ML18009A531

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1990 for Harris Unit 1.W/
ML18009A531
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/30/1990
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-903015-(O), NUDOCS 9005160036
Download: ML18009A531 (13)


Text

ACCELERATED D UTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS).

ACCESSION NBR:9005160036 DOC.DATE: 90/04/30 NOTARIZED:

NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.

Carolina Power 6 Light. Co.

RICHEY,R.B.

Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly operating rept for Apr 1990 for Harris Unit 1.W/

900510 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

D 05000400

/

RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB N RADIX~/'9 B10 REG FILE 01 EXTERNAL: EGGG STUART,V.A NRC PDR COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN2 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 2

2 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 27 ENCL 27 6l ""

A D

D

II~

p

~

CNtRL Carolina Power & Light Company P. O. Box 565

~ New Nilf, N. C. 27562 R. 8. RICHEY Manager Harrta Nuclear Project MAY j 0 1990 File Number.'HF/10-15505 Letter Number.'O-903015 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO ~

1 DOCKET NO. 50-400 LICENSE NO ~ NPF-63 MONTHLY OPERATIONS REPORT Dear Sirs.

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of April 1990.

Yours'ery truly, MWH:kdl Enclosure R. B. Richey Manager Harris Nuclear Project cc:

Messrs.

S.

D. Ebneter (NRC-RII)

R.

G. Oehl (DOE)

J.

E. Tedrow (NRC-SHNPP)

I 9005160036 9'00430 PDR ADOCK 05000400 R

PDC MEM/DATAREPa/1/OS4

1 ~

~

k.>*J l

United States Nuclear Regulatory Commission Page 2

~,bcc o Mr. H.

Mr. T.

Mr. T.

Mr. R.

Mr. C.

Mr. R.

Mr. C.

Mr. A.

Mr. G.

Mr. F.

Mr. J.

Mr. M.

Mr. Je Mr. M.

Mr. Wi Mr. C.

Mr. D.

Mr. L.

.Ms. R.

Mr..J.

, Mr.. D.

Mr. J.

Mr. E.

R.

Banks A. Baxter (Shaw,

Pittman, Pot C. Bell K. Buckles (LIS)

Carmichael (2)

M. Coats (2)

W. Crawford B. Cutter/EJW/SM L. Forehand I. Frazier F. Garibaldi (Ebasco)

R. Graybeal G.

Hammond D. Hill J.

Hindman, Jr.

S. Hinnant E. Hollar H. Martin Morgan F. Nevill L. Tibbitts Whiteman E. Willett ts, 6 Trowbridge)

Day File Document Services File.'HI/A-2D SHNPP Reg.

Compliance (HX-0941)

INPO MEM/DATAREPa/2/OS4

DOCKET NO 050-400 UNIT:

Harris Unit 1

DATE:

April 1990 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1

operated at a 100.00 percent Availability Factor for the referenced month and a 92.54 percent Capacity Factor.

There was one continued and two additional load reductions.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 230 spent fuel assemblies in Spent Fuel Pool B.

126 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.

MEM/DATAREPa/1/OS4

.CPhL.CO IDUN DATE 85/68198 RUH TXHE 08:07:44 t PLANT PEF<FORHANCE DA1A S.

EH Ol"ERATXHG DATA REPORT HARRXS UNIT 1

PAGE 1

I<PD36-888 OF ERA1XNG <<"iA1US Doci<r=-r No. e5e-46e COHF'LE'I'ED BY HARI< M.

I-IALE TEI Er-HONE

<919)s62-944 UHX1'AHE:

HARRIS UNlT 2.

Ikl:.POINTING PERlQD:

APRXL 98 3.

LXCENSED Tl-IERHAI POMER (HWT): 2775 4.

HAHEI LATE RATING (GROSS HME>: '958 '

5.

DESIGN ELEC'!'RICAL RATlHG (NFT HME): 988.8 6.

HAX DEPEHDAI)LL CAPAC1TY (GROSS HWI:-): 920. 6 7.

HAX DEF'ENDABLE CAPACITY (HET HME): 860.0 8.

IF CIIAHGES OCCUR XN CAPAC1TY RATINGS

( 1TLHB GIVE REASONS:

N/A NQTES There are 157 fuel I

Iassemblies in the reactor, 230 Ispent fuel assemblies in Spent IFuel Pool B, 126 of the spent fuel(

Iassemblies are BWR and were shipped)

Ifrom Brunswick.

I TI.IRLJ 7 >

SINCE LAST RI=PORT, 9.

I OWER LEVLI To WHlCH RESTRXCTED ll= AHY (NET HME): None.

1e.

