ACCELERATED D
BUTION DEMONSATION SYSI'EM REGUIAT INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8902070068 DOC.DATE: 88/12/31 NOTARIZED:
NO DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME AUTHOR AFFILIATION WATSON,R.A.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Annual rept of individuals receiving exposures greater than 100 mrem/yr
& associated manrem.exposure for 1988.
DISTRIBUTION CODE:
IE56D COPIES RECEIVED:LTR 3 ENCL I
SIZE:
TITLE: 20.407 Annual Personnel Monitoring Rpt/Annual Rad Exposure Rpt by Fun i NOTES:Application for permit renewal filed.
05000400.
c RECIPIENT ID CODE/NAME PD2-1 LA BECKER,D INTERNAL: ACRS NMSS/IMSB 6H3 NRRgD 10 RL E
RGN2 01 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
0 1
0 6
6 1
1 2
2 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DSP/TPAB NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RES BROOKSPB NRC PDR COPIES LTTR ENCL 5
5 1
1 1
1 1
1 2
2 1
1 NCTE IO ALL "RIDS" RECIPIENIS'IZASE HELP US 'IO REXKZ HASTE!
CGA'ACT 'IHE DOCUMEÃZ CGHIBDL DESK, ROC'l-37 (EXT. 20079)
IO ELZlGNATB YOUR NAME FRY DIPIVGEIOTIGN LISTS FOR DOCUMEKIS YOU DOH'T NEED!
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 26 ENCL 24
Carolina Power & Light Company HARRIS NUCLEAR PROJECT P.
O.
Box 165 New Hill, North Carolina 27562 FEB 01 1989 File Number'SHF/10-135010I Letter Number.
HO-890011 (0)
Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO. NPF-63 ANNUAL OPERATING REPORT Gentlemen.'n accordance with Technical Specification 6.9.1.2 for the Shearon Harris Nuclear Power Plant, Unit No.
1, Carolina Power and Light Company herewith submits the annual report of (a) individuals receiving exposures greater than 100 mrem/yr and their associated manrem exposure according to work and job functions, (b) primary coolant iodine
- spikes, and (c) challenges to the pressurizer power-operated relief valves (PORVs) and primary safety valves for 1988.
Very truly yours, q0P0 0068 8 oo0400 pDR ADOCK 05 R
R. A. Watson Vice President Harris Nuclear Project MGW:dj Enclosure cc:
Messrs.
W. H. Bradford (NRC-SHNPP)
M. L. Ernst (NRC-RII)
J.
M. Taylor (NRC)
MEM/HO. 8900110/1/OS1
.Document Control Desk Page 2
R IMS I I NUMBER OF PERSONNEL AND MAN-REM BY WORK AND JOB
- FUNCTION, 1988 HARRIS PLANT NUMBER OF PERSONNEL 100 MREM TOTAL MAN-REM WORK AND JOB FUNCTION STAT UTIL CNTR I
STAT UTIL CNTR REACTOR OPERATIONS AND SURVEILLANCE MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 4
0 5
33 1
11 19 0
40 0
0 0
0 0
1
- 1. 201 10.420
- 7. 134 0.087 0.452
- 0. 040
- 4. 614
- 0. 128 5.598 0.060 13.003 0.025 0.020 0.120 0.360 ROUTINE MAINTENANCE MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 27 0
0 0
4 9
48 0
1 0
6 0
0 1
2 7.976 0.027 0.362 0.000
- 1. 331 2.297 0.000 0.011 0.000 0.297 15.288 0.495 2.356 0.000
- 1. 846 INSERVICE INSPECTION-MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 10 0
22 0
19 1
10 0
0 0
23 1
0 1
26 3.740 0.389 4.403
- 0. 109 0.000
'.095 5.657 0.080 7.232 0.060
- 0. 125 0.000 6.883 0.647 16.482 SPECIAL MAINTENANCE MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL WASTE PROCESSING MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 27 11 101 0
0 2
9 0
26 0
0 0
13 4
84 0
0 0
0 2
0 0
0 0
0 10.256 0.243 3.533 0.000 4.626 0.000 0.000 1.345 0.000 0.000 3.332 49.636 0.000 0.805 0.061 7.097 0.000 0.090 1.061 42.386 0.000 0.315 0.000 0.000 0.000 0,110 0.000 0.000 0.000 0.032 REFUELING MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
- 0. 210
- 0. 172
- 0. 100 0.000 0.160 0.065 0.005 0.000 0.000 0.058 0.070 0.000
- 0. 175 0.000
- 0. 815 TOTAL MAINTENANCE PERSONNEL OPERATING PERSONNEL HEALTH PHYSICS PERSONNEL SUPERVISORY PERSONNEL ENGINEERING PERSONNEL 68 21 164 33 1
14 52 0
95 0
1 0
36 6
113 23.383
- 10. 971
- 18. 131
- 0. 147 13.452
- 6. 123 74.326 0.133 6.993 0.212 29.973
- 0. 150
- 0. 110
- 2. 183
- 61. 921 GRANO TOTAL 189 29 386 66.084 8.801 173.323 Notes:
(1) Dose based on pocket dosimeters (2) Stat
~ )larris Plant"staff Uti.l ~ CP&L non-llarr18 personnel Cntr Contractor
Docu!.: !it Control Desk Page 3
1988 ANNUAL REPORT PRIMARY COOLANT IODINE SPIKES
.During 1987, the primary coolant did not exceed 1.0 !!Ci/gram dose equivalent I-131 or )
100/E/!!Ci/gram dose as set forth in Technical Specification 3.4.8.
MEM/HO"8900110/3/OS1
Document Control Desk Page 4
1988 ANNUAL REPORT PRIMARY SAFETY AND RELIEF VALVE CHALLENGES On October 20,
- 1988, pressurizer power.
operated relief valve (PORV) 1-PCV-444B lifted and released approximately 28 gallons of reactor coolant to the Pressurizer Relief Tank.
The PORV was immediately reshut.
Actual system pressure was not the initiating factor for this event based on normal pressure readings observed through protection channels prior to the PORV lifting.
The cause of the event was determined to be due to Radio Frequency Interference from a portable radio used by Operations personnel inside containment at the time of the event.
Operations personnel were instructed to use the phone system for future communications.
Subsequently, no similar incidents have been observed.
MEM/HO-8900110/4/OS1