ML18005A727

From kanterella
Jump to navigation Jump to search
Advises That 880822 Rev 14 to Emergency Plan Meets Planning Stds of 10CFR50.47(b) & Requirements of App E & Acceptable
ML18005A727
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/13/1988
From: Decker T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8812200092
Download: ML18005A727 (2)


Text

fCarolina Power and Light Company ATTN:

Mr.

E.

E'. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0.

Box 1551

Raleigh, NC 27602 Gentlemen:

SUBJECT:

SHEARON HARRIS EMERGENCY PLAN REVIEW, REVISION 14, DOCKET NO. 50-400 We have completed our review of Revision 14 to your Shearon Harris Emergency Plan dated August 22, 1988.

Based on our review, we have concluded that the changes meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

Please be reminded that 10 CFR 50.54(q) requires that proposed changes that decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission.

However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the Plan, and the Plan, as
changed, continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q).

Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50,
Appendix, E,Section V.

Should you have any questions regarding this letter, please contact Mr. William H. Rankin of our staff at 404 331-5586.

Sincerely, Thomas R. Decker, Acting Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards

.cc: A. A. Watson, Vice President

~

~

~

Harris Nuclear Project

. L. Tibbitts, Director of Regulatory Compliance C.

S. Hinnant, Plant General Manager State of North Carolina bcc:

(See page 2)

PDR 2 ~8 12i3

~~~:i2 R

ADOCK 0 000400 PDC

Carolina Power and Light Company bcc.

. Barth, OGC

~

~

C Resident Inspector

. Upchurch, Chairman, Triangle J

Council of Governments DRS Technical Assistant Document Control Desk RII~

ABoland:ra 12/g /88 Rankin 12

/88 RI I PFr drickson 12/~/88