ML18009A344
| ML18009A344 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 01/09/1990 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Eury L CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18009A345 | List: |
| References | |
| NUDOCS 9002010252 | |
| Download: ML18009A344 (3) | |
Text
January 9,,1990 Carolina Power and Light Company ATTN:
Mr. Lynn W. Eury Executive Vice President Power Supply P. 0.
Box 1551
- Raleigh, NC 27602 Gentlemen:
SUBJECT:
SHEARON HARRIS REQUALIFICATION EXAMINATION REPORT 400/OL-89-02 The NRC administered examinations during the weeks of October 3 and October 9, 1989, to employees of your company who currently hold licenses to operate the Shearon Harris Nuclear Power Plant.
At the conclusion of the site visit, preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure l.
A table summarizing the examination results for each examined individual is provided in Enclosure 2.
Copies of the written examinations and answer keys are included in this report as Enclosure 3.
requalification program evaluation report is included as Enclosure 4.
This evaluation report finds that the Shearon Harris requalification program remains satisfactory.
Your attention is invited to information in the examination and evaluation reports which describe our concerns over operator performance and exam administration.
A Simulator Fidelity Report is provided in this report as Enclosure 5.
In accordance with 10 CFR 2.790(a),
a copy of this letter and Enclosures I, 3, 4,
and 5 will be placed in the NRC's Public Document Room.
Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.
Should you have any question concerning this letter, please contact us.
Sincerely, (Original signed by T. A. Peebles)
Thomas A. Peebles, Chief Operations Branch Division of Reactor Safety
Enclosures:
(See page 2) 90020i0252 900109 PI3R ADGCK 05000400 Y
Carolina Power and Light Company
, January 9,. 1990
Enclosures:
l.
Examination Report No. 50-400/OL-89-02 2.
Requalification Results Summary Sheet (Official Use Only - Privacy Act Information) 3.
RO/SRO Written Examinations and Answer Keys 4.
Requalification Program Evaluation 5.
Simulation Facility,Fidelity Report cc w/encls 1, 2, 4, and 5:
L. H. Martin, Manager-Nuclear Training Section C. S. Hinnant, Plant General Manager cc w/encls 1, 2, 3, 4, and 5:
A. W. Powell, Training Manager cc w/encl 1:
State of North Carolina bcc w/encls 1, 4, and 5:
R. Becker, NRR H. Dance, DRP J. Tedrow, Senior Resident Inspector B. Holbrook, DRS J. Arildsen, DRS T. Guilfoil, Sonalyst bcc w/encls 1, 3, 4 and 5:
Document Control Desk bcc w/encls 1, 4, and 5:
Operator Licensing Branch, NRR RII
~j RII C<
JArildesen CCasto 1/ $/90 I///90 RI I HDance 1/ 0/90 RI I T
eebles I/
/90