ACCELERATED D TRIBUTION DEMONSTPATION SYSTEM S
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION CRENSHAW,A.
Carolina Power 6 Light Co.
VAUGHN,G.E.
Carolina Power 6 Light Co.
RECXP.NAME RECIPXENT AFFILIATION DOCKET 05000400
SUBJECT:
Monthly operating re or Mar 1992 for Harris Nuclear Project, Unit 1.
0415 tr.
DISTRXBUTXON CODE:
XE24D COPXES RECEIVED:LTR ENCL SIZE:
TXTLE: Monthly Operating Report (per Tech Specs NOTES:Application for permit renewal filed.
D 05000400 /
RECIPIENT ID CODE/NAME PD2-1 LA MOZAFARI,B.
INTERNAL: ACRS AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL EGGG BRYCE IJ
~ H NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA NRR/DLPQ/LPFB 0
EG~
NRC PDR COPXES LTTR ENCL 1
1 1
1 1
1 1
1 D
D R
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPXES REQUIRED:
LTTR 24 ENCL 24 D
D
'I l
Carolina Power & Light Company APR 1
5 1992 File Number:
SHF/10-15505 Letter Number:
HO-923014 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No. 1, Carolina Power & Light Company herewith submits the report of operation st:atistics and shutdown experience for the month of March 1992.
Yours very truly, APC:svm Enclosure G.
E. Vaughn Vice President Harris Nuclear Project cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. R, G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP)
~ 'j.COQUE MEM/DATAREP/1/OS4 9204210022 920331 PDR ADOCK 05000400 R
//p
I I 5 h
'(,l c I" II
DOCKET NO UNIT:
DATE:
COMPLETED BY:
050-400 Harris Unit 1 March 1992 Amanda Crenshaw OPERATIONS
SUMMARY
Harris Unit 1 operated at 81.72 percent Availability Factor for the referenced month and a 71.42 percent Capacity Factor.
One power reduction and one unit shutdown occurred in March.
Details are provided on the Unit Shutdowns and Power Reduction Sheets.
There are 157 fuel assemblies in the reactor vessel, 731 spent fuel assemblies stored in the Spent Fuel Pools.
413 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
154 of the spent fuel assemblies are from CP&L's Robinson Plant.
MEM/DATAREP/1/OS4
,CPhL CO RUN DATE 04/68/92 RUN TINE 12:54:46 t ANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 3
PAGE RPD36-060 OPERATING STATUS DOCKET HO. 050-400 COMPLETED BY AMANDA CREHSHAW TELEPHONE (919)362-2868 3 ~
4.
5.
6.
7*
8.
UNIT NAME:
HARRIS UNIT 1
NOTES REPORTIHG PERIOD:
MARCH 92 I
LICENSED THERMA POWER (NWT): 2775 I See Operations Summary.
NAMEPLATE RATING (GROSS MWE>: 950.9 I
DESIGN ELECTRICAL RATING <NET NWE): 960.0 NAX DEPENDABLE CAPACITY (GROSS MWE>: 920.0 I
MAX DEPENDABLE CAPACITY (HET NWE): 860.0 IF CHANGES OCCUR IH CAPAClTY RATINGS (ITEMS 3 THRU 7)
SINCE LAST REPORT, GIVE REASOHS:
None.
9.
30.
POWER LEVEL TO WHICH RESTRICTED IF ANY (HET MWE):
None.
REASONS FOR RESTRICTION IF ANY:
N/A THIS MONTH YR TO DATE CUNUL ATIVE 32.
13.
t4.
t5.
16.
<7.
18.
19.
20.
21.
22.
23.
24.
HOURS IN REPORTIHG PERIOD NUMBER OF HOURS REACTOR CRITICAL REACTOR RESERVE SHUTDOWN HRS HOURS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY GEN.
(MWH)
GROSS ELEC.
ENERGY GEH.
<NWH)
NET ELEC.
ENERGY GENERATED
<NWH)
UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAP.
FACTOR (USING NDC NET)
UNIT CAP.
FACTOR (USING DER HET)
UNIT FORCED OUTAGE RATE SHUTDOWNS SCHED.
OVER NEXT 6 MONTHS Refueling outage number 4 currently completed by November 12, 1992.
744.06 637.62
.60 668.02
.00 1482349.56 495557.00 456994.00 81.72 81.72 7t.42 68.25 18.28 (TYPE,
- DATE, scheduled to 2<84.66 43165.66 2057.62 35045.62
.00
.00 2048.02 34662.12
.60
.00 5432448.78 91468573.26 1833845.66 30435268.60 1711698.60 2836976).00 93.77 80.27 93.77 80.27 93.16 76.37 87.05 72.97 6.23 4.60 AND DURATION OF EACH):
begin September 12 and be 25.
26.
IF SHUTDOWN AT END OF REPORT
- PERIOD, ESTIMATED DATE OF START UP:
UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICAL1TY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.36 - 9 MEM/DATAREP/2/OS4
g'PaL r,a
~0NT PERFORMANCE DATA SYSTEM RUN DATE 04/08/92 APPENDIX B AVERAGE DAILY POWER LEVE.a.
-RUN TIHE 12: 54: 45 HARRIS UNIT PAGE RPD39-008 MARCH
$ 992 DOCKET NO. 050-400 COMPLETED BY AMANDA CRENSHAW TELEPHONE (9<9)362-2808 DAY AVG. DAILY POWER LEVEL (MWE-NET) 425 409 258 DAY AVG. DAILY POWER LEVEL (MWE-NET) 873 87'73 372 20 885 485 823 883 881 882 882 10 880 877
-40
.27 28 882 883
$ 4 664 876 879 878 30 885 873 88'EM/DATAREP/3/0S4 1.16 - 8
c UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:
Harris
'ATE:
04/08/92 COMPLETED BY: A. P. Crenshaw
,TELEPHONE:
(919) 362-2808 REPORT MONTH: March 1992 No.
92%04 Date 920229 T
y P
e Duration (Hours) 0.0 R~
e a
s 0
n Method of Shutting Down Reactor'icensee Event Report ¹ N/A System Code 4 CH Component Code 5 Pumpxx Cause & Corrective Action to Prevent Recurrence Reduced load to 50% for repairs on the "A" Main Feed Pump, which was experiencing excessive pump shaft movement.
Also made repairs on the "C" Main Transformer Oil Pump.
Load was further reduced to 35% during oil addition to the "A" and B" Reactor Coolant Pumps.
Unit returned to 100% power on 3/6/92.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction operator Training 5 License Examination F-Administrative G-Operational Error (Explain)
Hither (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-01 61) 5 Exhibit 1 - Same Source
C A
J
UNIT SHUTDOWNS AND POWER REDUCTION UNIT NAME:
Harris
'ATE:
04/08/92 COMPLETED BY: A. P. Crenshaw TELEPHONE:
(919) 362-2808 REPORT MONTH: March 1992 Date T1 y
P e
Duration (Hours)
R~
e a
s 0
Method of Shutting Down Reactor'icensee Event Report ¹ System Code 4 Component Code 5 Cause 5 Corrective Action to Prevent Recurrence 92-005 920307 135.98 N/A CJ VALVEX Unit Shutdown to repair small steam leaks on C Loop RTD Bypass Manifold Isolation Valves 1RC-22 and 1RC-953.
Both valves were sealed with valve body caps.
The unit returned to 100% on 3/14/92.
1 F:
Forced S:
Scheduled 2
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
1-Manual 2-Manual Scram 3-Automatic Scram continued 5-Reduced Load 6ther 4
Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-01 61) 5
- Exhibit 1 - Same Source
V I
I
'4