Text
August 12,
1991
Carolina'ower
and Light Company
ATTN:
Nr. Lynn W. Eury
Executive Vice President
Power Supply
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
SHEARON HARRIS NUCLEAR PLANT REgUALIFICATION EXAMINATION REPORT
50-400/91-300
This refers to the Nuclear Regulatory
Commission
(NRC) administered
requal-
fication examinations
conducted
by C.
Rapp during the weeks of July 15 and 22,
1991.
These
examinations
were administered
to employees
of your company
who
currently hold licenses
to operate
the Shearon
Harris Nuclear Plant.
At the
conclusion of the examination,
the examination questions
and preliminary
findings were discussed
with those
members of your staff identified in
Enclosure
1.
A copy of the written examination
questions
and answer
key was given to
members of your training staff.
A Requalification
Program Evaluation Report
is included
as Enclosure'.
This evaluation report finds the Shearon Harris-
Nuclear Plant requalification program remains satisfactory
based
on the
evaluation criteria of NUREG-1021, Operator Licensing
Examiner
Standards.
Any
identified operator or programmatic
weaknesses
are included in this
evaluation.
These
weaknesses
were discussed
with members of your training
staff.
A Simulation Facility Fidelity Report is included
as Enclosure
3.
During the simulator portion of the operating
examinations,
the operators
initiated
a manual
safety injection before assuring
the reactor
was shutdown.
If the reactor failed to shutdown,
an anticipated transient without scram with
inadequate
heat
removal could result.
This condition has
been
recognized to
be
a significant precursor to core melt scenarios.
You are invi'ted to respond
to this office, within 30 days after receipt of this report,
as to corrective
actions for this condition.
In accordance
with 10 CFR 2.790(a) of the Commission's
Regulations,
a copy of
this letter and the enclosures will be placed in the NRC'ublic Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
(Orgi nal signed
by T.
A . Peebles)
Thomas
A. Peebles,
Chief
Operations
Branch
Division of Reactor Safety
Enclosures:
(See
page
2)
9105'100125
910812
ADQCH, 05000400
V
Carolina
Power
and Light Company
August 12,
1991
Enclosures:
l.
Examination Report
No. 50-400/91-300
2.
Requalification
Program Evaluation Report
3.
Simulation Facility Fidelity Report
cc w/encls
1,
2 and 3:
L. H. Martin, Manager,
Nuclear
Training Section
C.
S. Hinnant, Plant Manager
Shearon
Harris Nuclear Plant
A.
W. Powell,
Manager - Training
cc w/encl
1:
State of North Carolina
bcc w/encls
1, 2,
and 3:
R. Becker,
A. Gibson,
H. Christensen,
J.
Tedrow,
Shearon
Harris
Senior Resident
Inspector
C.
Rapp,
B. Holbrook,
T. Reidinger, RIII
T. Guilfoil, Sonalyst
Operator Licensing Branch,
DLPg:NRR
Document Control
Desk
RII:DRS
CRapp:cr/btm
8/1 /91
RI
- DRS
8/0 /91
RII:DRP
HC
istensen
8/~+91
RII:
R
T ee les
8/(~/91