..- ACCELERATED DISTRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
&a'tet/9!
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.
Carolina Power
& Light: Co.
VAUGHN,G.E.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
SUBJECT:
Monthly operating rept ril 1992 for Harris Nuclear Project Dept Unit 1.
92051 tr.
DISTRIBUTION CODE IE24D COPIES RECEIVED LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
05000400 D
RECIPIENT ID CODE/NAME PD2-1 LA MOZAFARI,B.
INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR D~~ LPEB10 R
LE 01 NRC PDR COPIES LTTR ENCL 1
1 1
.1 1
1 1
1 1
1 D
D R
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOiVI Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISfS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 24 ENCL 24 D
D
C
Carolina Power 8 Light Company MAY f 5 1992 File Number:
SHF/10-15505 Letter Number:
HO-923017 Document Cont:rol Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specificat:ion 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation statistics and shutdown experience for the month of April 1992.
Yours very truly, APC:nrm G.
E. Vaughn Vice President Harris Nuclear Project Enclosure cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. R.
G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP)
MEMP)PTPPfP/1/OS4 9205190036 920430 PDR ADOCK 05000400 R,,
Irf IF t g
DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
050-400 Harris Unit 1 April 1992 Amanda Crenshaw OPERATIONS
SUMMARY
Harris Unit 1 operated at 100 percent Availability Factor for the referenced month.and a 101.77 percent Capacity Factor.
Two power reductions occurred in April.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor vessel, 731 spent fuel assemblies stored in, the Spent Fuel Pools.
413 of the spent fuel assemblies are BWR and were shipped to Harris from CPSL's Brunswick Plant.
154 of the spent fuel assemblies are from CP6L's Robinson Plant.
MEM/DATAREP/1/OS4.
CNL CO RUN DATE 05/06/92 RUN TIME 08:58:56 ANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1
PAGE RPD36-000 OPERATING STATUS DOCKET HO. 050-409 COMPLETED BY AMAHDA CREHSHAW TELEPHONE
<919)362-2868 4
2, 3 k 4 ~
5.
6.
7 ~
8.
UNIT NAME:
HARRIS UNIT i NOTES REPORTIHG PERIOD:
APRIL 92 I
LICENSED THERMAL POWER (MWT): 2775 See Operations NAMEPLATE RATING (GROSS MWE): 959.9 I
DESIGN ELECTRICAL RATING (NET MWE): '909.0 MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 MAX DEPENDABLE CAPACITY (HET MWE): 869.0 IF CHANGES OCCUR IH CAPACITY RATINGS (ITEMS 3 THRU 7>
SINCE GIVE REASONS:
None.
I I
Summary.
I I
I LAST REPORT,
<0.
POWER LEVEL TO WHICH RESTRICTED IF AHY <HET MWE):
- None, REASONS FOR RESTRICTION IF ANY:
N/A THIS MONTH YR TO DATE CUMUL ATIVE HOURS IH REPORTING PERIOD 1 2.
NUMBER OF HOURS REACTOR CRITICAL
$ 3.
REACTOR RESERVE SHUTDOWN HRS 34.
HOURS GENERATOR ON LINE 15.
UNIT RESERVE SHUTDOWN HOURS 36.
GROSS THERMAL ENERGY GEH.
(MWH>
17.
GROSS ELEC.
ENERGY GEN.
(MWH) 38.
HET ELEC.
ENERGY GENERATED
<MWH)'NIT SERVICE FACTOR'9.
UNIT AVAILABILITYFACTOR 23.
UNIT CAP.
FACTOR
<USING MDC NET) 22.
UNIT CAP.
FACTOR (USING DER HET) 23.
UNIT FORCED OUTAGE RATE 24.
SHUTDOWNS SCHED.
OVER HEXT 6 MONTHS Refueling outage number 4 currently completed by November 12, 1992.
719.69 7(9.00
.00 739.,00
.00 1986238.44 669649.09 629368.09 396.96 399.99 193.77 97.25
.00
<TYPE,
- DATE, scheduled to 2993.00 43824.00 2776.62 35764.62
.00
.60 2767.02 35323.32
.00
.00 7418687.22 93394833.76 2503494.09 3)194857.66 2340406.00 28939969.99 95.32 80.60 95.32 80.60 93.74 76.78 89.58 73.37 4.69 3.92 AHD DURATION OF EACH):
begin September 12 and be 25.
26, IF SHUTDOWN AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
UNITS IH TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.)6 - 9 HEM/DATAREP/2/OS4
(P
~
~
,PI'-aL CO
~NT PERFORMANCE DATA SYSTEM RU9" DATE 05/06/92 APPk~IX B AVERAGE DAILY POWER LEVEW RUH TIME 08:58:47 HARRIS UNIT 1
PAGE RPD39-000 APRIL DAY AVG. DAILY POWER LEVEL (MWE-HET) 883 886 886 DOCKET HO. 050-400 COMPLETED BY AMAHDA CREHSHAW TELEPHONE (9)9)362-2808 I
DAY AVG. DAlLY POWER LEVEL (MWE-HET) 870 874 874 885 884 882 20 871 873 30 880 878 876 875 874 849 26 27 877 872 864 853 881 883 883 875 29 30 881 864 1.16 8
MEM/DATAREP/3/OS4
a 0
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH: April 1992 UNIT NAME:
Harris DATE:
05/06/92 COMPLETED BY: A. P. Crenshaw TELEPHONE:
(919) 362-2808 No.
Date Tl y
P e
Duration (Hours)
R~
e a
s 0
n Method of
'hutting Down Reactor'icensee Event Report //
System Code 4 Component Code 5.
Cause & Corrective Action to Prevent Recurrence 92-006 920412 S
0.0 N/A HA Valve Reduced unit power to 80% to perform turbine valve test.
The test was satisfactorily completed and the unit returned to 100% at 07:00.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG%161) 5 Exhibit 1 - Same Source
~'I I
V
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:
Harris DATE:
05/06/92 COMPLETED BY: A. P. Crenshaw TELEPHONE:
(919) 362-2808 REPORT MONTH: April 1992 No.
92%07 Date 920425 T'
P e
Duration (Hours) 0.0 R~
e a
s 0
n A
Method of Shutting Down Reactor' Licensee Event Report ¹ N/A System Code 4 CH Component Code 5 INSTRU Cause 5, Corrective Action to Prevent Recurrence Reduced unit to 8&% power due to failure of "B Steam Generator preheater bypass valve.
Failure was caused by a blown varistor in the safeguards test cabinet B"
and a blown fuse in the Auxiliary Relay Panel.
Repairs were made and tests were satisfactorily completed.
Unit returned to 100% at 0600 on 4/26/92.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction operator Training & License Examination F-Administrative G-Operational Error (Explain)
Hther (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-01 61) 5 Exhibit 1 - Same Source
~
~
4.
~
4
)