September 16, 1992 Docket No. 50-400 LICENSEE:
Carolina Power
& Light Company FACILITY:
Shearon Harris Nuclear Power Plant, Unit 1
SUBJECT:
SUMMARY
OF AUGUST 14,
- 1992, MEETING REGARDING LICENSING ACTIVITIES A meeting was held with Carolina Power
& Light Company on August 14, 1992, in Rockville, Maryland.
The purpose of the meeting was to discuss the status and schedule of licensing activities for Harris.
Enclosure 1 is the list of attendees and Enclosure 2 is the hand-out used for discussion at the meeting.
The discussion covered the status of license amendments in process and other licensing matters needed to support the refueling outage that began on September 12, 1992.
The staff also discussed with the licensee on issue regarding the failure of radi ation monitor RM-ll, which is related to LER 91-004.
ORIGINAL SIGNED BY:
Ngoc B. Le, Project Manager Project Directorate II-1 Division of Reactor Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc:
See next page OFFICE L
1:
E PM: PD21:DRPE D: PD21: DRP NAME Date PA derson l b/92 NLe 6/92 Adensa 0/ 4/92 Document Name:
HAR.MTS t/
9209240i70 9209ib PDR ADOCK '05000400 P
'1 I
Mr. R. A. Watson Carolina Power 8 Light Company Shearon Harris Nuclear Power Plant, Unit 1
CC:
Mr. H.
Ray Starling Manager Legal Department Carolina Power 8 Light Company P. 0.
Box 1551
- Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U. S. Nuclear Regulatory Commission Route 1,
Box 315B New Hill, North Carolina 27562 Mr. Gerald E. Vaughn, Vice President Harris Nuclear Project Harris Nuclear Plant P. 0.
Box 165 New Hill, North Carolina 27562 Mr. H. A. Cole Special Deputy Attorney General State of North Carolina P. 0.
Box 629
- Raleigh, North Carolina 27602 Public Service Commission State of South Carolina P.O.
Drawer 11649
- Columbia, South Carolina
. 29211 Mr. R. A. Watson, Senior Vice President Nuclear Generation Carolina Power 5 Light Company Post Office Box 1551
- Raleigh, North Carolina 27602 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30323 Mr. C. S. Hinnant Plant General Manager Harris Nuclear Plant P. 0.
Box 165 New Hill, North Carolina 27562 Mr. Dayne H. Brown, Director Division of Radiation Protection N.
C. Department of Environmental, Commerce S. Natural Resources P. 0.
Box 27687
- Raleigh, North Carolina 27611-7687 Mr. R.
B. Starkey Vice President Nuclear Services Department Carolina Power
& Light Company P. 0.
Box 1551
- Raleigh, North Carolina 27602
DISTRIBUTION w Enclosures 1 and 2
EDocket Fi'1~e NRC
& Local PDRs PD21 Reading THurley/FHiraglia JPartlow SVarga GLainas PAnderson w o Enclosure 2
NLe PLoeser JHauck GGarten NLe EAdensam OGC
- EJordan, ACRS (10)
JWechselberger, EDO EMerschoff, RII
p ~,'Q()P.5
CP8L/NPC Meeting August 14, 1992 ENCLOSURE 1
Names NLe PLoeser JMauck GGarten LRowell COlexik BPrunty EAdensam Or anization NRR/PDI I-1 NRR/SIC B NRR/SIC B NRR/SICB CP8L/NUC Licensing CPKL/Reg Compliance CP5L/Nuc Licensing NRR/PD II-1
SHNP 8-MO R
S AUGUST 1992 PAGE 2
~SS 1992 S
V
- ~*~*ks*
1993
/35 LIMITING COND FOR OP ACTION REQ (TSC 87-12)
- RESPONSE TO RAI ISSUE TSC bees 9/25
~ssses 11/14
/4 RETS REMOVAL OF TABLES FROM TS CP&L SUBMITTAL ISSUE TSC ass 7/21 sssesrsssssaesssessssess 1/22
/4 NAD FUNCTIONAL CHANGES (TSC 91-04)
~eees 8/6
~ s ~ ss ~ss ~ssssssss
~ s ~ s ~ s ~ 2/6
/18 ESFAS SURVEILLANCE TESTING (TSC 90-
)
~sssss 10/16
~ e ~ e ~ s ~ s ~ se ~os~s ~ s ~ssss ~ 4/15
/4 MOLDED CASE CIRCUIT BREAKERS (TSC 88-12)
~ssseesssse 1/22
~esseasesssaeaesesseeeee 7/22
/4 PRESSURE/TEMPERATURE LMTS REVISION (TSC 92-
)
~aeesasessss 1/29
~ sassaeseaaeeeeeaeaeaaae 7/31 ates prior to 8/12/92 are actualap Dates after 8/12/92 are forecasts RD ~ REQUIRED DATEg
- s*s**~~ SCHEDULED OUTAGE
SHN P
8- 0 ATTACHMENT 2 AUGUST 1992 PAGE 1
c~T~~R 1992 1993 a/3 CONTAINMENT ISOLATION VALVES TSC (TSC 90-01)
ISSUE TSC assessee 8/31
)/18 FLOW MEASUREMENT CALIBRATION (TSC 90-07)
ISSUE TSC
~ sssssss 9/1 RD
ISSUE TSC ssssssss 9/1 RD
)/4.
