ACCELERATED DISTRIBUTION DEMONFGMTION SYSI'HM e:
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8912200381 DOC.DATE:
1 3
NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.
Carolina Power
& Light Co.
RICHEY,R.B.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400 R
SUBJECT:
Monthly operati for Nov 1989 for Harris Nuclear Power Plant, Unit 1
/891213 r.
DISTRIBUTION CODE:
IE24D PIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs D'OTES:Application for permit renewal filed.
05000400
/
RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 NRR/DRE
~RED. 1 R ~~
EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME
.PD2-1 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 D
D R
I D
~
S NOTE TO ALL"RIDS" RECIPIENTS:
A D
D PLEASE HELP US TO REDUCE WAS'! CONTACT THE,DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:
LTTR 29 ENCL 29
p+w,r S>>*
. ~
qi
~ ~
~
+
A a
~
~
~
~
~
I e't
'I "f
h
>1>',
~ I, '
l~
~ I
Carolina Power & Light Company P. O. Box 165 ~ New Hill, N. C. 27562 R. B. RICHEY Manager Hanls Nuctear Project DEC1 3
1889 File Number.'SHF/10-15505 Letter Number:
H0-893067 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO ~
1 DOCKET NO. 50"400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of November 1989.
Yours very truly, MWH:dj Enclosure R. B. Richey Manager Harris Nuclear Project cc:
Messrs.
S. D. Ebneter (NRC-RII)
R.
G. Oehl (DOE)
J.
E. Tedrow (NRC-SHNPP)
S9i22003Si S91130
- P13R ADOCK.05000400 R
PDC MEM/DATAREPa/1/OS4 Z(
t 4
A
( ~
h +.
I'
~
tl l,l 8
.'I
~
Ul
~
~
0 P
k 1
h I ~
~
~
l ~
0 DOCKET NO ~ :
050-400, UNIT:
Harris Unit 1
DATE:
November 1989 COMPLETED BY:
Mark Hale OPERATIONS
SUMMARY
Har'ris Unit 1 operated at a 0.00 percent Availability Factor for the month of November with a
0.00 percent capacity factor.
There was one refueling outage.
Details are provided on the Unit Shutdowns and Power Reduction Sheet.
There are 157 fuel assemblies in the reactor vessel and 176 spent fuel assemblies in Spent Fuel Pool B.
72 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
One cask of 18 assemblies from Brunswick remains in the Fuel Handling area for off-loading and storage.
MEM/DATAREPa/1/OS4
~
~
1 4
r i
I 0
/y
~ '
~ ~
CF'hL CQ RUN DA'1'E RUN TIME 12/e4/89
'I 27: 33: 83 F'LANT F'ERFGRHAHCE DATA SYBTEH Gl'ERATIHG DATA REPORT IIARRIS UNIT F'AGE l(PD.)6-88~
OPEI<ATIHG STA1US DGCI(E1'G. 050-488 COMF'LETED BY HARV. M.
I.IALE rEL.t P;IGNE 1.
I')
h
- 3.
4 ~
6.
7 h 8.
UNIT NAME:
I.IARRIB UNIT REPORT IHG PERIOD:
HGVEHK(EIC 89 LICENSED THERMAL PQWER (MWT): 2775 NAHEI"LATE RATING
( GROSS HME): 958. 9 DESIGN ELECTRICAL,RATING (NET HME): 908.8 HAX DEPENDABLE CAI='AC1TY (GROSS HME): 920.0 HAX DEPENDAK<L.E CAF'ACITY (HET HME): 860. 8 1F Cl IAHGES
= OCCUR IH CAPACITY RATINGS (1TEHS GXVE REASONS:
N/A NG1ES There are 157 assemblies inl Ithe reactor,,,176 spent fuel Iassemblies in'pent Fuel Pool B, 172 of the spent assemblies are BWR I
land were shipped from Brunswick.
I I
3 TIHILU 7)
SIHCL=.
L.AST REPORT, 18.
POWER LEVEL To MI)XCH RESTR1CTED IF AHY (NET MME): None REASONS FGR RESTRICTIGH XF ANY:
N/A Tl-I IS MOHTI.I YR To DATE CUHUL ATIVE 2 h
'13.
$ 4.
15.
16.
$ 7.
18.
I 9.
P) 0 2 1
- h h
h 2'3.
24 h I.IGURB IH REF'ORTIHG PERIOD NUMBER OF I-IGURS RLACTGR CRITICAL REACTOR RESERVE Bl IU1'DOWH I-IRB I IGURS GENERATOR ON LI NI-'NlT RES)ERVE S)l-IUTDOMH HOURS GROSS Tl-IERHAI EHI 'RGY GEH.
( HMI.I)
GROSS ELEC.
ENERGY GEH.
(MWFI)
Hl'=T ELEC.
ENLRGY GEHERATED (HMH>
LlHIT S)ERV ICE FACTOR UNIT AVAILABIIITY FACTOR UNIT CAP.
FACTOR (USIHG HDC NET)
LINIT CAP.
FACTOR (USING DER NET >
UNIT FORCED GUTAGF RATE sHurDGWNs scl<ED.
OVER HLXT 6 MGN1lls 720.88
.00
.88
.08
.88
.ee
.08
-6994.ee
.08
.88
- 1 3
-3.08
.88 (TYPE,
- DATE, 8816.88 6684.35
.88 6645.8e
.88 37961647
~ 04 5944280*08 554868$.88 82.91 82.91 88.49 76.'91 1.91 AHD DURAT1OH 22657.08 37719.35
.88 17438.83
.ee 46218318.30 35344787.88 34254917.88 76*93 76.93
, 73.36 69.91 5.81 OF EACH):
2b h XF Sl-IUTDQMH AT EHD Ol= REF'QRT I='ERXQD, ESTXHA1'ED DATE GF START UP:
1 /13/89 UNITs IN 1Esr s1ATUs
<PliIon To CGMHLncIAL'OI'ElcATIOH): FOREcAsT ACIIIEvED IHITIAL CRITICALITY 1NITIAL ELI'=CTI<IC1TY C(3HHERCIAL OF'ERATIOH 51&f/DATAREPa/2/OS4
l
V 1
CP6L CO Pl ANT PERI=ORHANCE DATA SYSTEH RUN DATE
<2)eore9 APPEND>X B AVERAGE DA>LY POWER LEVEL RUN TlHI='
2: 32: 59 HARRIS UNIT PAGE RPD39-000 NOVEHBER DAY AVG.
DALI Y I OWER LEVI=I (HME-NET)
DQCI<ET NO. 050-408 CQHPLETED BY HARI<
W.
HALE TELEPHONL='939)362-2944 DAY AVG. DAILY POWER LEVEL (HME-NET) 22 12
.>7
-18
-30 12 3.$ 6 8
MEM/DATAREPa/3/OS4
~ ~
l.
C'j 4f 9
~
~
~
~
I
~
~
I ~
~
~
I ~
~ ~
I I ~
L ~
~
~
~
~
~
~
~
~
~
'