0uly 31, 1990 ~
Docket No. 50-400 Mr. Lynn W. Eury Executive Vice President Power Supply Carolina Power 8 Light Company Post Office Box 1551 Raleigh, North Carolina 27602
Dear Mr. Eury:
SUBJECT:
SEISMIC DESIGN CONSIDERATION FOR CERTAIN SAFETY-RELATED VERTICAL STEEL TANKS - SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 (TAC NO. 73096)
In the process of technical resolution of Unresolved Safety Issue (USI) A-40, "Seismic Design Criteria," it was determined that a potential safety issue existed at Shearon Harris Nuclear Power Plant, Unit I (Harris), with respect to certain safety-related above-ground vertical liquid storage tanks.
In order to resolve the issue, we requested information from you on the seismic design of these tanks by letter dated June I, 1989.
You responded with the requested information by letter dated October 3, 1989.
The staff has reviewed your submittal the installation of these tanks at Harris and, on Apri 1 4-6, 1990, audited selected aspects of the seismic design calculations.
We have completed our review of the seismic design of the safety-related above-ground vertical liquid storage tanks at Harris and the results of that review are enclosed.
Briefly, the staff concludes that the design and construction of the two safety-related
- tanks, the condensate storage tank and the refueling water storage tank properly considered the effects of tank flexibilities and that the guidelines provided in Revision 2 of the Standard Review Plan, Section 3.7.3, are satisfactorily met.
Therefore, the tanks are acceptable.
This completes our efforts on TAC No. 73096.
S in cere ly, Original Signed 'By:
Richard A. Becker, Project Manager Project Directorate II-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:
w/enclosure See next page NAME
- PAn p
- RB
~
~
~
~
- EAde sam
~
~
DATE
- 7 90
- 7/2 /90
~ 7 90 OFFICIAL RECORD COPY Document Name:,
LTR EURY 73096 1
90080802l1 900731 PDR ADOCK 05000400 P
'C l
h l4 l'
h 4
Mr. L. M. Eury Carolina Power
& Light Company Shearon Harris CC:
Mr. R. E. Jones, General Counsel Carolina Power 5 Light Company P. 0.
Box 1551 Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U. S. Nuclear Regulatory Commission Route I, Box 315B New Hill, North Carolina 27562 Mr. R.
B. Richey, Manager Harris Nuclear Project Harris Nuclear Plant P. 0.
Box 165 New Hill, North Carolina 2?562 Mr. H. A. Cole Special Deputy Attorney General State of North Carolina P. 0.
Box 629 Raleigh, North Carolina 27602 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30323 Mr. C. S. Hinnant Plant General Manager Harris Nuclear Plant P. 0.
Box 165 New Hill, North Carolina 27562 Mr. Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environmental, Commerce 5 Natural Resources P. 0.
Box 27687
- Raleigh, North Carolina 27611-7687