AFW PUMP SURVEILLANCE TSC (TSC 91-01)
ISSUE TSC
~ sssssss 9/1 RD
- CPfcL SUBMITTAL (REVISION)
ISSUE TSC
~ 7/10
~esassa 9/1 RD
/4 INSTRUMENTATION CHANGE (TSC 88-10)
ISSUE TSC
~ eaeeeeseeee 10/2 r/4 DC ELECTRICAL POWER ISSUE TSC
~ se ~ e ~ e ~ s ~ e ~ e ~sssses
~ e ~ e 12/29 i/4 GAS STORAGE TANKS (TSC 92-01)
CP&L SUBMITTAL ISSUE TSC esse 8/31
~aseseseseaeesaesasaseee 2/26
)ates prior to 8/12/92 are actualeg Dates after 8/12/92 are forecasts RD ~ REQUIRED DATEg
- a*** s SCHEDULED OUTAGE
SHNP AUGUST 1992 PAGE 3
- A'~PR SSUE 1992
- 4*
1993
?G/4 NEGATIVE FLUX RATE TRIP DELETION (TSC 91-
)
~ssaeess 9/1
~ s ~ s ~ s ~ s ~ss ~siss Dates prior to 8/12/92 are actualsg Dates after 8/12/92 are forecasts RD ~ REQUIRED DATEg
- ~*~****~ SCHEDULED OUTAGE
SHN 8-O AUGUST 1992 PAGE 4
C~~PR 1992
- 1*0**1**
1993 3A/4 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM DATA CP&L SUBMITTAL
~ e ~ e ~ s ~ s 8/28 3B/4 REVIEW OF (RESPONSE TO GL 88-20'UPP 4
SUBMIT A-46 PROGRAM)
CP&L SUBMITTAL
~eeeessese 9/18 3C/4 ANNUAL FSAR AMENDMENT CP&L SUBMITTAL sess 10/24 3D/4 BULL 88-11 (PRESS SURGE LINE THERMAL STRAT)
CP&L SUBMITTAL
~ esseessesss 12/31 3E/4 SUBMIT GOALS & OBJ '(1993 EMERG EXERCISE)
CP&L SUBMITTAL
~ ee ~ 5/1 3F/4 SUBMIT SCENARIO
& CONT INFO (1993 EMERG EXERCISE)
- CP&L SUBMITTAL aces 6/1 3G/4 GL 88-20:
SUBMIT IPE PRA FOR SEVERE ACCIDENT VULNERABILITIES (10CFR 50.54(F))
SUBMIT IPE PRA secs 8/31 Dates prkor to 8/12/92 are actualsg Dates after 8/12/92 are forecasts RD ~ REQUIRED DATEg
- s****~*~ SCHEDULED OUTAGE
08/13/92 CAROLINA POMER 6 LIGHT CONPAHY S H H P P 18 NONTH REGULAlORY AGEHDA FACTS ~
SITE AGENCY PRI SOURCE DOCUNENT UNIT HUC PRI/SCH IND ISSUE ACTIOH 98G0162 1
SHNPP HRR SITE REQUEST, GL 9IW 03/28/90 ZIA 3
SHHPP~NTAINNEHT ISOLATIOH VALVES TSC SUBNITTED 7/29/91; AMAITIHG HRC REVIEM 6 (TSC TO REVISE TS 3.6.3 TO NAKE TS 3.0.h APPROVAL.
(HRC HAS PREHOTICED).
HOT APPLICABLE).
(TSC 90-01)
(D.C.
COOK MILL BE lHE LEAD PLAHT FOR HRC REVIEM).
