ML18005B152
| ML18005B152 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/31/1989 |
| From: | Hale M, Richey R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| HO-893064-(O), NUDOCS 8911290351 | |
| Download: ML18005B152 (10) | |
Text
gCCP~RATZD DI,.
UTION DEMONSTRA.
N SYSTEM REGULATORY FORMATION DISTRIBUTION S M (RIDS) g1 ACCEkgION NBR:8911290351 DOC.DATE: 89/10/31 NOTARIZED: NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION HALEPM.
Carolina Power 6 Light Co.
RICHEY,R.B.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operatin r
or Oct 1989 for Harris Nuclear Power Plant, Unit l. /891115 1 r.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR J ENCL g SIZE: 6 TITLE: Monthly Operating R'eport (per Tech Specs)
NOTES:Application for permit renewal filed.
05000400 S
RECIPIENT
'ID CODE/NAME PD2-1 LA BECKER,D INTERNAL:
ACRS'EOD/DSP/TPAB NRR/DLPQ/PEB 10 NRR DRE RPB 10 EG FIL Ol EXTERNAL: EGSG SIMPSON,F NRC PDR COPIES LTTR ENCL 3
3 l
1 10 10 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 I
D S
1'OTAL NUMBER OF COPIES REQUIRED:
LTTR 29 ENCL 29
E I
1i fi'I
,t
CÃQE Carolina Power 8 Light Company HARRIS NUCLEAR PROJECT P. 0.
Box 165 New Hill, North Carolina 27562 XOVl. S 1S89 File Number'SHF/10-15505 Letter Number'.
HO-893064 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT Dear Sirs'.
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power
& Light Company herewith submits the report of operation statistics and shutdown experience for the month of October 1989.
Yours very truly, MWH:kdl Enclosure R. B. Richey Manager Harris Nuclear Project cc.'Messrs.
S.
D. Ebneter (NRC-RII)
R.
G. Oehl (DOE)
J.
E. Tedrow (NRC-SHNPP) 891 f290351 89103>
PDR ADOCK 05000400
'Nu MEM/DATAREPa/1/OS4
/pe
DOCKET NO.:
050-400 UNIT:
Harris Unit 1
DATE:
October 1989 COMPLETED BY:
Mark Hale OPERATIONS
SUMMARY
Harris Unit 1 operated at a 28.88 percent Availability Factor for the month of October with a 27.93 percent capacity factor.
There was one reactor trip and one refueling outage.
Details are provided on the Unit Shutdowns and Power Reduction Sheet.
There are 157 fuel assemblies in the reactor vessel and 124 spent fuel assemblies in Spent Fuel Pool B.
72 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
There are also 52 new PWR assemblies in Spent Fuel Pool B for Fuel Cycle 3 and' assemblies in the new fuel pool.
One cask of 18 assemblies from Brunswick remains in the Fuel Handling area for off loading and storage.
MEM/DATAREPa/1/OS4
't 1
~o,~
Fk'llg
CPiNL CQ
- , -'i;GH DAIr
<<Z87r'8>>'ui')
vxMr.'e:46:40 PI.AHT PERF{3RMANCE 1)ATA BY~EM QI-El;ArING DATA REI'QR>~
IIARRXB LINII
'I rAG I~l'D34--88(
OPERATING STATUS Docl<ET No. e58-4ee CQMELETED K<Y MARI< W.
I-IALE rELEr-I-IoNE r) a' A
5 J
'6.
7.
8.
uHxr NAME:
HARRxs uHIr 1
HEI."ORTIHG PERIOD:
OCTOBER 89 I XCENBED TIIERMAL POWER
<MMT): 2775 NAMEPLATE RATXNG
<GROSS MME): 958.9 DEsxGN ELEcrRxcAL RATING <NEr MWE>: 9ee.o MAX DEI EHDABLE CAI'"ACITY (GROSS MME): 9 0.0 MAX IErEHDAr<LE CAFAcJTY
<HE>
MWE): 86e.e XF CHAHGES OCCUR XN CAI-"AC1TY RATINGS.(1TEMS GIVE REABOHS:
8/A NOTES There are 157 assemblies lin the reactor:124 spent fuel I
Iassemblies in spent Fuel Pool B, I'72 of the spent assemblies are BWR and were shipped from Brunswick.
ere are 52 n'w PNR assemblies in ISpent Fuel Pool B for Fuel Cycle 3.
