gc Cp~~7ED
.Dl
1BUTJON 'KMONSTRP
ON
SYSTEM
.
REGULATOR
NFORMATION DISTRIBUTION
TEM (RIDS)
ACCESSION NBR:8812080113
'OC.DATE: 88/ll/22
NOTARIZED: NO
DOCKET
TAPIL:50-400 Shearon Harris Nuclear
Power Plant, Unit 1
- Carolina
05000400
~
~
~
~
~
~
~
~
AUTH.NAME
AUTHOR AFFILIATION
EANST,M.L.
=
Region
2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina
Power
& Light Co.
SUBJECT:
Forwards
Insp Rept 50-400/88-34
on 880919-23
& 1003-07
&
DISTRIBUTION CODE:
IEOZD
COPIES
RECEIVED:LTR /
ENCL Q
SIZE:
o 7 Sg
TITLE: General
(50 Dkt)-Insp Rept/Notice .of Violation Response
NOTES:Application for permit renewal filed.
D,
05000400
S
RECIPIENT
COPIES
,ID CODE/NAME
LTTR ENCL
PD2-1
1
1
RECIPIENT
ID CODE/NAME
BUCKLEY,B
COPIES
LTTR ENCL
1
1
h
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB ll
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/P
S/ILRB12
R
NjJ
REG FIL
02
TERNAL: LPDR
2
2
1
'
1
1
1
1
2
2
1
1
1
1
1
1
1
.
1
1
1
NRR MORISSEAUiD
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS1
RGN2
FILE
01
NRC
RESL MARTINiD
1
1
1
1
1
1
1
1
1'
1
1
1
1
1
1
1
1
1
1
D
D
S
R
I
S
h
NOXK 'IO ALL 'KIDS" RECIPZEPXS:
PIZASE HELP US 10 REDUCE HASTE!
CXÃIACT 'IHE DOCUMEÃ1'XWZROL DESK,
RDCN Pl-37
(EXT. 20079) m EIiQGNATE KKR KkK FBCH DISTRIBUTION
LISTS P3R DOCUMEHXS YOU DONiT NEED)
D
S
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
-
1
November 22,
1988
Docket No. 50-400
License
No.
Carolina
Power
and Light Company
ATTN:
Mr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
(NRC
INSPECTION
REPORT
NO. 50-400/88-34)
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
B. Breslau
on September
19-23 and October 3-7; 1988.
The inspection
included
a
review of activities authorized for your
Shearon
Harris facility.
At. the
conclusion of the inspection,
the findings were discussed
with those
members of
your staff identified in the enclosed
inspection report.
The Operational
Performance
Assessment
(OPA) evaluated
your current level of
performance
in the
area
of plant operations.
The inspection
included
an
assessment
of the effectiveness
of various plant groups
including Operations,
Maintenance,
guality Assurance,
Engineering,
and Training in supporting
safe
plant operations.
Management
awareness
of, involvement in, and support of safe
plant operations
'was also evaluated.
The
OPA was
a
performance
based
team
.
assessment
which identified significant operational
strengths
and weaknesses,
rather
than
a compliance
oriented
inspection.
A number of notable strengths
and
improvement efforts were identified in your programs
and are highlighted
in the executive
summary.
During the
course of the inspection,
however,
certain activities
were noted
which appeared
to violate
NRC requirements.
The violations,
references
to
pertinent
requirements,
and
elements
to
be
included
in your response
are
described
in the enclosed
An unresolved
item was also
identified
during
the
inspection
which will be
pursued
during
future
inspections.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosures
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork
Reduction Act of 1980,
Pub. L. No.96-511.
88120802i3 88ii22
ADQCK 05000400
6
PNU
"
Carolina
Power and Light Company
November 22,
1988
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Enclosures:
1.
2.
NRC Inspection
Report
(Original signed
by M. L. Ernst)
Malcolm L. Ernst
Acting Regional Administrator
cc w/encls:
R. A. Watson,
Vice President
Harris Nuclear Project
0.
L. Tibbitts, Director of Regulatory
Compliance
C.
S. Hinnant, Plant. General
Manager
State of North Carolina
bcc w/encls:
C. Barth,i OGC
NRC Resident
Inspector
A. Upchurch,
Chairman, Triangle J
Council of Governments
DRS, Technical Assistant
Document Control
Desk