ML18005A659

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/88-13 on 880523-27 & 0809-12.No Violations or Deviations Noted
ML18005A659
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/12/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A660 List:
References
NUDOCS 8810270033
Download: ML18005A659 (3)


See also: IR 05000400/1988013

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

-ACCESSION NBR: 8810270033

DOC. DATE: 88/10/12

NOTARIZED:

NO

0

FACIL: 50-400

Sheav on Harv is Nucleav

Poeer Planti Unit ii

Cav olina

AUTH. NAME

AUTHOR AFFILIATION

HERDTi A. R.

Region

2i

Ofc of the

Div ector

RECIP. NAME

RECIPIENT AFFILIATION

UTLEY. E. E.

Cav ol ina Poeer

5 Light Co.

SUBJECT:

Foreards

Insp Rept 50-400/88-13

on 880523-27

5 0809-12. No

violations or deviations

noted.

DOCKET

05000400

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED: LTR

ENCL

SIZE:

TITLE: Geneval

(50 Dkt)-Insp Rept/Notice

of Violation Response

NOTES: Application for permit reneea1

fi led.

05000400

REC IP IENT

ID CODE/NAME

PD2-1

PD

. COP IES

LTTR ENCL

1

1

REC IP IENT

ID CODE/NAME

BUCKLEYiB

COPIES

LTTR ENCL"

1

1

INTERNAL:

ACR S

DEDRO

NRR/DLPG/PEB

11

NRR/DOEA DIR

11

NRR/DREP/RPB

10

NRR/PMAS/ ILRB12

0

EJ3,

MANiJ

G F L

0

RGN~

F ILE

01

EXTERNAL: . LPDR

NSIC

1

1

1

2

1

1

1

1

1

1

1

1

1

1

1

AEOD

NRR MORISSEAUi D

NRR/DLPG/GAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS1

RES/DSR

DEPY

NRC

PDR

RESL MARTINiD

1

1

'1

1

1

1

1

~

1

1

1

1

1

1

1

1

1

1

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

Docket No. 50-400

License

No. NPF-63

Carolina

Power

and Light Company

"5(TTN:

Hr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC

INSPECTION- REPORT

NO. 50-400/88-13

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by J. J.

Lenahan

on May 23-27

and August 9-12,

1988.

The inspection

included

a review of activities authorized for your Harris facility.

At the conclusion

of the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.

Within the

scope of the inspection,

no violations or deviations

were identi-

fied.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document'Room.

Should you have any questions

concerning this letter,

please

contact us.

S incerely,

OReiNAf >tGN~

ALAN R. HEPnT

Alan R. Herdt, Chief

Engineering

Branch

Division of Reactor Safety

Enclosure:

NRC Inspection

Report

SSi0270033

SSi0i2

PDR

ADOCK 0I000400

Cl

PDC

ol

Carolina

Power and Light Company

OCT 12 1S88

cc w/encl:

P..

A. Watson,

Vice President

Harris Nuclear Project

~ L. Tibbitts, Director of Regulatory

Compliance

~ S. Hinnant, Plant General

Manager

bcc w/encl:

g. Barth,

OGC

5RC Resident

Inspector

iR Upchurch,

Chairman, Triangle J

Council of Governments

DRS, Technical Assistant

Document Control

Desk

State of North Carolina

RII

JLenahan:ser

10/g /88

rion

1i /88

J lake

/(( /88

RII

/

PFr drickson

10/}i /88