REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
-ACCESSION NBR: 8810270033
DOC. DATE: 88/10/12
NOTARIZED:
NO
0
FACIL: 50-400
Sheav on Harv is Nucleav
Poeer Planti Unit ii
Cav olina
AUTH. NAME
AUTHOR AFFILIATION
HERDTi A. R.
Region
2i
Ofc of the
Div ector
RECIP. NAME
RECIPIENT AFFILIATION
UTLEY. E. E.
Cav ol ina Poeer
5 Light Co.
SUBJECT:
Foreards
Insp Rept 50-400/88-13
on 880523-27
5 0809-12. No
violations or deviations
noted.
DOCKET
05000400
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR
ENCL
SIZE:
TITLE: Geneval
(50 Dkt)-Insp Rept/Notice
of Violation Response
NOTES: Application for permit reneea1
fi led.
05000400
REC IP IENT
ID CODE/NAME
PD2-1
. COP IES
LTTR ENCL
1
1
REC IP IENT
ID CODE/NAME
BUCKLEYiB
COPIES
LTTR ENCL"
1
1
INTERNAL:
ACR S
DEDRO
NRR/DLPG/PEB
11
NRR/DOEA DIR
11
NRR/DREP/RPB
10
NRR/PMAS/ ILRB12
0
EJ3,
MANiJ
G F L
0
RGN~
F ILE
01
EXTERNAL: . LPDR
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
NRR MORISSEAUi D
NRR/DLPG/GAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS1
RES/DSR
DEPY
NRC
RESL MARTINiD
1
1
'1
1
1
1
1
~
1
1
1
1
1
1
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
25
ENCL
25
Docket No. 50-400
License
No. NPF-63
Carolina
Power
and Light Company
"5(TTN:
Hr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC
INSPECTION- REPORT
NO. 50-400/88-13
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by J. J.
Lenahan
on May 23-27
and August 9-12,
1988.
The inspection
included
a review of activities authorized for your Harris facility.
At the conclusion
of the inspection,
the findings were discussed
with those
members of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of
activities in progress.
Within the
scope of the inspection,
no violations or deviations
were identi-
fied.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document'Room.
Should you have any questions
concerning this letter,
please
contact us.
S incerely,
OReiNAf >tGN~
ALAN R. HEPnT
Alan R. Herdt, Chief
Engineering
Branch
Division of Reactor Safety
Enclosure:
NRC Inspection
Report
SSi0270033
SSi0i2
ADOCK 0I000400
Cl
ol
Carolina
Power and Light Company
OCT 12 1S88
cc w/encl:
P..
A. Watson,
Vice President
Harris Nuclear Project
~ L. Tibbitts, Director of Regulatory
Compliance
~ S. Hinnant, Plant General
Manager
bcc w/encl:
g. Barth,
5RC Resident
Inspector
iR Upchurch,
Chairman, Triangle J
Council of Governments
DRS, Technical Assistant
Document Control
Desk
State of North Carolina
RII
JLenahan:ser
10/g /88
rion
1i /88
J lake
/(( /88
RII
/
PFr drickson
10/}i /88