Monthly Operating Rept for Jan 1990 for Harris Nuclear Power Plant Unit 1
ML18009A384
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/31/1990
From: Hale M, Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HO-903006-(O), NUDOCS 9002220392
Download: ML18009A384 (12)


Text

ACCELERATED D UTION DEMONS I

TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

FACIL:50-400.Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.

Carolina Power

& Light Co.

RICHEY,R.B.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly operating 1990 for Harris Nuclear Power Plant Unit

.W/900213 r.

DISTRIBUTION CODE:

IE24D COP CEIVED:LTR ENCL SIZE:

TITLE:,Monthly Operating Report (per Tech Spec NOTES:Application for 'permit renewal filed.

05000400 RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 NRR DRE PBll RE FILE EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 3

3 1

1 10 10 1

1 1

1" 1

1 1

1 1

1 1

1 T

RECIPIENT ID CODE/NAME

'PD2-1 PD AEOD/D0A IRM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN2

=

LPDR, NSIC COPIES LTTR ENCL 1

'1.

1 1

2 2

1 1

1 1

1 1

1 1

1 1'OTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASIKlCONTACT THE.DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:

LTTR=.

29 ENCL

.29

l ass 0

~ 4 P

l~/

Carolina Power & Ught Company P. O. 8ox 165 ~ New Hill, N. C. 27562 R. 8. RICHEY Manager Harris Nuclear Project fFEB

) 3 890 File Number'SHF/10-15505 Letter Number'HO-903006 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO+ NPF-63 MONTHLY OPERATIONS REPORT Dear Sirs'.

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of January 1990.

Yours very truly, R. B. Richey Manager Harris Nuclear Project MWH:kdl Enclosure cc:

Messrs.

S D. Ebneter (NRC-RII)

R.

G. Oehl (DOE)

J.

E. Tedrow (NRC-SHNPP)

F00'222035'2 95000400 PDR ADOCK 0 R

MEM/DATAREPa/1/OS4

4 A

'r

~. ~,

s a

sg

'v

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

January 1990 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 100.00 percent Availability Factor for the month of January with a

97.42 percent Capacity Factor.

There was one continued event and one load reduction.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 194 spent fuel assemblies in Spent Fuel Pool B.

90 of the spent fuel assemblies are BWR and were shipped to Harris from CPGL's Brunswick Plant MEM/DATAREPa/1/OS4

J

~,

p I

C';

~ 'CI b I ~ CO I LANT PERrORHANCE DATA 8 EH RUN DATE 82/86/98 AI-PENDIX B AVERAGE DAILY P(3wER LEVEL

.RUN TIHE 1 4: 89:

3 5 HAITI<I8 UNIT PAGE RPD39-888 JANUARY DAY AVG.

DA3:I.Y I"(3MER LEVEI

( HMI:-..--NET)

DOCI<ET NO. 858-488 C(3HPLETED BY HARI< M.

I-IALF TEI EPI<ONE (919)362-2944 DAY AVG. DAILY POMER LEVEL

<HME-NET) 877 878 2()

22 879 888 18 876 870

".)7 872 888 891 889 887 878 h.kb 8

HEN/DATAREPa/3/OS4

, CPA I CO PL.ANT PERFQRHANCF DATA.~TEH HUH DA>i.-

02resr90 orEr4viwr. DAiA REronM RUN TIHE'4: 09: 17 I-IARRlS UNIT PAGE Rl D36-eee OPERATING TAt UB Doc(<ET Ho. 050-488 CGHPLE'1'ED BY HARI< M.

I.IALI=

TELEPIIGNE (919)362-2944 LIHXT NAHE'-IARR IS UNIT 1

2.

RI=PORT1NG PERIOD:

JANUARY 98 3.

LICENSED TI.-IERHAL POWER (HMT): 2775 4.

NAHEPLATE RATlNG (GROSS HME): 958.9 5.

DE:XGN I..-:.LECIRICAI RAtlH(.,

<NET HME): 98e.e 6*

HAX DEPEHDADLI'-" CAPACXTY (GROSS HWE); 920.0 7.

HAX DEPENDABLE CAPACITY (NET HME): 860.8 8.

XF'HANGES OCCUR 1H CAPACITY RATINGS (ITEHS GIVE REASONS:

g/A I

NOTES There are 157 fuel lassemblies in the reactor, 194 Ispent fuel assemblies in Spent IFuel Pool B, 90 of the, spent lfuel assemblies are BWR and were Ishipped from Brunswick.

3 Till'3.

UNIT FOR(".ED OUTAGE RATE 24.

SHUTDOWNS BCIHED.

OVER HEXT 6 HOHTI-IB 744.08 744.ee

.80 744.08

.08 1959332.04 665917.88 623305.08

'l88.80 1ee.ee 97.42 93.89

.08 (TYPE, DATL",

744.ee 744.80

.80 744.88

.ee 1959332.84 665917.88 623305.88 100.88 180.08 97.42 93*09

  • 88 AHD DURAT1 OH 24145.ee 18741.57

.80 18403.35

.08 48581010.44 16116179.08 14961473.00 76.22 72.05 68.85 4.76 0)= LACH):

25.

XF BIIUTDGMH AT EHD QF RFI-ORT FERIOD, E<<"TIHATED DATE OF START UP:

6.

UNITS 1H TEST STATUS (PRIOR TO CQHHERCIAL OPERATION ):

I-"'ORECAST ACIIXEVED IN1TIAL CRXTXCALITY 1HITIAL ELECTR 1 CITY COHHERCIAL OPFRATXOH MEM/DATAREPa/2/OS4

~ ~

I

~

~

I I

I ~ 8 I

I

~ II

~

~

~

I

~ ~

I

~

~

~ ~

~

~

~

~

I ~

I ~

~

~

~ I

~

~

~

I

~

I

~

~

~

~

~

~

~

~

~

~

~

4 I

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~ '

~

~

~

~

~

~

~

~

~

~

~

~

~

~

I

~ ~

I

~

~

I s.

~

~

~

~

~

~

I

~ ~

~

J

~

~

I

'I 4

I ~

~

I

~

I ~

I I 'l

~ I

~

~

~

I

~ ~ ~

~

~

I

~

~ ~

~

~

~

~

I ~

~ ~

~.

~

~

~

I '.

~

~

~

~

~

~

~

~ ~

~ 1

~

~

~

~

I

~

~

~

~

~

~

~

I

~

~

~

~

~

~

I

~ ~

~

~

~

I ~

~

~

~

~ ~

~

~

~

I

~

4I

~