ML18005A656

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/88-32 on 880829-0902.No Violations or Deviations Noted
ML18005A656
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/11/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A657 List:
References
NUDOCS 8810250379
Download: ML18005A656 (5)


See also: IR 05000400/1988032

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (BIDS)

ACCESSION NBR'810250379

DOC. DATE: 88/10/11

NOTARIZED:

NO

FACIL: 50-400 Shearon

Harris Nuclear

Power

Plant'nit

1 i Carolina.

, .; AUTH. NAME

AUTHOR AFFILIATION

HERDT) A. R.

Region 2i

Ofc

of. the Director

RECIP. NAME

RECIPIENT AFFILIATION

TLEYa E. E.

Carolina

Power

h Light Co.

DOCKET ¹

05000400

SUBJECT:

Forwards

Insp Rept 50-400/88-32

on 880829-0902.

No violations

noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED: LTR C ENCL J

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice

of. Violation Response

NOTES: Application for permit renewal filed.

05000400

REC IP IENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

DEDRO

NRR/DLPG/PEB

NRR/DOEA

DIR

11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE LIEBERNAN J

~RE~Q+L&

02

RGN2

FILE

01

RNAL.

LPDR

NSIC

COPIES

LTTR ENCL

1

2

2

1

1

1

f"

f

2

2

1

1

1

1

1

1

1

1

REC IP IENT

ID CODE/NAME

BUCKLEY) B

AEOD

NRR

MORISSEAUz D

NRR/DLPG/GAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS1

RES/DSR

DEPY

NRC

PDR

RESL MARTINiD

COP IES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

Docket No, 50-400

License

No.

NPF-63

Carolina

Power

and Light Company

ATTN:

Nr.

E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-400/88-32

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G.

A. Hallstrom

on August

29 - September

2,

1988.

The inspection

included

a

review of activities

authorized

for your

Shearon

Harris facility.

At the

conclusion of the inspection,

the findings were discussed

with those

members of

your staff identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within

the

scope

of

the

inspection,

no violations

or

deviations

were

identified.

In accordance

with Section

2.790

of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosures

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

A an

R.

erdt, Chief

Enginee

ing Branch

Division of Reactor Safety

Enclosure:

NRC Inspection

Report

cc w/encl:

(See

page

2)

88i0250379 88201i

PDR

ADOCK 05000400

O

PDC

OCT 11 t988

'

Carolina

Power

and Light Company

~

~

~

c

w/encl:

. A. Watson,

Vice President

'arris Nuclear Project

.'L. Tibbitts, Director of Regulatory

Compliance

.

S. Hinnant, Plant General

Manager

State of North Carolina

bcc w/encl:

Barth,

OGC

RC Resident

Inspector

P.

Upchurch,

Chairman, Triangle J

Council of Governments

DRS, Technical Assistant

Document Control

Desk

RII~+

GAHallstrom:tm

09/~D /88

J

ake

Q /88

RIIQ

Qppredrickaon

qp q /ss