(HRC TAC 4 N81210) 90GeM 2
SHHPP HRR SITE REQUEST 10/23/90 Z(B 18 SHHPP~OM NEASUREISff CALIBRATIOH (EXT OF SURVEILLANCE FROX 7 TO 21 DAYS)
(ANEHDNEHT REQUESTED PRIOR TO RFO Ch).
(TSC 9')
TS h.2.3.5 (HRC lAC v N823h9)
SUBNITTED 12/16/91; AMAITIHG NRC REVIB 6 APPROVAL; (PRENOTICED 2/19/92).
98G8008 2
SHHPP SITE REQUEST 07/2h/90 ZIC SHHPP TSC - S/G F% TUBE PLUGGIHG CRITERIA FOR CRACKS MITHIH THE lUBE SHEET REGIN; (ANENDMEHT AEQUESTED PRIOR TO RFO Ch)
(HRC TAC N 4828(5]
SUBMITTED 2/7/92.
AMAITIHG HRC AEVIEM 6 APPAOVAL.
(PREHOTICED h-(-92).
98G0362 QNPP HRR SITE REQUEST 11/05/90 ZID h
SHNPP~
PUNP SURVEILLANCE TESTIHG (NODIFIES SDAFM SURV. TO NATCH NDAFM SURV. Am ALLOMS TESTIHG AT FULL FLOM)
(TS 9541)
AN. AEQUESTED PRIOR TO RFO h.
INRC TAC v N82867)
SUBNITTED 2/27/92.
AMAITIHG HRC REVIEM 6 APPROVAL.
(PREHOTICED h-(-92).
91G8h55 2
SITE REQUEST SHHPP HRR 12/8h/91 ZIE SHNPPMMST BOROH COHCEHTRATIOH TSC (ANENDNEHT REQUESTED PRIOR TO RFOwh)
(HRC TAC v N829h'I'I SUBNITTED 3/10/92.
REVISIOHS SUBNITTED 5/11/92 AHD 7/18/92; AMAIlINGHRC REVIB AHD APPROVAL.
(PAEHOTICED h/15/92 AHD 8/5/92).
08/13/92 CAROLIHA POMER L LIGHT CONPANY S H H P P 18 NONTH REGULATORY AGENDA FACTS 0
.SITE PRI SOURCE DOCIEHT AGEHCY UNIT HUC PRI/SCH IHD ISSUE ACTIOH 88G8863 2
SITE REQUEST SHNPP 02/89/88 Z1F h
SHXPP - INSTRUNEHTATION CHANGE TSC SUBNITTED h/2/92.
AMAITIHG HRC REVIEM (CLARIFIES, CORRECTS 6 ANEHDS 6 IHSTRUN.
AHD APPROVAL; (PREHOTICED 6/2h/92);
TECH SPECS)
PER HRC PN CONNEHTS, COL TO SUBNIT REVISED TS PAGE.
(TSC 88-10)
TS 3.3 92G8239 2
SHHPP XRR SITE REQUEST 05/28/92 Z(G h
SHHPP TSC - DC ELECTRICAL POMER SYSTEN SUBNITTED 6/29/92.
(PROVIDES ACTIOH STATENEHT TO ALLOM HAVING BATTERY CHARGER OUT-OF-SERVICE)
(TSC 92-02) 92G0173 2
SITE REQUEST SHNPP 1
HRR 8h/15/92 Z(H h
SHNPP-TSCWS STORAGE TA)IS (LINIT QUANTITY OF RADIOACTIVITYIH EACH TAN FRON 1.85 E5 CURIES TO 86,825 CURIES)
TS 3.11.2.6 (TSC 92-81)
AMAITIHG HEM PLANT INPUT.
92G8325 2
HRC-92-381 SHHPP HRR 87/09/92 Z2A 35 SHHPP~C LETTER: ANEHDNEHT REQUEST ON HRC REQUEST UNDER REVIEM.
LINITIHG CONDITIOH FOR OPERATIOH ACTIOH REQUIRENEHTS 88G8866 2
SHHPP 1
SITE REQUEST 10/1h/88 Z2A 35 SHXPPMINITIHG CONDITIONS FOR OPERATOR ACTION REQ'NNTS (ALLOMS PLACING PLT IHTO A NODE MHERE TS IS HO LONGER APPLICABLE)
TS 3.1.2.2.3/3.1.2.h/3.7.1.1 (TS 87-12)
(HRC TAC '79h(8)
SUBNITTED 12/28/98; AMAITIHG HRC REVIEM 6 APPROVAL. (PREHOTICED 2/28/91).
