'CCELERATED DISTIIJBUTION DEMONSTPATION SYSTEM REGULAY INFURIATION DISTRIBUTZOLYSTEM (RIDE)
FACIL:bg.-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.
Carolina Power
& Light Co.
VAUGHN,G.E.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET ¹ 05000400 SUBJEC
- Monthl operating rept for May 1992 for Harris Unit 1.W/
20615 ltr.
DISTRIBUTION CODE:
ZE24D COPIES RECEIVED:LTR j ENCL J SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
R D
05000400
/
RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCEFJ.H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1.PD AEOD/DOA NR~J LPEB10 LE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WACKE! CONTACTTHE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24
Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0.
Box 165 New. Hill, North Carolina 27562
<<~lN
> 5 sea File Number:
SHF/10-15505 Letter Number:
HO-923021 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of May 1992.
Yours very truly, APC:nrm Enclosure G.
E. Vaughn Vice President Harris Nuclear Project cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. R.
G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP)
MEM/DATAREP/1/OS4 9207130090 92053l PDR ADOCK 05000400 R
I w y
P C
J n
DOCKET NO.:
~ 050-400 UNIT:
Harris Unit 1 DATE'ay 1992 COMPLETED BY:
Amanda Crenshaw OPERATIONS
SUMMARY
Harris Unit 1 operated at 100 percent Availability Factor for the referenced month and a 101.75 percent Capacity Factor.
There was one significant power reduction in May.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor vessel, 731 spent fuel assemblies stored in the Spent Fuel Pools.
413 of the spent fuel assemblies aie BWR'and were shipped to Harris from CP&L's Brunswick Plant.
154 of the spent fuel
~
~
rnc v
~
~
1
~
assemolzes are from CPGL's Rob.nscn "lan".
MEM/DATAREP/1/OS4
p e
Ja
CPhL CO RUN DATQ 66/(0/92 RUH', T'IML 3 4: 42: 63 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 3
PAGF.
RPD36-066 OPERAT1HG STATUS.
DOCKET Nn. 056-466 COMPLETED BY AMAHDA CREHBHAW TELEPHONE (939)362-2868 2 4 3.
4.
5 4 6.
7 4 8.
UNIT NAME:
HARRIS UNIT (
I NOTES REPORTIHG PERIOD:
MAY
'92 See 0 erations S mmar LICENSED THERMAL POWER (MWT): 2775 NAMEPLATE RATING (GROSS MWE): 950.9 I
DESIGN ELECTRICAL RATING (NET MWE): 900.0 I
MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 MAX DEPENDABLE CAPACITY (HET MWE): 860.0 IF CHAHGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASONS:
None.
9.
$ 0.
POWER LEVEL TO WHICH RESTRICTED IF ANY (HET MWE):
None.
REASONS FOR RESTRICTION IF ANY:
N/A THIS MONTH YR TO DATE CUMUL ATIVE 12.
33.
14.
15.
16.
$ 7.
18.
26.
21.
22.
23.
24.
25.
26.
HOURS IN REPORTING PERIOD 744.00 3647.06 44568.00 NUMBER OF HOURS RFACTOR CRITICAL 744.60 3520.62 36508.62 REACTOR RESERVE SHUTDOWN HRS
.60
.00
.00 HOURS GENERATOR'H LINE 744.00 351$.62 36665.12 UNIT RESERVE SHUTDOWN HOURS
.00
.00
.00 GROSS THERMAL ENERGY GEH.
(MWH) 2043667.62 9462354.84 95438479.32 GROSS ELEC.
ENERGY GEH.
(MWH) 685632.66 3389166.66 31796469.66 HET ELEC.
ENERGY GEHERATED (MWH) 6446<3.66 2985619.66 29583682.00 UNIT SERVICE FACTOR 166.66 96.27 80.92 UNIT AVAIIABILITY FACTOR 366.66 96.27 80.92 UNIT CAP.
FACTOR (USING MDC NET)
(66.75 95.17 77.18 UNIT CAP.
FACTOR (USING DER HET) 96.27 90.94 73.75 UNIT FORCED OUTAGE RATE
.00 3.73 3.84 SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS (TYPE,
- DATE, AND DURATION OF EACH):
Refueling Outage number 4 scheduled to begin September 12, 1992 and be completed November 12, 1992.
IF SHUTDOWN AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
$.$ 6 " 9 MEM/DATAREP /2/OS A
a
~
~ '
CPbL CO PLANT PFRFARHANfF DATA RYRTFH
~
RON DATF 06/30/92 APPg+IX 8 AVERAGE DAILY POWER LEV+P RUNIHf i 4: 42: 00
~
HARRI8 I.INIT
~
~
PAGF RPD39-00e nnfKET Nn, eSO-400 COMPLETED K<Y AHANDA CRENSHAW TFLEPHONF.
(919)362-2808 DAY AVG; DAILY POWFR LEVEL (HWE-NET) 888 DAY AVG. DAILY POWER LfVFL (HWE-NET) 871 868 870 880 883 i9 26 875 879 870 RS8 23'73 24 880 10 839 r"7 828 814 874 P,9 30 866 864 870 3f 16 1.f6 8 MEN/DATAREP/3/084
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: May 1992 UNIT NAME:
Harris DATE:
06/09/92 COMPLETED BY: A. P. Crenshaw TELEPHONE:
(919) 362-'2808 No.
Date T'
P e
Duration (Hours)
R~
e a
s 0
n Method of Shutting Down Reactor
, Licensee Event Report ¹ System Code 4 Compoi:, nt Code 5 Cause 8i Corrective Action to Prevent Recurrence 92%08 920510 S
0.0 N/A HA Valve Reduced unit power to 80% to perform turbine valve test.
The test was satisfactorily completed and the unit returned to 100% at 09:00.
During the power reduction, a 6.9 KV Emergency Bus Undervoltage Trip Test was also performed.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failu:e (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Rest iction E-Operator Training 8i License Examination F-Administrative G&perational Errc. (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued
.5-Reduced Load 6-Other 4