Forwards Insp Rept 50-400/88-24 on 880815-19.No Violations or Deviations Noted
ML18005A617
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/21/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A618 List:
References
NUDOCS 8810040242
Download: ML18005A617 (6)


See also: IR 05000400/1988024

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

I

ESSION NBR:8810040242

DOC.DATE: 88/09/21

NOTARIZED: NO

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina

AUTH.NAME

AUTHOR AFFILIATION

COLLINS,D.M.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power

& Light Co.

SUBJECT:

Forwards Insp Rept 50-400/88-24

on 880815-19.No violations

noted.

DISTRIBUTION CODE:

IE06D

COPIES

RECEIVED:LTR

ENCL

SIZE-

TITLE: Environ

& Radiological

(50 DKT)-Insp Rept/Notice of Viol tao

NOTES:Application for permit renewal filed.

DOCKET

05000400

~

,R

l/7

Respons

.

I

05000400 ~

INTERNAL:

RECIPIENT

ID CODE/NAME

PD2-1

LA

BUCKLEY,B

ACRS

NMSS/LLOB

5E4

NRR/DLPQ/PEB 11

NRR/DREP/EPB

10

NRR/PMAS/ILRB12

OGC/HDS1

RES

RGN2

FILE

01

RGN4 MURRAY,B

COPIES

LTTR ENCL

1

0

1

1

2

2

1

-

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT'D

CODE/NAME

PD2-1

PD

AEOD/DSP

NMSS/SGOB

4E4

NRR/DOEA/EAB ll

NRR/DREP/RPB

10

NU OCS-ABSTRACT

S/DSIR

DEPY

RGN2/DRSS/EPRPB

COPIES

LTTR ENCL

1

'1

1

1

1

1

1

1

2

2

1,

1

1

1

1

1

1

1

A

EXTERNAL: LPDR

NSIC

1

1

1

1

NRC PDR

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

24

~ 8

a1

~ E

~ %M O'4

'

~

~ t p

4

~

v

l

~"

e

"se

e

,

Docket .No. 50-400

License

No.

NPF-63

Carolina

Power and Light Company

ATTN:

Nr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-400/88-24

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

C.

A.

Hughey

on

August

15-19,

1988.

The inspection

included

a review of

activities

authorized

for your Harris facility.

At the conclusion of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

~

~

~

~

these

areas,

the inspection

consisted

of selective

examinations- of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please

contact us.

Sincerely,

Enclosure:

(See

page

2)

Douglas

N. Collins, Chief

Emergency

Preparedness

and

Radiological Protection

Branch

Division of Radiation Safety

and Safeguards

.

Carolina

Power and Light Company

Enclosure:

Inspection Report

cc w/encl:

'. A. Watson,

Vice President

Harris Nuclear Project

D. L. Tibbi'tts, Director of Regulatory

Compliance

i~C. S. Hinnant, Plant General

Manager

State of North Carolina

bcc w/encl:

-~C. Barth,

OGC

~NRC Resident

Inspector

.. A. Upchurch,

Chairman, Triangle J

Council of Governments

DRS Technical Assistant

Document Control

Desk

RI I

RI I

RI I

CHughey

Jlgahfe

PF edri ckson

9/gc/88

9/po /88

9/~/88

~

~

~ I