NRC REQUEST FOR ADDITIONALACTIOH REC'D 7/28/92.
08/13/92 CAROLINA POMER 6 LIGHT COKPAHY S H H P P 18 KOHTH REGULATORY AGENDA FACTS v SITE PRI SOURCE DOCUKEHT AGENCY UHIT HUC PRI/SCH IND ISSUE ACTIOH 89G0515 1
SITE REQUEST; GL 8941 1/31/89 SHHPP - RADIATIOH EFFLUEHT/EHVIROHKEHTAL SUBKITTED 7/21/92.
AMAITIHG HRC REVIEM SHHPP 1
(HRC-89-082)
KOHITORIHG (REKOVAL OF TABLES FRON TS)
AHD APPROVAL.
HRR 10/29/89 Z2B TSC 87-04 (ORIG HLS-88-034 DTD 2/16/88)
TS 3.3.3.10/3.11.1.1 90G0318 2
HAD ORG.
CHANGE COHV.
SHHPP 1
MITH H.
BOMLES HRR 08/17/90 Z2C SHHPP-TECH SPEC CHANGE - NUCLEAR ASSESSKEHT DEPARTKEHT FUHCTIOHAL CHAHGES (INCLUDES POTEHTIAL TSC SAFETY REVIEMS)
(IHTERHAL DUE DATE)
SUBMITTED 8/06/92.
AMAITIHG HRC REVIEM.
89G0516 2
MCAP-10272-A SUPP 2, REV 1
SHHPP HRR 05/01/89 Z2D 18 SHHPP-ESFAS SURVEII.LAHCE TESTIHG (TSC TO INCREASE ALLOMED OUTAGE lIKES 6 SURVEILLANCE INTERVAL FOR ESFAS INSTRU-KEHTATION).
(TS 3.3.2)
(TSC 89-
)
NED MORK SCOPE PLACED OH HOLD BY PLANT.
PLAHT ASSESSIHG COST/BEHEFIT OF CHAHGE.
89G0530 1
SITE REQUEST SHHPP HRR 03/18/88 Z2E QNPP K(LDED CASE CIRCUIT BRENERS (COHTAIHKEHT PEHETRAllOH CONDUCTOR OVER-CURREHT PROTECTIOH TEST REVISIOH)
TSC 88-12 TS 4.8.4.1 TECH.
SPEC CHANGE.
AMAITIHG PLAHT APPROVAL OF PCR 2465, REV 0.
92G0229 2
SHHPP HRR SITE REQUEST 05/13/92 Z2F SHHPP-TSCWESSURE/TE)IPERATNE LINITS AMAITING IHPUT FROK HED.
COHSERVATIVE REVISIONS:
SUBNIT REPLACEKEHTS FOR HEED DATE 8/92 BASED OH 90 VS. 70X 5 EFPY P/T LIKITS CURVES CAPACITY FACTOR.
(BASED ON LAST CAPSULE ANALYSIS)
(}8/13/92 CAROLINA POMER & LIGHT CONPAHY S H H P P 18 NONTH REGULATORY AGENDA FACTS v SITE PRI SOURCE DOCUNEHT AGEHCY UNIT NUC PRI/SCH IHD ISSUE ACTION 91G(}414 2
SHNPP 1
HRR SITE REQUEST 18/16/91 Z2G 4
SHNPPMEGATIVE FLUX RATE TRIP DELETIOH NFS TO PROVIDE INPUT.
(TS 3/4.3.1)
(ANEKD}(EHT REQUESTED PRIOR TO RFO '5).
92G(}(}97 2
SHNPP 1
HRR Z3A SHNPP:
t(}CFR26.71 (D) - SEHIANNUAL FITNESS FOR DUTY PROGRAH DATA.
92G0318 2
HRC-92-351, HRC'S SSER SHNPP:
REVIEM OF RESPOHSE TO GL 88-2(},
SHNPP 1
(}5/22/92 (SUP.
TO GL 87%2)
SUP. 4, INDIVIDUALPLAHT EXAH FOR NRR 86/26/92 Z3B EXENRHAL EVEHTS 92G8113 2
SHNPP HRR SHNPP-AHNUAL FSAR A}(EHD}(ENTHO. 44 91GB349 2
NRC-91-486; BULL 88-11 SHHPP HRR
(}8/19/91 Z3D 4
SHNPP-PRESSURIZER SURGE LIHE THERHAL STRATIFICATIOH (BULLETIN 88-11)
HRC REQUIRES A HOTIFICATIOH MEH NODS. ASSOCIATED MITH BULLETIH 88-11 HAVE BEEH INPLENEHTED.
