UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Enclosure 1
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATIOI'I SHEARON HARRIS NUCI.EAR POWER PLANT CAROLINA POWER 8 LIGHT COMPANY et al.
DOCKET NO. 50>>400 GENERIC LETTEP, 83-28 ITEM 2.2.1 E UIPMENT CLASS TF ICATION PROGRAM FOR ALL SAFETY-RELATED COMPONENTS
- 1. 0 INTRODUCTION Ceneric Letter 83-28 was issued by the NRC on July 8, 1983 to indicate actions to be taken by licensees and applicants based on the generic implications of the Salem ATWS events.
Item 2.2.1 of that letter states that licensees and applicants shall describe in considerable detail their program for classifying all safety-related components other than RTS coIrponents as safety-related on plant documents and in information handling systems that are used to control plant activities that may affect these components.
Specifically, the licensee/applicant's submittal was required to contain information describing (1) the criteria used to identify these components as safety-related; (2) the information handling system which identifies the components as safety-related; (3) the manner in which station personrIel use this information handling system to control activities affecting these components; (4) management controls that are used to verify that the information hand ling system is prepared, maintained, validated, and used in accordance with approved procedures; and (5) design verification and qualification testino requireIIIents that are part of the specifications for procurement of safety-related components.
The licensee for Shearon Harris submitted responses to Generic Letter 83-28, Item 2.2.1 in submittals dated November 7,
- 1983, May 31, 1985 and August 24, 1989.
We have evaluated these responses and find them to be acceptable.
2.0 DISCUSSION AM) EVALUATION The 1icensee provided submittals that describe programs to assure that all components necessary for accomplishing the required safety-related functions are properly designated on plant documents, procedures, and in the information handling system that are used to control plant activities that may affect these components.
A description of the criteria used for classifying components and equipment as safety-related and a description of the preparation, maintenance, control and use of the information handling system which contains the classification information were also provided.
In addition, management 89120703b9 89ii30 PDR ADQCN, 05000400 P
PNU
~
~
I ~
~
~
I
~
controls used by the licensee assure that the information handling system will be consistent, adequately prepared and maintained, and will be used as intended.
furthermore, the licensee assures that appropriate design verification and qualification is specified for the procurement of safety-related components and parts.
Detailed evaluation of this item is documented in the enclosed contractor's (Idaho National Engineering Laboratory) technical evaluation report (EGG-NTA-7360).
- 3. 0 CON CLUS ION We have reviewed the licensee's responses to Generic Letter 83-28 Item 2.2.1 regarding the equipment classification program for safety-related components and conclude that they are acceptable.
Dated:
November 30, 1989
- Mr.. L. W. Eury Carolina Power 8 Light Company Shearon Harris CC:
Mr.
R.
E. Jones, General Counsel Carolina Power 5 Light Company P.
0.
Box 1551
- Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U. S. Nuclear Regulatory Commission Route I, Box 315B New Hi11, North Carolina 27562 Mr. R.
B. Richey, Manager Harris Nuclear Project Harris Nuclear Plant P.
0.
Box 165 New Hill, North Carolina 27562 Mr. H.
A. Cole Special Deputy Attorney General State of North Carolina P.
0.
Box 629
- Raleigh, North Carolina 27602 Regional Administrator, Region II U.S.
Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgi a 30323 Mr. C.
S. Hinnant Plant General Manager Harris Nuclear Plant P. 0.
Box 165 New Hill, North Carolina 27562 Mr. Dayne H. Brown, Chief Radiation Protection Section Division of Facility Services N.
C. Department of Human Resources 701 Harbour Drive
- Raleigh, North Carolina 27603-2008