ML18005A573

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-400/88-22 on 880801-06.No Violations or Deviations Noted
ML18005A573
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/29/1988
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A574 List:
References
NUDOCS 8809130258
Download: ML18005A573 (6)


See also: IR 05000400/1988022

Text

AC'CELERATKD

DISTRIBUTION

DEMONSTRATION

SYSTEM

RECIPIENT

ID CODE/NAME

PD2-1

PD

COPIES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

BUCKLEY,B

COPIES

LTTR ENCL

2

2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8809130258

DOC.DATE: 88/08/29

NOTARIZED: NO

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina

AUTH.NAME

AUTHOR AFFILIATION

HERDT,A.R.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power

S Light Co.

SUBJECT:

Forwards Insp Rept 50-400/88-22

on 880801-06.No violations

or deviations noted.

DISTRIBUTION CODE: IEOID

COPIES

RECEIVED:LTR g ENCL g

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

.

NOTES:Application for permit renewal filed.

DOCKET

05000400

R

I

05000400

S

A

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

ERMAN,J

RE

I E

02

ILE

01

EXTERNAL: LPDR

NSIC

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS1

RES/DSIR

DEPY

NRC PDR

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

R

A

D

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25,.

Cl

AUG Z9 19B8

Docket No. 50-400

License

No. NPF-63

C

olina Power

and Light Company

~

~

~

~

.TN:

Nr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

I

SUBJECT'RC

INSPECTION

REPORT

NO. 50-400/88-22

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

P. A. Taylor

on August 1-6,

1988.

The

inspection

included

a review of

activities authorized for your Shearon

Harris facility.

At the conclusion of

the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews

with personnel,

and

observation

of

activities in progress.

Within the

scope

of

the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed

in the

NRC Public Document

Room.

Should you have any questions

concerning this letter, please

contact us.

Sincerely,

'OR1GlHAK SlGH& S~

p,LAN L O'-R>>.

Alan R. Herdt, Chief

Engineering

Branch

Division of Reactor Safety

Enclosure:

NRC Inspection

Report

cc:

(See

page

2)

3809'l30258

880829

PDR

ADOCK 05000400

PDC

Carolina

Power

and Light Company

'AUG 29 1988

cc w/encl:

MA. Watson,

Vice President

Harris Nuclear Project

N. L. Tibbitts, Director of Regulatory

Compl iance

& S. Hinnant, Plant General

Manager

bcg w/encl:

M Barth,

OGC

RC Resident

Inspector

M Upchurch,

Chairman, Triangle J

Council of Governments

DRS, Technical Assistant

Document Control

Desk

State of North Carolina

RII

gM

PaTaylor:es

8/sa /88

RI I

FJa

e

Q /88

RII

PFre rickson

.8/

88