Monthly Operating Rept for May 1992 for Harris Unit 1.W/ 920615 Ltr
ML18010A674
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/31/1992
From: Crenshaw A, Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-923021, NUDOCS 9207130090
Download: ML18010A674 (10)


Text

'CCELERATED DISTIIJBUTION DEMONSTPATION SYSTEM REGULAY INFURIATION DISTRIBUTZOLYSTEM (RIDE)

DOCKET ¹ FACIL:bg.-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION CRENSHAW,A. Carolina Power & Light Co.

VAUGHN,G.E. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION R

SUBJEC  : Monthl operating rept for May 1992 for Harris Unit 1.W/

20615 ltr.

DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR j ENCL J SIZE: D TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400

/

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 3 3 PD2-1.PD 1 1 D LE,N 1 1 D

INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NR~J LPEB10 1 1 NRR/DOEA/OEAB 1 1 LE 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCEFJ.H 1 1 NRC PDR NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WACKE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0. Box 165 New. Hill, North Carolina 27562

<<~lN > 5 sea File Number: SHF/10-15505 Letter Number: HO-923021 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO. 1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1992.

Yours very truly, G. E. Vaughn Vice President Harris Nuclear Project APC:nrm Enclosure cc: Mr. S. D. Ebneter (NRC-RII)

Mr. R. G. Oehl (DOE)

Mr. J. E. Tedrow (NRC-SHNPP)

MEM/DATAREP/1/OS4 9207130090 92053l PDR ADOCK 05000400 R PDR

Iw y P C

J n

DOCKET NO.: 050-400 DATE'ay

~

UNIT: Harris Unit 1 1992 COMPLETED BY: Amanda Crenshaw OPERATIONS

SUMMARY

Harris Unit 1 operated at 100 percent Availability Factor for the referenced month and a 101.75 percent Capacity Factor. There was one significant power reduction in May. Details are provided on the Unit Shutdowns and Power Reduction Sheets.

There are 157 fuel assemblies in the reactor vessel, 731 spent fuel assemblies stored in the Spent Fuel Pools. 413 of the spent fuel assemblies aie BWR'and were shipped to Harris from CP&L's Brunswick Plant. 154 of the spent fuel

~ ~

assemolzes are from rnc v CPGL's~ ~

Rob.nscn 1 ~

"lan".

MEM/DATAREP/1/OS4

p e

Ja

CPhL CO PLANT PERFORMANCE DATA SYSTEM PAGF.

RUN DATQ 66/(0/92 OPERATING DATA REPORT RPD36-066 RUH', T'IML 3 4: 42: 63 HARRIS UNIT 3 DOCKET Nn. 056-466 COMPLETED BY AMAHDA CREHBHAW OPERAT1HG STATUS . TELEPHONE (939)362-2868 UNIT NAME: HARRIS UNIT ( I NOTES 2 4 REPORTIHG PERIOD: MAY '92 See 0 erations S mmar

3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9 I 5 4 DESIGN ELECTRICAL RATING (NET MWE): 900.0 I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7 4 MAX DEPENDABLE CAPACITY (HET MWE): 860.0
8. IF CHAHGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: None.
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (HET MWE): None.

$ 0. REASONS FOR RESTRICTION IF ANY: N/A THIS YR TO CUMUL MONTH DATE ATIVE HOURS IN REPORTING PERIOD 744.00 3647.06 44568.00

12. NUMBER OF HOURS RFACTOR CRITICAL 744.60 3520.62 36508.62
33. REACTOR RESERVE SHUTDOWN HRS .60 .00 .00
14. HOURS GENERATOR'H LINE 744.00 351$ .62 36665.12
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEH. (MWH) 2043667.62 9462354.84 95438479.32

$ 7. GROSS ELEC. ENERGY GEH. (MWH) 685632.66 3389166.66 31796469.66

18. HET ELEC. ENERGY GEHERATED (MWH) 6446<3.66 2985619.66 29583682.00 UNIT SERVICE FACTOR 166.66 96.27 80.92
26. UNIT AVAII ABILITY FACTOR 366.66 96.27 80.92
21. UNIT CAP. FACTOR (USING MDC NET) (66.75 95.17 77.18
22. UNIT CAP. FACTOR (USING DER HET) 96.27 90.94 73.75
23. UNIT FORCED OUTAGE RATE .00 3.73 3.84
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling Outage number 4 scheduled to begin September 12, 1992 and be completed November 12, 1992.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

$ .$ 6 " 9 MEM/DATAREP /2/OS A

a ~

~ '

CPbL CO PLANT PFRFARHANfF DATA RYRTFH PAGF

~

~

RON DATF RUNIHf

~

06/30/92 i 4: 42: 00 ~

APPg+IX 8 AVERAGE DAILY POWER LEV+P HARRI8 I.IN IT RPD39-00e nnfKET Nn, eSO-400 COMPLETED K<Y AHANDA CRENSHAW TFLEPHONF. (919)362-2808 DAY AVG; DAILY POWFR LEVEL DAY AVG. DAILY POWER LfVFL (HWE-NET) (HWE-NET) 888 871 868 870 i9 875 880 26 883 879 870 RS8 23'73 24 880 10 839 828 r" 7 814 874 866 P,9 30 864 870 3f 16 1.f6 8 MEN/DATAREP/3/084

UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME: Harris .

DATE: 06/09/92 COMPLETED BY: A. P. Crenshaw TELEPHONE: (919) 362-'2808 REPORT MONTH: May 1992 T' R~ Method Cause 8i Corrective No. Date Duration e of , Licensee System Compoi:, nt Action to P (Hours) a Shutting Event Code 4 Code 5 Prevent Recurrence e s Down Report ¹ 0 Reactor n

92%08 920510 S 0.0 N/A HA Valve Reduced unit power to 80% to perform turbine valve test. The test was satisfactorily completed and the unit returned to 100% at 09:00. During the power reduction, a 6.9 KV Emergency Bus Undervoltage Trip Test was also performed.

1 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failu:e (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Rest iction 4-Continued (NUREG%161)

E-Operator Training 8i License Examination .5-Reduced Load F-Administrative 6-Other 5 G&perational Errc. (Explain) Exhibit 1 - Same Source H-Other (Explain)

sp ~

I V

p I P PI

~

R ~

~ g ~ - p P ~ pp ~ R y~~