08/13/92 CAROLIHA POMER 4 LIGHT CONPAHY S H H P P 18 NOHTH REGULATORY AGEHDA FACTS v , SITE PRI SOURCE DOCUNEHT AGENCY UHIT HUC PRI/SCH IHD ISSUE ACTIOH 06/16/92 Z3E 92G0250 2 10CFR50 SHHPP 1 HRR SHHPP SUBNIT GOAlS 4 OBJECTIVES FOR 1993 FULL SCALE EXERCISE TO HRC SUBNITTAL REQ'D 75 DAYS PRIOR TO EXERC. (EXERCISE SCHEDULED 7/27/93). DUE DATES ARE APPROXINATE. 07/15/92 Z3F h 92G0268 2 10CFR50 SHHPP HRR SHHPP-SUBNIT SCENARIO 4 CONTROLLER IHFO SUBMITTAL REQ'D h5 DAYS PRIOR TO EXERC. FOR 1993 FULL SCAlE EXERCISE TO HRC (EXERCISE SCHEDULED 7/27/93). DUE DATES ARE APPROXINATE. 89G05h2 2 CP6L LTR (HLS-89-290) SHHPP HRR 10/31/89 Z3G h SHHPP-GEHERIC LETTER 88-20; IHDIVIDUAL SUBNIT IPE PRA. CHS PREPARIHG. CPKL PLAHT EXANIKATIOHFOR SEVERE ACCIDEHT SUBNITTAL DATE REVISED PER HLS-91-080 VULHERABILITIES (10CFR50.5h(F) DATED 3/21/91. 90G0231 5 SHHPP HRR SITE REQUEST 06/27/90 Z5 1h SHHPP POTEHTIAL TSC TO CLARIFY ULTINATE AMAITIHGSITE IHPUT BASED OH PCR 53h2 HEAT SINK SPEC 3/h.7.5 ACTIOHS (PCR DEVELOPNEHT 6 SCHEDULE TO BE ESTABLISHED). (TSC 90- ) 90G0221 5 SITE REQUEST SHHPP HRR 06/(h/90 Z5 h SHHPP-COHTAIKNEHT LINER TENPERATNE (REVISES DESIGH FEATURES SECTIOH TO REFEREHCE LIHER TENP VS. PEAX AIR TENP) TS 5.2.2 (TS 90- ) TECH SPEC CHAHGE; AMAITIHG PLAHT IHPUT.
88/13/92 CAROLIHA POWER h LIGHT COMPANY S H H P P 18 HOHTH REGULATORY AGEHDA FACTS 4 SITE PRI SOURCE DOCIEHT AGEHCY UNIT HUC PRI/SCH IHD ISSUE ACTIOH 91&8415 5 SITE REQUEST SHHPP HAR 18/11/91 Z5 4 SHHPP DIESEL GEHERATOR SLOW START TESTING TSC (TS 3.8.1.1) AWAITING SITE IHPUT AHD PRIORITY. 88G&859 5 SHHPP 1 SITE REQUEST 82/17/88 Z5 35 SHHPP - AIRLOCKS TSC (REV. TIME ALLOWED TO HAVE OUTER AIRLOCK DOOR OPEH TO AEPAIR INOPERABLE IHHER AIRLOCK DOOR). (TSC 88-88) TS 3.6.1.3 TECH SPEC CHANGE - PRIORITY AHD SCHEDULE UHDER EVALUATION. 98G&884 5 SHNPP 1 SITE AEQUEST 87/18/98 Z5 4 SHNPP RAB/FHB ENERGEHCY EXHAUST HVAC (REVISE RAB & FHB HVAC TSC TO NATCH CR HVACTS) TS 3.7.7 6 3.9.12 (TSC 98- ) TSC AWAITIHG PLT IHPUT. 8&G&888 5 SITE REQUEST SHHPP 12/13/88 Z5 24 SHHPP ACCUNULATORS TSC (PROVIDE ALTER-KATE ACCUNULATOR LEVEL/PRESSURE SURVEIL-LANCE NETHOD WHEK ALARN CIRCUITS INOPER-ABLE OR OUT OF SEAVICE) (TSC 8&%ii) TS 3.5.1 TECH SPEC CHANGE - PRIORITY AHD SCHEDULE UHDER EVALUATIOH.