ML18009A355

From kanterella
Jump to navigation Jump to search
Forwards Reactor Containment Bldg Integrated Leak Rate Test Conducted in Oct 1989.Util Believes That Packing Leaks Discovered Are Isolated Failures & That Repair Should Prevent Recurrence
Date released: 08/31/2018 Download: ML18009A355


Reactor Containment Bldg Integrated Leak Rate Test.
ML18009A356
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/1989
From:
CAROLINA POWER & LIGHT CO.
To:
References
Download: ML18009A356 (132)
Forwards Reactor Containment Bldg Integrated Leak Rate Test Conducted in Oct 1989.Util Believes That Packing Leaks Discovered Are Isolated Failures & That Repair Should Prevent Recurrence
ML18009A353
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/25/1990
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18009A353 (5)