ML18005B101
| ML18005B101 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 09/30/1989 |
| From: | Hale M, Richey R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| HO-893050-(O), NUDOCS 8910190134 | |
| Download: ML18005B101 (8) | |
Text
gc CPLERATED DJS1BUTI ON DEMONSTR ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8910190134 DOC.DATE: 89/10/11 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.
Carolina Power 6 Light Co.
RICHEY,R.B.
Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
SUBJECT:
Monthly operating re o
ept 1989 for Harris Nuclear Power Plant Unit 1. /8910 1 tr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE'-
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed.
05000400 RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 10 NRR DREP RPB 10 KG 01 EXTERNAL: EG&G SIMPSON,F NRC PDR COPIES LTTR ENCL 3
3 1
1 10 10 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 LPDR NSIC COPIES LTTR ENCL 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 NOIE TO ALL 'KIDS" RZCZPIEPIS:
PLEASE HELP US XO RZXXKR MASTEI CON~ THE DOGMA'XWZROLDESK RXN P1-37 (EXT. 20079)
KO EIiBGNAIR KRR NME HKH DI8TlM3UZIQN LTBT8 HK DO(XlMHKS YOU DEPT NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 29 ENCL 29
@ME Carolina Power 8 Light Company HARRIS NUCLEAR PROJECT P. 0.
Box 165 New Hill, North Carolina 27562 OCT
> f 1989 File Number.
SHF/10-15505 Letter Number.'O-893050 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.
1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT
Dear Sirs:
In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.
1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of September 1989.
1 Yours very truly, MWH:dj Enclosure R. B. Richey Manager Harris Nuclear Project cc'Messrs.
S.
D. Ebneter (NRC-RII)
R.
G. Oehl (DOE)
J.
E. Tedrow (NRC-SHNPP)
(
8910190134 89@ORE PDR ADOCK 050bv400 R
PDC MEM/DATAREPa/1/OS4
L,.
1
~
h
'CPh'o
- ')
)
RuN DArl=-
1ere9r89 RUH TXME 88:29:41 e PLANT PERFORMANCE DATA S
'M QPEI'CAT XNG DATA IXI=I"-GIRT HARRIS uNxT PAGE IRPD36-88C OPER ATIHG STATUS DOCI(ET HO. 058-480 COMPLETED K<Y HARI( M.
I-IAL.E I'ELEPI.IONE
<919)362-2944
- 1. uNI'r NAME:
I-IARRxs uNxr 1
NOTES There are 157 assemblies I
2.
REI'ORTING I'L'RXOD: Bl PTEHBER 89 lin the reactor, 106 spent fuel I
3.
LXCEHBED Tl-IERMAL POWER (NIMT): 2775 lassemblies in Spent Fuel Pool B, I
4.
NAMEPLATE I'<ATING (GROSS HME): 950.9 l54 of the spent assemblies are BWR 5.
DESIGH ELECTRICAL RATING (HET HWE): 988.0 land were shipped from Brunswick.
I 6.
MAX DEIJENDADLI:- CAPAC1TY (GROSS MME>: 920
~ 0 IThere are 52 new PWR assemblies in I
7.
HAX DEPENDABL.E CAPACITY <NET MME): 868.0
-Spent.-Fue3:Wouk-B-&n-Fuel-Cyc3w-9:
8.
xl': cHANGEs o(".culi xH CAPACITY RATINGS
<ITEMS 3 THRu 7>
sxHcE LAST Rl:-PORT, N/A 9.
POWER LEVEI TO WHICH RESTRXCTI=D IF ANY'(HFT HME>:
1 8.
REASONS FOR RES) TRICTION IF ANY:N/A THIS HGNTI-I YR TO CUMUL ArxvE 11.
HOURS IN REPQR'TING PERIOD 720.88 6551*00 12.
HUMDEI( QF HOURS Ikl'.ACTOR CRITICAL 728.08 6469.28 1 3.
REACTOR RES)ERVE SHUTDOMN I-IRS
.68
.00 14.
