Retyped Tech Spec Table 3.3-3 Re Auxiliary Feedwater Manual Initiation
ML18009A320
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/15/1989
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18009A319 List:
References
NUDOCS 9001030131
Download: ML18009A320 (3)


Text

ENCLOSURE I SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 RETYPED TECHNICAL SPECIFICATION PAGES AUXILIARYFEEDWATER HANUAL INITIATION

~DR ggo~>

891 pg gg 9poippp~

~< 05pppgpp Pgu

)

TABLE 3.3-3 (Continued)

ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION FUNCTIONAL UNIT TOTAL NO.

CHANNELS OF CHANNELS TO TRIP MINIMUM CHANNELS OPERABLE APPLICABLE MODES ACTION 6.

Auxiliary Feedwater a.

Manual Initiation, 1)

Motor-Driven Pumps 2)

Turbine-Driven Pumps 1/pump 2/pump 1/pump 1/pump 1/pump 2/pump 1,2,3 23 23 b.

Aut orna tic Actu at ion Logic and Actuation Relays 1,2,3 21 C ~

Steam Generator Water LevelLow-Low 1)

Start Motor-Driven Pumps 3/stm.

gen.

2/stm.

gen.

2/stm.

gen.

in any in each stm. gen.

stm. gen.

1,2,3 15 2)

Start Turbine-Driven Pump 3/stm. gen.

2/stm. gen.

2/stm.

gen.

in any in each 2 stm. gen.

stm. gen.

1,2,3 15" d.

Safety Injection Star t Motor-Driven Pumps See Item l. above for all Safety Injection initiating functions and requirements.

e.

Loss-of-Offsite Power Start Motor-Driven Pumps and Turbine-Driven Pump See Item 9. below for Loss of Offsite Power initiating functions and requirements.

Trip of All Main Feedwater Pumps Start Motor-Driven Pumps 1/pump 1/pump 1/pump 1,

2 15"

TABLE 3.3-3 (Continued)

ACTION STATEMENTS (Continued)

ACTION 19 With the number of OPERABLE channels one less than the Total Number of Channels, STARTUP and/or POWER OPERATION may proceed provided the following conditions are satisfied:

a.

The inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and b.

The Minimum Channels OPERABLE requirement is met; however, one additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing of other channels per Specification 4.3.2.1.

ACTION 20 With less than the Minimum Number of Channels OPERABLE, within 1

hour determine by observation of the associated permissive annunciator window(s) that the interlock is in its required state for the existing plant condition, or apply Specification 3.0.3.

ACTION 21 With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />;

however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.

ACTION 22 With the number of OPERABLE channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in at least HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

ACTION 23 With the number of OPERABLE channels less than the Total Number of

Channels, declare the associated equipment inoperable and take the appropriate ACTION required in accordance with the specific equipment specification.

ACTION 24 With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />;

however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2.1 provided the other channel is OPERABLE.

ACTION 25 During CORE ALTERATIONS or movement of irradiated fuel within containment, comply with the ACTION statement of Specification 3.9.9 SHEARON HARRIS UNIT 1

3/4 3-27 Amendment No.