Forwards Safety Evaluation Accepting Licensee First 10-yr Interval Inservice Insp Program Plan & Associated Relief Request.Technical Evaluation Rept EGG-MS-8090 Also Encl
ML18005A649
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/1988
From: Adensam E
Office of Nuclear Reactor Regulation
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A650 List:
References
TAC-67180, NUDOCS 8810170428
Download: ML18005A649 (5)


Text

.0 DISTRIBUTION NRC PDR Local PDR PD21 r/f SePtember 30, 1988 S.

Varga (14E4)

G. Lainas E.

Adensam P. Anderson B. Buckley OGC E. Jordan (MNBB 3302)

B. Grimes (9A2)

C.

Y. Cheng (9H15)

ACRS (10)

Docket No. 50-400 Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering 5

Construction Carolina Power 8 Light Company Post Office Box 1551 Raleigh, North Carolina 27602

Dear Mr. Utley:

SUBJECT:

SAFETY EVALUATION OF THE FIRST TEN-YEAR INTERVAL INSERVICE INSPECTION PROGRAM PLAN AND ASSOCIATED RELIEF REQUESTS FOR SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 (TAC NO. 67180)

By your letter dated January 28, 1988, you submitted the Shearon Harris Nuclear Power Plant, Unit 1 (Shearon Harris, Unit 1), First Ten-Year Interval Inservice Inspection (ISI) Program Plan and associated relief requests for NRC review and approval.

With technical assistance from Idaho National Engineering Laboratory

( INEL),

we have reviewed and evaluated the Carolina Power fl Light Company (CPSL) submittal for (1) application of the correct Section XI, ASME Boiler and Pressure Vessel Code edition and addenda, (2) compliance with examination and test requirements of Section XI, (3) acceptability of the examination

sample, (4) compliance with commitments made by the CP8L prior to plant operation, (5) co'rrectness of the application of system or component examination exclusion c'riteria and (6) adequacy of information supplied in support of the requests for relief from variousSection XI Code requirements.

The NRC staff's safety evaluation is enclosed.

We conclude that the Shearon Harris, Unit 1, First Ten-Year ISI Program Plan, together with the additional information provided and the specific written reliefs granted constitutes the basis for compliance with 10 CFR 50.55a(g) and Technical Specification 4.0.5 and is, therefore, acceptable.

With regard to the requested reliefs, we have determined that the inspection requirements are impractical for the ISI Program Plan for which relief is being granted

and, pursuant to 10 CFR 50.55a(g)(6)(i), that the granting of relief is 1

r aagpi7p428.

pDR hooch osp pNu,.

8 F01

's I

Mr. E.

E. Utley authorized by law, will not endanger life or property or the common defense and

security, and is otherwise. in the public interest.

In making this determination, we have given due consideration to the burden that could result if those requirements are imposed on your facility.

This letter grants the relief.

Sincere ly,

Enclosure:

Safety Evaluation INEL Technical Evaluation Report cc w/enclosure:

See next page Elinor G. Adensam, Director Project Directorate II-I Division of Reactor Projects I/II C:LA: D21:0 NAME : PAnderson DATE 9/

/88 R:

M:

~

W 9/

0/88

~

/

BBuckley:ch:

CY

DES C
D 1:0 e

E de sam

/8 9/2- /88 9/ 48 OFFICIAL RECORD COPY

( ~

I C~

i 4 M3e

Mr. E. E. Utley Carolina Power 5 Light Company Shearon Harris CC Mr. R.

E. Jones, General Counsel Carolina Power 8 Light Company P. 0.

Box 1551

Raleigh, North Carolina 27602 Mr. D. E. Hollar Associate General Counsel Carolina Power 5 Light Company P.O.

Box 1551

Raleigh, North Carolina 27602 Resident Inspector/Harris NPS c/o U.S. Nuclear Regulatory Commission Route 1, Box 315B New Hill, North Carolina 27562 Ms. Carol Love 100 Park Drive P.O.

Box 12276 Research Triangle Park, NC 27709 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street Suite 2900 Atlanta, Georgia 30323 Mr. C. S. Hinnant Plant General Manager Harris Nuclear Plant P.O.

Box 165 New Hill North Carolina 27562 Mr. R. A. Watson Yice President Harris Nuclear Plant P.O.

Box 165 New Hill, North Carolina 27562 Mr. Dwayne H. Brown, Chief Radiation Protection Section Division of Facility Services H.C. Department of Human Resources 701 Barbour Drive

Raleigh, North Carolina 27603-2008

C'