ML18005B020

From kanterella
Jump to navigation Jump to search
Forwards Semiannual Radioactive Effluent Release Rept, Jan-June 1989 & Rev 3 to ODCM
ML18005B020
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/29/1989
From: Richey R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18005B021 List:
References
HO-890085-(O), NUDOCS 8909050094
Download: ML18005B020 (4)


Text

gt:KLER47ED D1SQIBUTJON DEMONSTRQON

~STZM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8909050094 DOC.DATE: 89/08/29 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION RICHEY,R.B.

Carolina Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET g

05000400 R

D 05000400 A.

NOTES:Application for permit renewal filed.

COPIES LTTR ENCL g

RECIPIENT ID CODE/NAME PD2-1 PD RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D COPIES LTTR E L

SUBJECT:

Forwards

".Semiannual Radioactive Effluent Release

Rept, Jan-June 1989>>

& Rev 3 to

>>ODCM n

DISTRIBUTION CODE:

IE48D COPIES RECEIVED:LTR i ENCL g SIZE: / +l 6Q TITLE: 50.36a(a)(2)

Semiannual Effluent Release Reports INTERNAL: ACRS IRM TECH ADV NUDOCS-ABSTRACT RGN2 DRSS/RPB EXTERNAL BNL TICHLERiJ03 LPDR 1

1 1

1 1

1 2

2 1

1 1

1 AEOD/DSP/TPAB NRR D EP RPB 10 RGN2 FILE 02 EGGG SIMPSON,F NRC PDR 1

1 2

2 1

1 1

1 2

2 1

1 h

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL

~ a 4

cia

CREE Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0.

Box 165 New Hill, North Carolina 27562 AUG 2 9 1989 File Number:

SHF/10-13510C Letter Number:

HO-890085 (0)

U.S. Nuclear Regulatory Commission ATTN:

NRC Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT UNIT 1

DOCKET NO. 50-400 LICENSE NO. NPF-63 SEMIANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT Gentlemen:

In accordance with Technical Specification 6.9.1.4, the Semiannual Radioactive Effluent Release Report is attached for the Shearon Harris Nuclear Power Plant.

This report covers the period from January 1,

1989 through June 30, 1989.

Very truly yours, R. B. Richey, Manag r Harris Nuclear Project MGW:djs Attachment cc:

Mr. R. A. Becker (NRR)

Mr. W. H. Bradford (NRC-SHNPP)

Mr. S.

D. Ebneter (NRC-RII)

(

3909050094 390329 PDR ADOCK 05000400 R

PDC MEM/HO-8900850/1/OS 1

I

'I t