ML18009A729
| ML18009A729 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/31/1990 |
| From: | Hale M, Richey R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| HO-903038, NUDOCS 9011210090 | |
| Download: ML18009A729 (12) | |
Text
ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 9011210090 DOC. DATE: 90/10/31 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.
Carolina Power
& Light Co.
RICHEY,R.B.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
SUBJECT:
Monthly operating rept for Oct 1990 for Harris Nuclear Project Dept Unit 1.W/901115 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
05000400 A
RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 RGN2 EXTERNAL EG&G BRYCEiJ H
NSIC COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA IRM TECH ADV E~~I'LX 0'1 NRC PDR COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
D D
S R
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20%9) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISFS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 25 ENCL 25 D
D
Carolina Power & Light Company P. O. Box 165 ~ New Hill,N. C. 27562 R. B. RICHEY Vice President Harris Nuclear Project NOV 7
5 l990 HARRIS NUCLEAR PROJECT P. 0.
Box 165 New Hill, North Carolina 27562 File Number'SHF/10-15505 Letter Number:
HO-903038 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of October 1990.
Yours very truly, MWH:smh Enclosure R. B. Richey Vice President Harris Nuclear Project cc.'r.
S.
D. Ebneter (NRC-RII)
Mr. R.
G. Oehl (DOE)
Mr. J.
E. Tedrow (NRC-SHNPP) 9011210090 901031 PDR ADOCK 05000400 R
0 a '
I
~
'>-n'I I
DOCKET NO.:
050-400'NIT:Harris Unit 1
DATE:
October 1990 COMPLETED BY:
Mark Hale OPERATIONS
SUMMARY
Harris Unit 1 operated at a 100 percent Availability Factor for the referenced month and a 90.86 percent Capacity Factor.
There were two events.
Details are provided on the Unit Shutdowns and Power Reduction Sheet.
There are 157 fuel assemblies in the reactor vessel and 410 spent fuel assemblies in the Spent. Fuel Pools.
306 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
MEM/DATAREPa/1/OS4
II
Cf'"AL CQ
~ RIiN'DA'rL
< < r'08/90
.RUN rxHE'3:
$ 1:23 ANT f'fIFOfNANCE 1)h'I'A BYS'~
OPERA'I'XNG DATA I<EPOIXT I Ihf<RI8 UNX'r f'hl.vE RPD36-000 OPERATING STATUS DOCI(ET NO. 050-400 COIIPLETED BY MARI< M. IIALE TELEPI-IQNE (919)362-2944 I
k 3 4 L'.
7.
8.
UNI1'AHE:
HARfiIB UNIT I
HQ1ES There are 157 fuel assem-REPORTlNG PERXOD:
OCTOBLR 90 Iblies in the reactor vessel and LICENSED THERHAL f'"OMER
<HWT>: -P(5, l410 spent fuel assemblies in the NANEI I ATE RhrXNG
<GROSS
~WE>: 950*9 I Spent. Fuel Pools.
306 of the 1)ESIGN ELECTRXCAL RATING
<NET MME>:
90<'>-<'>
Ispent fuel assemblies are BWR and HAX DEI"EHDABLE CAPACITY (GROSS HMI->: 920 Iwere shipped from Brunswick.
I I'IAX DEPEHI)ABLE CAPhCXTY (NE1'ME): 860- (>
Xl'=- CHANGES OCCUR XN CAPACXTY RATINGS (ITENS 3 TI.IRU 7>
SINCE LAST REI-"ORT, GXVE f\\EABONB: N/A 10 POWL'R LEVEL TO WHXCH RESTRICTED II= AHY (HET HME): None, f<EASONB FOf< REBTfI,XCTXON XF ANY: N/A Tl-llB NONl'l.l YR ro DATF CUPFUL A1'IVE 2 A 13.
$ 4.
15 16 ~
17
$ 8.
20.
21 4 2 A 23.
25
')6 I-IOURS XN REf Of<TING PERXOD 745.00 7296.00 30697.00 NUHBEIR OF I-IOURS REACTOR, CRXTlCAL 745.00 7028.97 25026.54 REACTOR RESERVE SHUTDOWN HRS
.00
.00
.00 HouRB GENERAron QH I xHE 745.00 7031.28 24670.63 UNXT RESERVE SHUTDQWH HQuftB
.00
.0e
.ee GROSS TISERYiAL ENERGY GEN.
(UMIAK) 3892498.94 18482385
~ 98 65023864
~ 38 GROSS ELEC.
ENERGY GEH.
(NWI.I) 622961.00 6127646.00 23577908.00 HET ELFc.
ENERGY GEHERATEo
<I'IMI<> '82< 2e.eo 57265< epee 2e064678 F 00 UHIT SERVICE FACTOR
<ne.ee 96.<0 8e.37 uHxr hvhxLABILxrY I=hcTOR 100 00 96 F 10 80.37 UHlT CAP.
FACTOR
<USXNG HDC NE1'>
90.86 91.27 76.00 UNXT CAP.
FACTOR (USXNG DER NE7'>
86.82 87.21 72.
63'Hxl'ORCED Qu1'AGE RATE
.00
~.85 BHu roQWNS ScHLo.
QvER HLXT 6 MONrwB (rYPL, oA1L, AHD DURATION QF EAcH>:
Refueling Outage, March 2nd,,1991 8 weeks.
XF Sl-IUroOMH AT EHD OF REPORT
- PERXOD, ESTXHATED DATE OF START UP:
uHxTS xH rEST'TArus (I RIOR TQ CQMMLRCXAL Qrl=RATxQH>: FOREchs1 AcHxEvEo IHXTXAL CRXTXCALITY INITIAL ELECTRXCITY CQHHERCXAL OPERhTIQN MEM/DATAREPa/2/OS4
CPA L CO
~ RUg DA I I"
$ f l()8/ p (')
RI.JN 'TXHE "
1 3:
1 1: 1 9 ANT PERFORHANCE DATA SY81~
Al:P~XX r~
AVEaAI;r= DAXLY r OWr%I'LEVEL I-IAf<f<XB UNXT PAlvE Rl"-D'59-(>(>()
OCTOKcER DAY AV(i DAXLY POWER LEVLI (HWE-NET)
DOCI<ET NO.
e~e-4<>e COHPLETED KcY HAfkl< W I-IALE TI=LI-=I I<ONE (9<9)S6 -'944 DAY AVG. DAXLY POWER LEVEL
<HWE-NET) 4)2 21 876 788 794 820 26 871 857 871 862 874 869 MEM/DATAREPa/3/OS4
l ll P
C..
4 1
U 4, Ola@ t W Wd f tf l
I ~
~l
~
~
~
~
~
~
~
~
~ I
~
~
I;
~
~
I
~ ~
~
~
~
~
~ ~
~ ~
~ 4
~ '
~
'I I ~ '
~
~
~
~
~
~
~
~
~
~
I
~
~
~
~
4 I
~
~
~
~
~
~
~
~
~
P
~
1
~
~
~
~
~
~
~
~
~
~
I '.
~
~
~ ~
I
~
I ~
~
~
~
~
~
~
~
~.
J t
~
lII tt w ~ ~
. ~
~-'
d 4'
~
~
~
~
~
~
~
~ ~
~
~
I I
~
~
I ~
~
~
~
~
I ~
~ ~
~ ~
~
I' I
~
'I I
~
~ I I
~
~
~
~
~
I I
~
I
~
~
~
~
~
I
~
I
~
I I '.
~
~
~
~
~
~
~
~
~
~
~.;
~
~
I I '
~
~ ~
I III.
~
~
~
~
~
~
I