ML18005A758

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1988 for Harris Nuclear Power Plant Unit 1
ML18005A758
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/31/1988
From: Hale M, Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
HO-884046-(O), NUDOCS 8901190186
Download: ML18005A758 (9)


Text

, ACCELERATED D1S1BUT1ON DEMONSTRATION SYSTE)rl REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8901190186 DOC.DATE: 88@&9~

NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION HALE,M.W.

Carolina Power

& Light Co.

WATSON,R.A.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION DOCKET g

05000400 S

05000400 NOTES:Application for permit renewal filed.

SUBJECT:

Monthly operatin for Dec 1988 for Harris Nuclear Power Plant Unit, 1.W 90113 r..

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR i ENCL i SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRRJJ~)P RPB 10 G FILE 01 EXTERNAL: EG&G SIMPSON,F LPDR NSIC COPIES LTTR ENCL 1

0 1

0 10 10 1

1 1

1 1

1

'1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN2 EG&G WILLIAMS,S NRC PDR COPIES LTTR ENCL 5

5 1

1 2

2 1

1.

1 1

1 1

1 1

1 1

h NOTE K) ALL>>RIDS" RECIP~:

PLEASE HELP US TO REDUCE WASTE.'XNTACT 'QK DOCUMENT CCÃZROL DESK, ROOM Pl-37 (EXT. 20079) K) EZiQ~ATE YOUR NAME FROM DI~GKlTIGN LISTS FOR DOCUMEHIS YOU DGNIT NEED' TOTAL NUMBER OF COPIES REQUIRED:

LTTR 32 ENCL 30

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

December 1988 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 85.60 percent Availability Factor for the month of December with a

85.07 percent capacity factor.

There was one maintenance outage.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor vessel and 52 spent fuel assemblies in the Harris Unit 1 spent fuel pool and 0 assemblies in the new fuel pool.

890ii90i86 88i23i PDR ADOCK 05000400 R

PDC MEM/DATAREPa/3/OS4 l(

. 'CPt.L CQ RUN GATE 8<Z84r89 RUN TIME 15:37:18

-'LANT F'ERFORHANCE DATA SY!

H OPERATING DATA REPORT I-IARRIS UNIT PAGE RPD36-000 OPERATING STATUS DOCI(ET NO. 850-400 COHF'LETED BY MARY. W.

HALE TELEPI.IONE

<919)362-2944 2 4 3.

45.

6.

7.8.

UNIT NAME:

I.IARRIS UNIT RFF'QRTING F'ERIOD:

DECEMBER 88 LICENSED THERHAL POWER (HMT): 2775 NAHFPLATE RATING (GROSS MWE): 950.9 DESIGN ELECTRICAL RATING <NET HME): 900.0 HAX DEPENDABLE CAPACITY (GROSS HWE): 9.0.0 HAX DEF'ENDABLE CAPACITY (NET HME): 860.0 IF CHANGES OCCUR IN CAPACITY RATlNGB (ITEMS GIVF REASONS:

N/A I

NOTES I

I There are 157 fuel assemblies in I

the reactor and 52 spent fuel I

I assemblies in the spent fuel pool I

I I

I I

3 THRU 7)

SINCE LAST REPORT, 9.

<8.

POWER LEVEL TO WHICH RESTRICTED IF ANY (NET HWE): None.

REASQNS FOR RESTRICTION IF ANY:

N/A THIS HONTI-I YR TO DATE CUHUL ATIYE 11.

2 4 13.

f4.

15 ~

16.

17.

18.

20.

25.

~

A

  • 23
  • IIQURS IN REF'ORTING F'ERIOD NUMBER OF HOURS RI=ACTOR CRITICAL REACTOR RESERVE Sl-IUTDOWN I IRS HOURS GENFRATOR ON LINE UNIT RESERVE SHUTDOWN IHOURS GROSS THERMAL ENERGY GEN.

(HWH)

GROSS ELEC.

ENERGY GEN.

(HWI-I)

NET ELEC.

ENERGY GENERATED (HWH)

UNIT SERVICE FACTOR UNIT AVAILABILITYFACTOR UNIT CAP.

FACTOR (USING HDC NET)

UNIT CAF'.

FACTOR (USING DER NET)

UNIT FORCED OUTAGE RATE SHUTDOWNS SCHED.

OYER NEXT 6 HQNTHS 744.80 645.77

.00 636.90

.00 3722828.78 583788.80 544297.00 85.60 85.60 85.07 8$.29

.80 (TYPE,

DATE, 8784.00 6585.11

.00 6460.63

.88 1789851(.70 5735289.00 5327487.00 73.55 73.55 70.52 67.39 4.23 AND DURATION 14641.88 i)835.88

.00 18784.23

.00 28248663.86 9400507.00 8786336 80 73.66 73.66 69.35 66.07 6.82 OF EACI-I):

IF Bl-IUTDOWN AT END OF REF'QRT F'ERI QD, ESTIMATED DATE OF START UF':

UNITS IN TEST STATUS (PRIOR TQ COHHERCIAL OPERATION ):

FORECAST ACI.IIEVED INITIAL CRIT ICAI ITY INITIAL ELECTRICITY CQHHERCIAL QF'ERATION HEM/DATAREPa/4/OS4

I,

~

I r

'CPLL CO RUN )5ATE ef /04/89 RUN TIME 35:37:16

'LANT PERFORMANCE DATA SY'PPENDIX B AVERAGE DAILY POWER LEVEL I-IARR IS UNIT PAGE RPDZ9-0ee DECEMBER DAY AVG. DAlLY POWER LFVEL (MWE-NET)

DOCKET NO. '50-400 COMPLETED BY MARK W.

HALE TELEPHONE-(919)362-2944 DAY AVG. DAILY POWER LEVEl (MWE-NFT) 886 2e 870 880 891 890 887 MEM/DATAREPa/5/OS4

II I

~

~

I ~

I I

~ I

~

~

I

~

~

I;

~

~

~ ~

~

~

~

~

I ~

~ ~

~

~

~

I

~

~

I

~

~

~

~

~

~

~

~

~

~

~

I 4

- I;,

~

~

I

~ ~

I

- ~

~

~ o.

~

~

~

I

~

~

I I ~.

~

~

Carolina Power & Light Company JAN 15 1989 HARRIS NUCLEAR PROJECT File Number:

SHF/10-15505 Letter Number:

HO-884046 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D. C.

20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT

Dear Sirs:

In accordance with Technical Specification 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month of December 1988.

Yours very truly, MWH:msb R. A. Watson Vice President Harris Nuclear Project Enclosure cc'Messrs.

W. H. Bradford (NRC-SHNPP)

M. L. Ernst (NRC-RII)

R.

G. Oehl (DOE)

J.

M. Taylor (NRC)

MEM/DATAREPa/1/OS4