REASONS FoR REsTRxc1-IOH XF AHY: N/A Tll1s HQN1'll YR TO DA1'E CUHUL ATIVE I-IGURB IH REPORTING PERXQD 1".

HUHBER Ol-" HOURS REACTOR CRlT1CAI 1S.

REACTOR RESERVL=

Si-iu1DOMH HRS 14.

I-IOURB GEHI=RATOR OH LINL 15.

UNXT RESERVE Sl-IUTDGWN HOURS 16.

GROSS THERHAI ENERGY GEN.

(HWH>

17.

GROSS I LEC.

r:HERGY GEN.

<HWil>

18.

NET LII-.C. ENERGY GEHI=RATED (HMH>

19.

LJHXT SERVXCI FACTOR 20*

UHXT AVAlLABllXTY I=ACTOR 21.

UHXT CAF.

FACTUR

<UBXNG HDC NET) 22.

UNXT CAP.

FACTOR (USXNG DLR HET) 23.

UNl'I'ORCED OUTAGE RATE 24.

Bl-IUTDOMHS SCHED.

OVER NEXT 6 HOHTHS 719.00 719.68

'00 719.00

.00 1845299.52 612078.00 572237.88 188. <)0 108*80 92.54 88.43

.08 (TYPE,

DATE, 2879.80 2879.00

.06 2879.60

.88 7459546.32 2589575.08 2347521.68 180.88 100.00 94.81 90.68

.08 AND DURATION 26280.86 20876.57

.88 28538.35

.88 54001224.72 179598z7.<)e 16685689.80 78.15 78.15 78.83 78.55 4.29 Ol= LACI.I):

25.

IF Sl-IUTDGMH AT END QF REF'ORT

FERXGD, EBTXHATED DATE QF START UP:

26.

UNXTB 1N Tl:-'BT STATUS

( I R XOR TO COHHERCIAL QPERAT XQN ):

I=ORI=CAST ACHXEVL'D XHXTXAL CRXTXCALITY INlTIAL ELECTRlCITY COHHERCXAL OPERA1XOH 1.16 MEM/DATAREPa/2/OS4

.CP4d CO.PLAHT PEIEI=OIEHANCE DATA O'H RUiA DATE 05/08/98 APPENDXX 8 AVERAGE DAILY POWER LEVEL RUN TINE 08:07:4'I IHAIRI<XS UNIT I"AGE RPD39" 008 APRXL DAY AVG. DA1LY I OWER LEVEL

<MWE-NET) 277 DOCI<ET HO. 050-408 CONPLETED K<Y MARI< M. IIALE rCLEII-IONE <9<9>v~2..9<4 DAY AVG. DA1LY POWER LLVEL

<HWE-HET) 7 872 20

~') NP 849 830 I')7 28 842 870 870 869 MEM/DATAREPa/3/OS4

h/

11 1

%1 ~

1

~

5 M%

Qhh kg

I ~

~

I I

I ~

I I

~

~

~

~

I

~

~ I

~ ~

I

~

~

~ ~

~

~

~

~

I ~

~ 0

~ ~

~

~

~

~

<< I I I '

I I I

~ 0

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~ ~

~

~

~

~

~ ~

~

~

~

<< ~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~ <<

~

~

~

~

~

~

~

~

~

~

I I

~,

~

I

~-;

~

~

~

~

<< ~

I

~

I

~ <<-

~

UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:

APRIL 1990 DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

050-400 Harris 5/4/90 H. W. Hale (919) 362-2944 Date y

p e

Duration (Hours)

R Method of Shutting Down Reactor Licensee Event Report /f System Code 4

Component Code 5

Cause 4 Corrective Action to Prevent Recurrence 90-005 900410 0,0 N/A Load reduced to 505 to perform maintenance on Hain Feedwater Pump Motor "lA." The inboard motor bearings were replaced on HFW Pump "1A."

The motor was realigned to the pump.

Additional vibration instrumentation was installed to monitor the repair.

The maintenance activities were completed and'unit was returned to full load.

I F:

Forced S:

Scheduled Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training 6 License Examination F-Administrative G-Operational Error (Explain}

H-Other (Explain)

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG&161) 5 Exhibit 1 Same Source HEM/DATAREPa/5/OS4

I ~

~

I I

I ~

I I

II

~ I

~

~

~

~

~

I

~ ~

~

~

I;

~

~

~ ~

~

~

I ~

~,

~

I I

~

I '.

~

I

~

~

~

~

~

~

~ ~

~

~

~

~

I

~

~

~

~

~

~

~ ~

~

~ '

~

~

~

~

~

~

~

~

~

~

I

~

~

~

~

~

~

~

~ It

~

~

~

I ~

I '.

~

~

~

lt-

~

~

~

~

I

~