Isoulis GENERATOR OH LxNE 720.80 6430.65 15.
UNX'I'ESERVE S)l-IUTDGMH HOURS
.ee
.88 16.
GRUBS THERHAI L'Hl'=RGY GEN ~
(HWH) 1998454.22 17365298 '6 17.
GROSS ELEC.
ENERGY GEN*
(HMI-I) 654335.88 5744954.80 18 HET ELEC LHI.=.RGY GEHERATED (HMH) 613398 00 5376628 08 19.
UNIT SERVXCE FACTOR 186*80 98.16 20.
UNIT AVAIL.AGILITYI='ACTOR 180.80 98.16 21.
UNIT CAP.
FACTOR (USXHG HDC NET) '9.06 95.43 22.
UNIT CAP.
FACTOR (USING DER NI=T>
94.66 91.19 uHxT FoRcED ouTAGE
.88 1.84 24.
SHUTDOWNS BCHI.:D.
OVER NEXT 6 MONTHS <TYPE,
- DATE, AHD DURATION Refueling Outage, October 21,
- 1989, 8 weeks.
.1192.ee 17504.28
.80 17214.88
.00 45613')53 7-.)
15145461.08 14882'344.86 81.23 81.23 77.27 73.84 5.62 OF EACH):
.. 5. IF SI-IUTDOMN AT END OF RFPQRT
- PERIOD, EST IHATED DATE OF START LIP:
'. 6.
UNlTS IH TEST TATUS (PR1QR TQ CQNHLRC1AL Ol ERATXGN>:
FORECAST ACHIEVED INITIAL CRITICAL1TY XNIrx Al LLI=-cTRxcx T Y CQHMERClAL OPERATION MEM/DATAREPa/2/OS4
I 4
t
CPA'o.
CO
',RuH DATE
<ere9r89 RUH TIHE 88:29:38 tPLAHT PEI(FORNAHCE'ATA SY N
APPENDIX 9 AVERAGE DA'ILY POWER LEVEL IHAIRI'<XS UH1T PAGE RPD39-006 SEPTEMBER 1989 DAY AVG. DAILY POWER LEVEL (HWE-NET)
DOCI<ET NO. ere-4eO CONPLETED K~Y HARI< W.
HALE 1'ELEPISONE (919)362-2944 DAY AVG.
DA1LY I"-OWEIR LEVEL (NWE-NET) 18 20 7
844 24 12 820
".)7 844
- 1. 1d) 8 MEM/DATAREPa/3/OS4
DOCKET NO.:
050-400 UNIT:
Harris Unit 1
DATE:
September 1989 COMPLETED BY:
Mark Hale OPERATIONS
SUMMARY
Harris Unit 1 operated at a 100.00 percent Availability Factor for the month of September with a
99.06 percent capacity factor.
There was one load reduction.
Details are provided on the Unit Shutdowns and Power Reduction Sheet.
There are 157 fuel assemblies in the reactor vessel and 106 spent fuel assemblies in Spent Fuel Pool B.
54 of the spent fuel assemblies are BWR and were shipped to Harris from CP&L's Brunswick Plant.
There are also 52 new PWR.
assemblies in Spent Fuel.
Pool B for Fuel Cycle 3 and 0 assemblies in the new fuel pool.
MEM/DATAREPa/1/OS4
UNIT SHUTDOWNS AND POWER REDUCTION REPORT MONTH:
SEPTEMBER 1989 DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
050>>400 Harris 10/9/89 M. W. Hale (919) 362-2944 No.
Date Tl y
P e
Duration (Hours)
Method of Shutting Down Reactor Licensee Event Report i System Code 4
Component Code 5
Cause 8 Corrective Action to Prevent Recurrence 89%22 890916 N/A VALVEX Load reduced to 70$ to perform turbine valve testing.
The required tests were completed and the unit was returned to full load.
F:
Forced S:
Scheduled Reason:
A-Equipment Failure (Explain)
B&aintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 6 License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
Method:
I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-016'I)
Exhibit I - Same Source MEM/DATAREPa/4/OS4