUTION YSTEM (RIDS) r FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAWiA.

Carolina Power

& Light Co.

VAUGHNiG.E.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly operating re~

ept 1992 for Harris Nuclear Power Plant Unit 1 921013 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

05000400

~

RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL EG&G BRYCEg J H

NSIC COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR/J~OLP /LPEB10 REC V%LE Ol NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

'0 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 24 ENCL 24

CNILL Carolina Power & Light Company P.O. Box 165 ~ New Hill,NC 27562 G. E. VAUGHN Vice President Harris Nuclear Project OCT

)

g 1992 File Number:

SHF/10-15505 Letter Number:

HO-923029 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power

& Light Company herewith submits the report of operation statistics and shutdown experience for the month of September 1992.

Yours very truly, G.

E. Vaughn Vice President Harris Nuclear Project APC:dac Enclosure cc:

Mr. S.

D. Ebneter (NRC-RII)

Mr. R.

G. Oehl (DOE)

Mr. J.

E. Tedrow (NRC-SHNPP)

~s9210190271 920930

~

~

s r

<>t PDR

-" ADOCK 05000400 R

r PDR MIS/DATAREP/1/OS4 ZEWrr'1/

~ ~

e

DOCKET NO.:

050-400 UNIT:

Harris Unit 1 DATE:

September 1992 COMPLETED BY:

Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 37.25 percent Availability Factor for the referenced month and a 33.78 percent Capacity Factor.

There was one significant power reduction and one refueling outage in September.

Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel, 759 spent fuel assemblies stored in the Spent Fuel Pools.

413 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.

182 of the spent fuel assemblies are from CP&L's Robinson Plant.

In addition to the spent fuel, 60 new fuel assemblies received from Westinghouse are in dry storage racks.

MISKDATAREP$2%0S4

CPbL. CO gg'INT PERFORMANCE DATA SYSTEM

, RUM DATE 30/08/92

~

OPERATING DATA REPORT RUH TIME - 14:13:57 HARRIS UNIT 1

PAGE RPD36-000 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY AMANDA CREHSHAM TELEPHONE (919)362-2808 2 ~

3 4 4,

5 4 6.

7 i 8.

UNIT NAME:

HARRIS UNIT 1

NOTES REPORTIHG PERIOD:

SEPTEMBER 92 I

LICENSED THERMAL POWER

<MWT): 2775 I

See Operations Summary.

HAMEPLATE RATING (GROSS NWE): 950.9 I

DESIGN ELECTRICAL RATING (NET MWE): '900.0 NAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 I

MAX DEPENDABLE CAPACITY (NET MWE): 860.0 IF CHANGES OCCUR IH CAPACITY RATINGS <ITEMS 3 THRU 7)

SINCE LAST REPORT, GIVE REASONS:

N/A POWER LEVEL TO WHICH RESTRICTED IF AHY (HET NWE):

95/

REASONS FOR. RESTRICTION IF ANY:

Due to problems with Governor Valve !/4, unit power was maintained at 95/ until the plant entered Refueling Outage number 4.

The governor. valve will be repaired during the outage.

THIS MONTH YR TO DATE CUMUL ATIVE HOURS IH REPORTING PERIOD 720.00 12.

NUMBER OF HOURS REACTOR CRITICAL 268.22 33.

REACTOR RESERVE SHUTDOWN HRS

.00 I4.

HOURS GENERATOR ON LINE 268.22 f5. UNIT RESERVE SHUTDOWN HOURS

.80 f6.

GROSS THERMAL ENERGY GEH.

(NWH) 698101.20 f7.

GROSS ELEC.

ENERGY GEH.

(MWH) 231540.00 18.

NET ELEC.

ENERGY GENERATED (MWH) 209)77.00 UNIT SERVICE FACTOR 37.25 20.

UNIT AVAILABIL1TYFACTOR 37 25 21.

UNIT CAP.

FACTOR (USING MDC NET) 33.78 22.

UNIT CAP.

FACTOR (USING DER HET) 32.28 23.

UNIT FORCED OUTAGE RATE

.00 24*

SHUTDOMHS SCHED OVER HEXT 6 MOHTHS (TYPES'ATEJ Refueling Outage number 4 began on September 12, for completion November 21, 1992.

6575.00 47496.00 5806.17 38794.17

.00

.00 5777.05 38333.15

.00

.00 (5539291.82 101535416.30 5197085.00 33798448.00 4852892.00 3)45)555.00 87.86 80.70 87.86

80. 70 85.82 77.00 82.0$

73.58 5.65 4.13 AND DURATION OF EACH):

1992 and is scheduled 25.

26.

IF SHUTDOWN AT EHD OF REPORT

PERIOD, ESTIMATED DATE OF START 'UP: 11-10 (Init. Crit.)

UNITS IH TEST STATUS (PRIOR TO COMNERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION MIS/DATAREF/3/OS4 1.16 9

E lf )

CPIlL,. CO iNT PERFORHANCE DATA SYSTEH

~.RUN 'DATE 10/08/92 APPEAR IX B AVERAGE DAILY POWER LEVEL RUN TIHE 14:13:57 KARRIS UNIT i PAGE RPD39-000 SEPTEHBER DOCKET NO. 050-400 COHPLETED BY AHANDA CRENSHAW TELEPHONE (919)362-2808 DAY AVG. DAILY POWER LEVEL (HWE-NET)

DAY AVG. DAILY POWER LEVEL (HWE-NET) 827 18

-f2 825 20 827 828 827 801 797 22 2$

798 27 36 t5 f.fh 8 MIS/DATAREP/4/OS4

h E

5V H

O UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: September 1992 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Harris 10/06/92 A. P. Crenshaw (919) 362-2808 No.

Date T1 y

P e

Duration (Hours)

R~

e a

s 0

n Method of Shutting Down Reactor'icensee Event Report ¹ System Code 4 Component Code 5 Cause & Corrective Action to Prevent Recurrence 92416 920911 S

0.00 N/A ZZ ZZZZZ Unit ramped down in preparation for refueling outage 4 which commenced on 9/1 2/92 at 04:13.

1 F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG%161) 5 Exhibit 1 -Same Source

UNIT SHUTDOWNS AND POWER REDUCTION 1>>

f~ ~

Ik4r 4

~

~

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Harris 10/06/92 A. P. Crenshaw (919) 362-2808 REPORT MONTH: September 1992 No.

92%17 Date 920912 T'

P e

Duration (Hours) 451.78 R~

e a

s 0

n Method of Shutting Down Reactor'icensee Event Report ¹ N/A System Code 4 ZZ Component Code 5 ZZZZZ Cause 8c Corrective Action to Prevent Recurrence Unit was shutdown for the scheduled cycle 5 refueling outage.

1 F:

Forced S:

Scheduled 2

Reason:

A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4

Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG%1 61) 5 Exhibit 1 - Same Source

p

~