Amend 22 to License NPF-63,revising Surveillance Requirement 4.7.1.2.1.a.1 Re Monthly Testing on Staggered Test Basis of Two motor-driven Auxiliary Feedwater Pumps
ML18009A687
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/05/1990
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML18009A689 List:
References
NPF-63-A-022 NUDOCS 9010160192
Download: ML18009A687 (5)


Text

gp,8 AEQUI

~

~

0 I

~

O 0 4

+>>*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 CAROLINA POWER 8

LIGHT COMPANY et al.

DOCKET NO. 50"400 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.

22 License No.

NPF-63 1.

The Nuclear Regulatory Commission {the Commission) has found that:

A.

The application for amendment by Carolina Power 8 Light Company, (the licensee),

dated September 27, 1990, as supplemented September 28, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph

2. C.(2) of Facility Operating License No.

NPF-63 is hereby amended to read as follows:

9010160192 901005 PDR ADOCK 05000400 P

PDC

(2)

Technical. S ecifications. and-Environmental Protection Plan The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached

hereto, as revised through Amendment No.

22, are hereby incorporated into this license.

Carolina Power 5 Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days of receipt of the amendment.

FOR TME NUCLEAR REGULATORY COMMISSION Elinor G. Adensam, Director Project Directorate II-I Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

October

',"5; 1990 D

~

~

~

~

I

~

~

~

~

~

~

~ ~

~

0 NAME :PAn W

W DATE:10/

0

~

R WW

~

v: CMcCracken

~

~

10 2./90.-

10 g g~~~:

EAdensam W W

. 10/4/90

.:10/

/90.

~

0

~

~

WWWWWWW OFFICIAL RECORD COPY

Q R gp ~H E4

~ h il H

a

ATTACHMENT TO LICENSE AMENDMENT.NO. 22 FACILITY OPERATING LICENSE NO. NPF-63 DOCKET NO.

50-4OO Replace the following page of the Appendix A Technical Specifications with the enclosed page.

The revised area is indicated by marginal line.

Remove Pa e

3/4 7-4 Insert Pa e

3/4 7-4

PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE with:

a.

Two motor-driven auxiliary feedwater

pumps, each capable of being powered from separate emergency
buses, and b.

One steam turbine-driven auxiliary feedwater pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY:

MODES 1, 2, AND 3.

ACTION:

a.

With one auxiliary feedwater pump inoperable, restore the required auxiliary feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b.

With two auxiliary feedwater pumps inoperable, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

c.

With three auxiliary feedwater pumps inoperable, immediately initiate corrective action to restore at least one auxiliary feedwater pump to OPERABLE status as soon as possible.

SURVEILLANCE RE UIREMENTS 4.7.1.2.1 Each auxiliary feedwater pump shall be demonstrated OPERABLE:

a.

At least once per 31 days on a STAGGERED TEST BASIS by'.

Verifying that each motor-driven pump develops a differential pressure that (when temperature compensated to 70'F) is greater than or equal to 1558 psid at a recirculation flow of greater than or equal to 50 gpm.

2.

Verifying that the steam turbine-driven pump develops a discharge pressure of greater than or equal to 1510 psig on a recircula-tion flow of greater than or equal to 90 gpm when the second-ary steam supply pressure is greater than 210 psig.

The pro-visions of Specification 4.0.4 are not applicable for entry into MODE 3; SHEARON HARRIS UNIT 1

3/4 7-4 Amendment No.

22