Advises That 890626 Rev 15 to Emergency Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable W/Two Exceptions. Emergency Action Level Can Not Be Incorporated Into Plan as Proposed
ML18005B149
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/08/1989
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Eury L
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8911220324
Download: ML18005B149 (3)


Text

ACCELERATED DISTRIBUTION DEMOQTPWTION SYSTEM I

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8911220324 DOC.DATE: 89/11/08 NOTARIZED:

NO

.FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION STOHR,J.P.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION EURY,L.W.

Carolina Power

& Light Co.

DOCKET 05000400 1

SUBJECT:

Advises that 890626 Rev 15 to emergency plan consistent w/provisions of 10CFR50.54(p) 6 acceptable.

DISTRIBUTION CODE:

IE35D COPIES RECEIVED:LTR J ENCL I SIZE:

TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep CiL NOTES:Application for permit renewal filed.

05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: AEOD/DOA/IRB NRR/PMAS/ILRB12 OC/LFMB RGN2 FILE 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

0 1

1 1

1 1

1 RECIPIENT ID CODE/NAME BECKER,D NRR/DREP/EPB 10 NUDOCS-ABSTRACT 02 NRC PDR COPIES LTTR ENCL 1

1 1,

1 1

1 1

1 1

1 I

I

('

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 12 ENCL 11

NOV 08 1989 Carolina Power and Light Company ATTN:

Nr. Lynn W. Eury

, Executive Vice President

-,",-Pov(er Supply P. 0.

Box-'-'1551

Raleigh, NC 27602 Gentlemen:

SUBJECT:

SHEARON HARRIS EMERGENCY PLAN REVIEW, DOCKET NO. 50-400

'We ha've completed our review of Revision 15 to the Shearon Harris Emergency

Plan, dated June 26,
1989, and the Emergency Plan changes submitted in-accordance with 10 CFR 50.54.

Our review indicated that the changes incorporated as Revision 15 meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

Regarding your proposed Emergency Action Level (EAL) changes submitted to NRC for review prior to implementation, we have evaluated the changes and found them acceptable for incorporation into your Emergency Plan with two exceptions.

The proposed Unusual Event EALs regarding plant shutdown per Technical Specifications and effluent releases, have not been revised consistent with current NRC policy and do decrease the effectiveness of the Plan.

Therefore, the EALs cannot be incorporated into the Plan as proposed.

This matter was discussed during a telephone conversation between A.= Garrou of your staff 'and A. Boland of Region II on October 23, 1989.

Please be reminded that 10 CFR 50.54(q) requires that proposed changes which decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission.

However, changes may be made without Commission approval if such changes do not decrease the effectiveness of,the
Plan, and the Plan, as
changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(o).

Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements to 10 CFR 50, Appendix E, Section V.

Should you have any questions regarding this letter, please contact Nr. William H. Rankin of our staff at (404) 331-5618.

Sincerely,

.IGINALSIGNED SY I-:.LLIr. STOH~

cc:

(See page 2)

I J. Philip Stohr, Director Division of Radiation Safety and Safeguards eS Xf-ici='ZO:"9;SOS POh

= ADClCI; C~;C>004eiO F,'OG

Carolina Power and Light Company cc w/encl:

R. B. Richey, Manager Harris Nuclear Project Box 165 New Hill, NC 27562 C. S. Hinnant Plant General Manager Harris Nuclear Project Box 165 New Hill, NC 27562 Richard E. Jones General Counsel Carolina Power 5 Light Company P. 0.

Box 1551

Raleigh, NC 27602 Dayne H. Brown, Chief Radiation Protectior.

Branch Division of Facility Services N.

C. Department of Human Resources 701 Barbour Drive

Raleigh, NC 27603-2000 Nuclear Energy Public Information Committee c/o Triangle J Council of Governments P. 0.

Box 12276 Research Triangle Park, NC 27709

'tate of North Carolina bcc w/encl:

C. Barth, OGC A. Upchurch, Chairman, Triangle J Council of Governments Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Box 3158 New Hill, NC 27562 10/Q/89

DRSS MRankin 10/q( /89 RII: DPP HDance 10

( /89