I THRU 7)
SINCE LAST REPORT, 10.
I"OWER LEVLL To WHICH RESTRICTED II'= ANY (Hl""T MWE>:
None REASONS FOR RESTRXCTJON IF AHY:
N/A THIS M<3NTH YR TO DATE CUMLIL ATIVE 11
~
2 13 ~
14.
15 16.
17
'8.
.)8 k
1
- h A
- 23.
I-IOIJRS IN REPORT IHG PERIOD NLIMBEIR Ol" I-IOURB Rl:..ACTOR CRXT ICAL REAcTQR REsERvE BI-IUTDowH HRs HOURS GENERATOR ON LIHF UHIT RESERVE Sl-IUTDQWH I-IOURB GROSS THERMAI
- ENERGY GEH*
(MwlI >
GROS)s E:LEC.. ENERGY GE:N.
( MWI-I)
NET El EC.
ENERGY GENERATED (MMH)
UNIT SERVICE FACTOR UNXT AVAILABILITYFACTOR UNIT CAP.
FACTOR (USING MDC NET)
UNl'I cAP.
I-AcroR (usING DER NEI>
UHlT FORCED OUTAGE RATE SI.IUTDOMNS BCHED.
OVER NEXT 6 MOHTI-ls 745.80 215.15
.88 215.15
.00 596356.38 19'))2)46*88 178967.00 28.88 28.88 27.93 26.69 4.16 (TYPE,
- DATE, 7296.80 6684.35
.80 6645.88
.80 17961647.04 5944288.88 5555595.00 91.89 91.09 88.54 84.61 ANX) DURATIOH 21937.88
'7719.35
.80 17438.83
.80 46218318.18 15'344787.88 14".61911.ee 79.45 79.45 75.68 7".)
~)4 5.01 OF EACH>:
25.
".)6 xF sHulDowN AT EHD QF-REPORT rrRIQD, EsTxMATED DATE QF START UP:
1 r<<r89 UNITS 1H TEST STATUS (PR1'QR TO COMMERCIAL OPERATION >:
FORECAST ACHIER ED INITIAL CRITXCALITY XN1T1AL El I='CTI<ICITY COMMERCXAL OPERATIQH MEM/DATAREPa/2/OS4 1.16
Zgg L CO RUN DATE 11/87/89 I<UN,T3:HE 1 8: 46: 38 4L'I ANT PERI=ORHANCE DATA SYNE Ar%5DXX B AVERAGE DAXLY f O~ LEVEL I.IAIRRXS UNIT PAGE RPD39-888 OCTOBER 1989 DAY AVG DAILY I OMLR I EVEL (HME-NET)
DQCI<ET NO. 8>8-488 CQHPLETED BY HARI< M.
I-IALE TELEI~I<ONE (91 9) 362-2944 DAY AVG. DAlLY I'OWER LEVEL
<HME-NET) 2h 27 38 MEM/DATAREPa/3/OS4
I ~
I I
I 'll 5 ~
I
~
~
~ '
~
~
~
~ ~
~
~
I;
~
~
I ~
~
~
~ ~
~ ~
~ I
~
~
~
~
~
I I ~ ~
~
I
~ ~
~
~
I
~
~
I
~
~
~
~
~ ~
~
~
~
~
~
~
~
~
~
I
~
~
~
~ ~
~ '
~
~
I
~
~
~
~
~
~
I;
~
~
~
I ~..
~
~
~
~
~
~ ~
I
~
I
~ I.;
~
~
~
~
~
~
~
~
~
~
~
I
~
I
~
~
I ~
I 1
I ~
I I
I 'l
~
~
I
~
~
I
~
~
I
~
~
~ ~
~
~
~
~
~
~
I ~
~ ~
I ~
~
~
~
~
~
~
~
~
~
I
~
~
~
~
I I '- ~
~
~ ~
I I
t
~
~
I ~.