REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION
NBR 890 3 230 4 5 4
DOC ~ DATE
89/0 3/0 6
NOTARIZED'O
DOCKET t
FACIL:50-400 Shearon Harris Nuclear
Power Plant, Unit 1, Carolina '5000400
AUTH.NAME
AUTHOR AFFILIATION
EEBLES,T.A.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEYIE.E.
Carolina
Power
a Light Co.
SUBJECT:
Forwards
Insp Rept 50-400/89-04
on 890130-0203.No violations
noted.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR
I
ENCL g
SIZE: ++ ~
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
05000400
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
AEOD/DEIIB
NRR SHANKMANiS
NRR/DLPQ/PEB
11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OE LIEBERMANIJ
G
02
TERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BECKER,D
DEDRO
NRR/DEST DIR
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS1
RGN2
FILE
01
NRC
COPIES
LTTR ENCL
1
1
1'
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
R
D
S
NVZE 'IO ALL IIRIDS>< RECIPIENIS
PIZASE HELP US TO REDUCE WASTE.'ONI'ACI'IHE DOCXMWZ CDNIHDL DESK,
RXN Pl-37
(EXT. 20079)
XO EIZKBRXB YOUR NAME PKR DISTRIBUTION
LISTS FOR DOCUMEMIS YOU DCSERT NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
25
ENCL
25
March 6,
1989
Docket No. 50-400
License
No.
Carolina
Power
and Light Company
ATTN:
Mr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P.
O.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NO. 50-400/89-04
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
C.
Smith
on January
30 - February
3,
1989.
The inspection
included
a review
of activities authorized for your
Shear on Harris facility.
At the conclusion
of the
inspection,
the
findings
were
discussed
with those
members
of your
staff identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
The enclosed
Inspection
Report identifies activities that appeared
to violate
NRC requirements
but are not cited; therefore,
no response
is required.
Your attention
is invited to the unresolved
item identified in the Inspection
Report.
This matter will be pursued during future inspections.
In
accordance
with Section
2.790
of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a.copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Enclosure:
(See
page
2)
(Original signed
by T. Peeblea)
Thomas
A. Peebles,
Chief
Operations
Branch
\\
Division of Reactor Safety
O'703230454
89030b
ADDCK 05000400
8
PNU
Carolina
Power
and Light Company
March 6,
1989
Enclosure:
Inspection
Report
cc w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
D.
L. Tibbitts, Director of Regulatory
Compliance
C.
S. Hinnant, Plant General
Manager
State of North Carolina
"bcc w/encl:
C. Barth,
NRC Resident
Inspector
A. Upchurch,
Chairman,
Triangle J
Council of Governments
DRS Technical Assistant
Document Control
Desk
RII
RI I
C mith:svh
'Lea
03/ ~89
03/ m/89
RII g
FJa]e~
03~/89
RII
PFrederi ckson
03+ /89
RI I i~
TA eebles
03/&/89