ML18009A633
| ML18009A633 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/30/1990 |
| From: | Becker R Office of Nuclear Reactor Regulation |
| To: | Eury L CAROLINA POWER & LIGHT CO. |
| References | |
| TAC-77489, NUDOCS 9009050004 | |
| Download: ML18009A633 (5) | |
Text
a Docket No. 50-400 Mr. Lynn W. Eury Executive Yice President Power Supply Carolina Power 8 Light Company Post Office Box 1551
- Raleigh, North Carolina 27602 August 30, 1990
Dear Mr. Eury:
SUBJECT:
INTEGRATED LEAK RATE TESTING SCHEDULE - SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 (TAC NO. 77489)
By letter dated January 25, 1990, Carolina Power 8 Light Company (CP8L) submitted the results of the integrated leak rate tests (ILRT) performed during October 1989 at your Shearon Harris Nuclear Power Plant, Unit 1 (Harris).
Since the first ILRT did not meet the acceptance criteria for leakage, after repairs a second test was performed which successfully met the acceptance criteria.
10 CFR Part 50, Appendix J, Section III.A.6, requires you to submit your proposed testing schedule for Commission approval when one ILRT is failed.
In your January 25, 1990, letter you proposed a continuation of the normal 40 plus or minus 10 months interval.
We have reviewed your proposal to continue the normal testing schedule of 40 plus or minus 10 months interval at Harris for ILRT.
Since your first ILRT fai lure in the 1989 sequence represented no gross abnormality and was readily corrected, we find continuing the normal 40 plus or minus 10 months interval is acceptable.
Sincere ly, cc:
See next page Orignal signed by:
Steve Hoffman for:
Richard A. Becker, Project Manager Project Directorate II-1 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation
~ W
~
INAME
- PAn WO DATE
- 8/g9
-1: I: D21:
OW
&W son
- RB WW
~
90
-:8 8 90---
- Ct
- 8
~
o
]
o D
aha
- EAde sam
<<0
~
~
/90
.-:8 6 90
~
~
~
~
~
~
~
~
~
~
~
%AWK%
W W
AWI
~
~
OFFICIAL RECORD COPY Document Name:
MR.
EURY SHARRIS 9009050004 900830 Pi PDR ADOCK 05000400 poc pf oI'5
4 I
I
~
41
> v 1
I1, i,
I(
W 4
Mr. L. M. Eury Carolina Power II Light Company Shearon Harris CC:
Mr. R. E. Jones, General Counsel Carolina Power 5 Light Company P. 0.
Box 1551 Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U. S. Nuclear Regulatory Commission Route 1, Box 315B New Hill, North Carolina 27562 Mr. R.
B. Richey, Manager Harris Nuclear Project Harris Nuclear Plant P. 0.
Box 165 New Hi 11, North Carolina 27562 Mr. H. A. Cole Special Deputy Attorney General State of North Carolina P. 0.
Box 629 Raleigh, North Carolina 27602 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30323 Mr. C. S. Hinnant Plant General Manager Harris Nuclear Plant P.,O.
Box 165 New Hill, North Carolina 27562 Mr. Dayne H. Brown, Director Division of Radiation Protection N.
C. Department of Environmental, Commerce 5 Natural Resources P. 0.
Box 27687
- Raleigh, North Carolina 27611-7687
DISTRIBUTION gDocket=F-i-le NRC PDR Local PDR S. Varga 14-E-4 G. Lainas 14-H-3 E. Adensam 14-B-20 L. Reyes RII P. Anderson 14-B-20 R. Becker 14-B-20 C. McCracken OGC (For inform. Only) 15-B-18 E. Jordan MNBB-3302 ACRS (10)
P-315 Shearon Harris Plant File
k a 0 f I'g f pifp T v
\\14(()g lf I;
c
~
~
V
~ i ~
I
'h h'