Forwards Insp Rept 50-400/88-34 on 880919-23 & 1003-07 & Notice of Violation
ML18005A722
Person / Time
Site: Harris 
Issue date: 11/22/1988
From: Ernst M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A723 List:
References
NUDOCS 8812080113
Download: ML18005A722 (4)


See also: IR 05000400/1988034

Text

gc Cp~~7ED

.Dl

1BUTJON 'KMONSTRP

ON

SYSTEM

.

REGULATOR

NFORMATION DISTRIBUTION

TEM (RIDS)

ACCESSION NBR:8812080113

'OC.DATE: 88/ll/22

NOTARIZED: NO

DOCKET

TAPIL:50-400 Shearon Harris Nuclear

Power Plant, Unit 1

- Carolina

05000400

~

~

~

~

~

~

~

~

AUTH.NAME

AUTHOR AFFILIATION

EANST,M.L.

=

Region

2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina

Power

& Light Co.

SUBJECT:

Forwards

Insp Rept 50-400/88-34

on 880919-23

& 1003-07

&

Notice of violation.

DISTRIBUTION CODE:

IEOZD

COPIES

RECEIVED:LTR /

ENCL Q

SIZE:

o 7 Sg

TITLE: General

(50 Dkt)-Insp Rept/Notice .of Violation Response

NOTES:Application for permit renewal filed.

D,

05000400

S

RECIPIENT

COPIES

,ID CODE/NAME

LTTR ENCL

PD2-1

PD

1

1

RECIPIENT

ID CODE/NAME

BUCKLEY,B

COPIES

LTTR ENCL

1

1

h

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB ll

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/P

S/ILRB12

OE LI

R

NjJ

REG FIL

02

TERNAL: LPDR

NSIC

2

2

1

'

1

1

1

1

2

2

1

1

1

1

1

1

1

.

1

1

1

AEOD

NRR MORISSEAUiD

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS1

RGN2

FILE

01

NRC

PDR

RESL MARTINiD

1

1

1

1

1

1

1

1

1'

1

1

1

1

1

1

1

1

1

1

D

D

S

R

I

S

h

NOXK 'IO ALL 'KIDS" RECIPZEPXS:

PIZASE HELP US 10 REDUCE HASTE!

CXÃIACT 'IHE DOCUMEÃ1'XWZROL DESK,

RDCN Pl-37

(EXT. 20079) m EIiQGNATE KKR KkK FBCH DISTRIBUTION

LISTS P3R DOCUMEHXS YOU DONiT NEED)

D

S

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

24

ENCL

24

-

1

November 22,

1988

Docket No. 50-400

License

No.

NPF-63

Carolina

Power

and Light Company

ATTN:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NO. 50-400/88-34)

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

B. Breslau

on September

19-23 and October 3-7; 1988.

The inspection

included

a

review of activities authorized for your

Shearon

Harris facility.

At. the

conclusion of the inspection,

the findings were discussed

with those

members of

your staff identified in the enclosed

inspection report.

The Operational

Performance

Assessment

(OPA) evaluated

your current level of

performance

in the

area

of plant operations.

The inspection

included

an

assessment

of the effectiveness

of various plant groups

including Operations,

Maintenance,

guality Assurance,

Engineering,

and Training in supporting

safe

plant operations.

Management

awareness

of, involvement in, and support of safe

plant operations

'was also evaluated.

The

OPA was

a

performance

based

team

.

assessment

which identified significant operational

strengths

and weaknesses,

rather

than

a compliance

oriented

inspection.

A number of notable strengths

and

improvement efforts were identified in your programs

and are highlighted

in the executive

summary.

During the

course of the inspection,

however,

certain activities

were noted

which appeared

to violate

NRC requirements.

The violations,

references

to

pertinent

requirements,

and

elements

to

be

included

in your response

are

described

in the enclosed

Notice of Violation.

An unresolved

item was also

identified

during

the

inspection

which will be

pursued

during

future

inspections.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and its enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget

as required

by the

Paperwork

Reduction Act of 1980,

Pub. L. No.96-511.

88120802i3 88ii22

PDR

ADQCK 05000400

6

PNU

"

Carolina

Power and Light Company

November 22,

1988

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

(Original signed

by M. L. Ernst)

Malcolm L. Ernst

Acting Regional Administrator

cc w/encls:

R. A. Watson,

Vice President

Harris Nuclear Project

0.

L. Tibbitts, Director of Regulatory

Compliance

C.

S. Hinnant, Plant. General

Manager

State of North Carolina

bcc w/encls:

C. Barth,i OGC

NRC Resident

Inspector

A. Upchurch,

Chairman, Triangle J

Council of Governments

DRS, Technical Assistant

Document Control

Desk

  • <. P ohr / /88