Text
~ AC-CELERATED
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8809220138
DOC.DATE: 88/09/09
NOTARIZED: NO
DOCKET
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina.
05000400
AUTH.NAME
AUTHOR AFFILIATION
HERDT,A.R.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E
Carolina Power
& Light Co.
SUBJECT: Forwards Insp Rept 50-400/88-23
on 880725-29.No violations
or deviations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
o5ooo4oo
~
S
RECIPIENT
ID CODE/NAME
PD2-1
EXTERNAL: LPDR
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
OE~IZ, J
'RE6
F
02
2
FILE
01
COPIES
LTTR ENCL
1
.
1
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BUCKLEY,B
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC/HDS1
RES/DSIR
DEPY
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
.
1
1
1
1
.1
1
1
1
1
1
1
1
1
1
1
A
S
A,'.
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
25 'NCL
25
SEP 09 7988
Docket No. 50-400
License
No.
Carolina
Power
and Light Company
ATTN:
Mr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh;
NC
27602
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NO. 50-400/88-23
This refers to the Nucl'ear Regulatory
Commission
(NRC) inspection
conducted
by
H.
L. Whitener
on July
25-29,
1988.
The
inspection
included
a
review of
activities
authorized
for your Harris facility.
At the
conclusion
of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas examined during the inspection
are identified in the report.
Within these
areas,
the
inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of. activities
in progress.
Wit'hin the
scope of the inspection,
no violations or deviations
were identified.
In accordance
with Section
2.790
of the
NRCs
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
i5
'lan
R. Herdt,
Chi ef
Engineering
Branch
Division of Reactor Safety
Enclosure:
NRC Inspection
Report
cc w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
D.
L. Tibbitts, Director of Regulatory
Compliance
C.
S. Hinnant, Plant General
Manager
State of North Carolina
bcc:
(See
page
2)
S809220i38
Pg0P0P
ADOCK 05000400
Q
SEP. 09 l988
Carolina
Power
and Light Company
bcc w/encl:
C. Barth,
NRC Resident
Inspector
A. Upchurch,
Chairman,
Triangle J
Council of Governments
ORS, Technical Assistant
Document Control
Desk
RII
Whit ner:sh
Q/4, /88
RII
FJape/j/88
RI I
P redrfckson
OfQ/
88