,J ggcP~RA.TZD D1SIKBU'EON DKMONSTRA,TION SYSTEM REGULATORY INFORMATION DXSTRIBUTXON SYSTEM (RXDS)
ACCESS&)N NBR:8909140008 DOC.DATE: 89/09/08 NOTARIZED-NO DOCKET FACIL:50-400 Bhearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION I
LOFLXN,L.I.
Carolina Power 6 Light Co.
RECIP.NAME RECIPIENT AFFILIATION 84lO-al OEM Document Control Branch (Document Control Desk)
R
SUBJECT:
Forwards BAW-2083, "Analysis of Capsule U CPGL Shearon Harris Unit 1 Reactor Vessel Matl Surveillance Program."
DISTRIBUTION CODE:
A008D COPIES RECEXVED:LTR ENCL SIZE:
TXTLE: OR/Licensing Submittal: Reactor Vessel M terial Surveillance NOTES:Application for permit renewal filed.
D Report 8
05000400 RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS NRR/DEST/CEB 8H NRR/DEST/MTB 9H NRR/DOEA/TSB ll NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EXB EXTERNAL: LPDR NSIC COPIES RECIPIENT LTTR ENCL ID CODE/NAME 1
0 PD2-1 PD 1
1' 6
NRR/DEST/ADS 7E 1
1 NRR/DEST/ESB 8D 1
1 NRR/DEST/RSB 8E 1
NRR/PMAS/ILRB12 1
1 RE~/MEB 1
1 NRC PDR 1
1 ORNL KAM,F COPXES LTTR ENCL 5
5 1
1 1
1
,1 1
1 1
1 0
1 1
1 1
1 1
1 1
NOPE TO ALL 'KIDS" RECIPIWIS:
PLEASE HELP US IO REDUCE gASTE! ~~CI'HE DO(%MEZZ COWZROL DESK ROCN Pl-37 (EXT. 20079)
KO EZ4IMINATB YOUR NAME PRH DISTRIBUTION LISTS FOR DOCUMEZIS YOU DCRiFT NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 30 ENCL 27 R
I D
S h
D D
S
CÃQE Carolina Power & Light Company SEp o 8 SSs SERIAL:
NLS-89-257 10CFR50 Appendix H III.A United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 REACTOR VESSEL COUPON ANALYSIS
SUMMARY
TECHNICAL REPORT Gentlemen:
Carolina Power 6 Light herein submits the attached summary technical report for the evaluation of the first Shearon Harris Nuclear Power Plant reactor vessel capsule analysis.
The report shows that the neutron irradiation effects on the reactor vessel beltline materials are within expected levels.
Appendix H to 10CFR50 requires a summary technical report of reactor sample tests t:o be submitted within one year of capsule removal.
The first capsule was removed from the SHNPP 'core on September 4,
1988.
Therefore the attached report should have been submitted by September 4,
1989.
The additional days necessary to complete CP&L's final review and submission of the report was communicated to the NRC SHNPP Project Manager and site Resident Inspector on September 6, 1989.
Please refer any questions regarding this submittal to Mr. Steven Chaplin at (919) 546-6623.
Yours very truly, Leonar of 'n Manager Nuclear Licensing Section cc:
Mr. R. A. Becker Mr.
W. H. Bradford Mr. S.
D. Ebneter 411 Fayettevilte Street o P. O. Box 1551 o Raleigh, N. C. 27602 S90914000S S9090S PDR ADOCK 05000400 P