ACCELERATED DISTMBUTION DEMONSTjRATION SYSTEM REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.
Carolina Power
& Light Co.
VAUGHNiG.E.
Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
SUBJECT:
M o crating rept for June 1992 for Harris Unit l.
/920715 r.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
D S
05000400 RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EGGG BRYCEgJ.H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA LPEB10 EG FIL 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 A
D D
R D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE!,CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
0
G. E. VAUGHN Vice President Harris Nuctear Project CHILL Carolina Power & Light Company P.O. Box 165 ~ New Hill,NC 27562 HARRIS NUCLEAR PROJECT P.
O.
Box 165 New Hill, North Carolina 27562 JUL 1
5 1992 File Number:
SHF/10-15505 Letter Number:
HO-923023 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of June 1992
'ours very truly, APC:nrm G ~
E. Vaughn Vice President Harris Nuclear Pro3ect Enclosure cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. R.
G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP)
MEM/DATAREP/1/OS4 f UO J m07i70iis 9VOC So-PDR ADOCK 05000400 R
'PDR
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY'50-400 Harris Unit 1 June 1992 Amanda Crenshaw OPERATIONS
SUMMARY
Harris Unit 1 operated at 100 percent Availability Factor for the referenced month and a 98.92 percent Capacity Factor.
There was one significant power reduction in.June.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in 'the reactor vessel, 731 spent fuel assemblies stored in the Spent Fuel Pools.
413 of the spent fuel assemblies are BWR and were shipped to Harris from CPGL's Brunswick Plant.
154 of the spent fuel assemblies are from CP&L's Robinson Plant.
MEM/DATAREP/1/OS4
a CPbL
$0 RUH 'DATE 07/87/92 RUN'TIME
<4:43:49 ANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 3
PAGE RPD36-000 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY AMANDA CREHSHAW TELEPHOHE
<919)362-2808 2 4 3 4 4,
5 k 6.
7 J 8.
UNIT NAME:
HARRIS UNIT 1
NOTES REPORTIHG PERIOD:
JUNE 92 I See Operations Summary.
LICENSED THERMAL POWER
<MWT): 2775 I
NAMEPLATE RATING (GROSS MWE): 950.9 I
DESIGN ELECTRICAL RATING (NET MWE): 900.0 MAX DEPEHDABLE CAPACITY <GROSS MWE): 920.0 MAX DEPENDABLE CAPACITY (HET MWE): 860.0 IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
None.
9.
18.
POWER LEVEL TO WHICH RESTRICTED IF AHY (NET MWE):
None.
REASONS FOR RESTRICTION IF ANY:
N/A THIS MONTH YR TO DATE CUMUL ATIVE HOURS IH REPORTING PERIOD 720.80 4367.80 45288.88 12.
NUMBER OF HOURS REACTOR CRITICAL 720.80 4240.62 37228.62 13.
REACTOR RESERVE SHUTDOWN HRS
.00
.80
.00 14.
HOURS GENERATOR OH LINE 720.00 4233.82 36785.12 15.
UNIT RESERVE SHUTDOWN HOURS
.08
.00
.80 16.
GROSS THERMAL ENERGY GEH.
(MWH) 1967117.58 11429472.42 97405596.98 37.
GROSS ELEC.
ENERGY GEH.
(MWH) 652279.80 3841385.08 32442748.00 1 8.
NET ELEC.
ENERGY GENERATED (MWH) 612528.08 3597547.80 30196218.88 19.
UNIT SERVICE FACTOR 108.08 96.89 81.22 20.
UNIT AVAILABILITYFACTOR 180.88 96.89 81.22 21.
UNIT CAP.
FACTOR (USING MDC NET) 98.92 95.79 77.53 22.
UNIT CAP.
FACTOR (USING DER HET) 94.53 9$.53 74.08 23.
UNIT FORCED OUTAGE RATE
.08 3.f1 3.77 24.
SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS (TYPE,
- DATE, AHD DURATION OF EACH):
Refueling Outage number 4 scheduled to begin September 12, 1992 and be completed November 12, 1992.
- 25. IF SHUTDOWN AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
26.
UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY IHITIAL ELECTRICITY COMMERCIAL OPERATION MEM/DATAREP/2/OS4 1.f6 9
'V CPb1.
QO RUH 'DATE
. 07/07/92 RUN '~TIME 3 4: 43: 48 AHT PERFORMANCE DATA SYSTEM APPENDIX B AVERAGE DAILY POWER LEVEL HARRIS UNIT 1
PAGE RPD39-080 JUNE f992 DOCKET NO. 050-400 COMPLETED BY AMANDA CREHSHAW TELEPHONE (919)362-2808 DAY AVG. DAILY POWER LEVEL (MWE"HET) 867 865 DAY AVG. DAILY POWER LEVEL (MWE-NET) 834 857 859 857 20 824 837 847 873 10 f2 853 859 858 858 846 860 25 26 3e 865 861 S63 865 867 866 863 857 858 1.16 - 8 MEM/DATAREP/3/OS4
~
4 t
1
~
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:
Harris DATE:
07/07/92 COMPLETED BY: A. P. Crenshaw TELEPHONE:
(919) 362-2808 I
V
~
r REPORT MONTH: June 1992 No.
Date T
y p
e Duration (Hours)
R~
e a
s 0
n Method of Shutting Down Reactor'icensee Event Report //
System Code 4 Component Code 5 Cause & Corrective Action to Prevent Recurrence 92-009 920612 S
0.0 N/A HA Valve Reduced unit power to 80% to perform turbine valve test.
The test was satisfactorily completed and the unit returned to 100% at 22:00 on 6/1 3/92.
While power was reduced, also performed Isophase Bus Duct Cooling Fan Repair.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-01 61)
'5 Exhibit 1 - Same Source
0.
\\
'A l ~
S C
~
P 1