ML18005A719
| ML18005A719 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 11/23/1988 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18005A720 | List: |
| References | |
| NUDOCS 8812060267 | |
| Download: ML18005A719 (5) | |
See also: IR 05000400/1988038
Text
j
+t
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CESSION NBR:8812060267
DOC.DATE: 88/11/23
NOTARIZED- NO
ACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina
AUTH.NAME
AUTHOR AFFILIATION
VERRELLI,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
DOCKET
05000400
UTLEY,E.E. ..
,..Carols.na,Power,.&,Light.,Co..:.....,...,
'SUBJECT
";Forwards;Insp.:Rept-.50-"400/88.-38.'on
880921.-1020.No-'.violations
or deviations noted;
DISTRIBUTION CODE: IEOID
COPIES
RECEIVED:LTR $ .ENCLf SIZE:
'
/0
D
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
8
NOTES:Application'for'permit renewal. filed".
05000400
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEG 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
0 I.EB,J
LE
02
RNAL: LPDR
'NSIC
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
2
2
1
1
1 '
1
1
1
1
1
- 1
RECIPIENT
ID CODE/NAME
BUCKLEY,B
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS1
'GN2
FILE
01
NRC PDR
RESL MARTIN,D
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
. 1
1
1
1
1
1
1
1
1
1
1
MXK 'lO ALL "RIDS"
RIXXPZERIS'LEASE
HELP US I0 REDUCE WASTE
CGÃIACE IHE DOCUMEÃ7 CGÃIBOL DESKS
ROOM Pl-37
(EXT. 20079) K) EZiQQXATE KKR NAME FRCN DIEHUBUTIGN
LXSTS H)R DOCE62GS
YOU DGNFT NEEDt
D
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
NOV 23
188g
Docket
No-.
50-400'icense
No.
Carolina"Power'nd
Light Company
ATTN:
Mr. E:
E. Utley
Senior Executive Vice President
Power Supply-and-Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NO. 50-400/88-38
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
W.
H. Bradford
on
September
21
October 20,
1988.
The inspection
included
a
review of activities authorized for your Harris facility.
At the conclusion of
the inspection,
the findings were discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are
identified in the report.
Within
these
areas;
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within
the
scope
of
the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part
2,
fitle 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room..
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
(Original signed
by D. Verrelli)
Enclosure:
(See
page
2)
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
3812060267
R~il
g
AEIGCK 550'00400
Carolina
Power
and Light Company
NOV 2 3
1988
Enclosure:
NRC Inspection
Report
cc w/encl:
R. A. Watson,,
V.ice"-.President
Harris Nuclear Project '.
D. L. Tibbitts'," Director.:of'. Regu'lat'o'ry
'.
~'--.
"'='-.
Compliance
C.
S. Hinnant, Plant General
Manager
State of North Carolina
bcc w/encl:
C. Barth,
NRC Resident
Inspector
A. Upchurch,
Chairman,
Triangle J
Council of Governments
DRS Technical Assistant
Document Control
Desk
11/Ql88
PFredri ckson
11/Q/88
~pA AfG~l~ro
>>>>*+<
UNITED.:STATES
KUCl EAR REGULATORY COMI'vllSSION
BEG)ON II
101 MARIETTAST., N.W.
ATLANTA,GEORGIA 30323
Report No::
'0-400/88-38'icense'e:
.Carolina,Power:and
'Light'omp'any
.-;
'='.
0.
Box 1551: .:.
Raleigh", NC'7602
Docket Nos.:
50-400
License No.:
Facility Name:
Harris 1
Inspection
Conducted:
September
21 - October 20,
1988
Inspectors:
ra
o
ae
l
e
anno
llpp
dd: /
e rlc son,
le
,
ec ion
Dlvlslon ot Keactor I'ro]ects
a
lne
a
l
e
SUMMAKY
Scope:
Ihls routine satety lnspectlon
was ln the areas
oi operational
satety
verltlcatlon,
surveillance
observations,
maintenance
observations,
radlologlcal protection
program,
physical security program,
licensee
events
reports,
tollowup ot
events
at operating
power reactors,
10
CI-K Part 2l Keport No.
L4b, and allegation lnvestlgatlon.
Kesults:
Ln the areas
inspected,
no vlolailons or devlatlons
were ldentlTled.
d