Text
SUBJECT:
Forwards FEMA 890328 findings re adequacy of State of NC local emergency plans site-specific to plant.
DISTRIBUTION CODE:
ZE3SD COPIES RECEIVED:LTR J ENCL /
SIZE:
/
TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr Exercise Rep D
05000400 8
NOTES:Application for permit renewal filed.
gCCEKZRATED DlK'KBU'EON DKMONSTRATIO'.i SYSTEM REGULATORNFORMATION DISTRIBUTION TEM (RIDE)
.-ACCESSION NBR:8906060200 DOC.DATE: 89/05/18 NOTARIZED:
NO DOCKET
<FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION COLLINS,D.M.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION EURY,L.W.
Carolina Power 6 Light Co.
RECIPIENT ID CODE/NAME PD2-1,PD ZNTERNAZ: NRR/DREP/EPB 10 NUDOCS-ABSTRACT
~G EILE ~~0 RGN2/DRSS/EPRPB EXTERNAL: LPDR NSZC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 RECIPIENT ZD CODE/NAME BECKERFD NRR/PMAS/ILRB12 OC/LFMB RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1'
1 1
1 0
1 1
1 1
h R
D S
NOZE 'ZO ALL 'SIDS" RZXXPIZZIS:
PZZASE KKP US V3 REIXKB KLSTBl CGÃZACT 'IHE DOQMXZ CGPZK)L DESK, IZSTB XQR, DOCUMEÃIS YOU DGNFT NEEDt TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL 11
Carolina Power and Light Company ATTN:
Mr. Lynn W. Eury Executive Vice President Power Supply P. 0.
Box 1551
- Raleigh, NC 27602 Gentlemen:
SUBJECT:
FEMA FINDINGS REGARDING STATE AND LOCAL EMERGENCY PLANS FOR THE HARRIS PLANT Enclosed are the findings by the Federal Emergency Management Agency (FEMA) regarding the adequacy of the State of North Carolina and associated local emergency plans site-specific to the Shearon Harris Nuclear Power Plant.
If you have any questions on this matter, please let us know.
Sincerely, 6;:-'-al sip~ 4 Lg. 89NJS.~
'ouglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards
Enclosure:
Letter dated March 28,
- 1989, from G.
C. Peterson (FEMA) to V. Stello, Jr.,
(NRC) cc w/encl:
R.
B. Richey, Manager Harris Nuclear Project D. L. Tibbitts, Director Regulatory Compliance C.
S. Hinnant, Plant General Manager State of North Carolina bcc w/encl:
C. Barth, OGC NRC Resident Inspector A. Upchurch, Chairman, Triangle J Council of Governments Document Control Desk RIf II RII~~I eh in
.HDance 5//3/89 5/p /89 5/ g/89 8906060200 8'70528 PDR ADOCK 05000<00 F
PNU Wa3 s-