ML18005A754

From kanterella
Jump to navigation Jump to search
Forwards Eddy Current Exam Shearon Harris Nuclear Power Plant Unit 1 Steam Generators a, B & C Aug & Sept 1988. Rept Provides Results of Steam Generator Tube Inservice Insps During First Refueling Outage
ML18005A754
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/13/1989
From: Watson R
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML18005A755 List:
References
HO-880252-(O), NUDOCS 8901180381
Download: ML18005A754 (4)


Text

gC CELE RATED D1.'iTR1 EIUTlON DEMONSTR+ ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR-8901180381=-

DOC.,DATE: 89/01/13 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION WATSON,R.A.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

R

SUBJECT:

Forwards "Eddy Current Exam CP&L Co Shearon Harris Nuclear Power P

nt Unit SGs A,B & C Aug

& Sept 1988."

I l/ 8 D

TRIBUTION CO E: A047 COPIES RECEIVED:LTR t

ENCL Q SIZE:'I E:

OR Submittal: lnservice Inspection/Testing/Relief from ASME Code NOTE pplication for permit renewal filed.

05000400 RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS ARM/DAF/LFMB NRR/DEST/MTB 9H OGC/HDS 1 RES/ DSIR/EIB EXTERNAL: EG&G ROCKHOLD,H NL 007 HEMMING NSIC COPIES LTTR ENCL 1

0 1

1 eL 1

1 1

0 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1. PD AEOD/DSP/TPAB NRR/DEST/MEB 9H e

BSTRACT

~L Ol LPDR NRC PDR COPIES LTTR ENCL 5

1 1

1 1

1 1

1 1

1 1

1 1

Q l&+

.) pe(

R I

S h

NOIR 'IO AIL "RIDS" RECIPZERIS:

PLEASE HELP US TO REDUCE WMmmE1 CORZACT 'IHE DOCUMEQI'GNIBOL DESKI KXM Pl-37 (EXT. 20079)

TO EIQZGMTE YOUR NAME FHCH DISTENTION LISTS H)R DOCUMEÃIS YOU DONiT NEEDf TOTAL NUMBER OF COPIES REQUIRED:

LTTR 26 ENCL D

S

l~

l j$

IIt, Fi',

/P I

I

@ME, Carolina Power & Light Company HARRIS NUCLEAR PROJECT P.O.

Box 165 New Hill, North Carolina 27562 JAN 15 1989 File Number:

SHF/10-13510C Letter Number.

HO-880252 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO ~ 50-400 LICENSE NO. NPF-63 SPECIAL REPORT STEAM GENERATOR TUBE INSERVICE INSPECTION RESULTS Gentlemen.'n accordance with Technical Specifications 4.4.5.5.b and 6.9.2 for the Shearon Harris Nuclear Power Plant, Unit No. 1, Carolina Power and Light Company hereby submits this Special Report.

This Special Report provides the results of the steam generator tube inservice inspections performed during the Harris Plant's first refueling outage in August and September 1988.

MGW:dj Enclosure Very truly yours, z~~

R. A. Watson Vice President Harris Nuclear Project cc:

Mr. R. A. Becker (NRR)

Mr. W. H. Bradford (NRC SHNPP)

Mr. M. L. Ernst (NRC RII) 80:SZ R

'.AOOC~I SSOggg

--,=-

K 05000400 PIiC MEM/HO-8802520/1/Osl

)/I g h

h