D UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 CAROLINA POWER 8
LIGHT COMPANY, et al.
OOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 8 License No.
NPF-63 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Carolina Power 5 Light Company, et al.
( the licensee),
dated May 10,
- 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; 0.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2 ~
Accordingly, the license is amended by changes to the Technical Specifi-
- cations, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-63 is hereby amended to read as follows:
8808260454 880823 PDR ADOCK 05000400 P
PNU 3.
(2)
Technical Specifications and Environmenta 1 Protection Plan The Technical Specifications contained in Appendix A, and the Environmental Protection Plan contained in Appendix B, both of which are attached
- hereto, as revised through Amendment No. 8
, are hereby incorporated into this license.
Carolina Power 5 Light Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
August 23, 1988 Elinor G. Adensam, Director Project Directorate Il-l Division of Reactor Projects I/II NANE :PAnde s
DATE :08/
/88 BBuc
- 08/
ey:ch:
L
'g
/88
- 08/
/88 am:
G 1'
EAdensam 08/ 9/88
- 08/
88 OFFICIAL RECORD COPY
K t
X~
ATTACHMENT TO L ICENSE AMENDMENT NO.
8 FACILITY OPERATING LICENSE NO.
NPF-63 OOCKET NO. 50-400 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised area is indicated by a marginal line.
Remove Pa es 3/4 3-72 Insert Pa es 3/4 3-72
INSTRUMENTATION CHLORINE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.3.3.7 Two independent Chlorine Detector Trains, with their Trip Setpoints adjusted to actuate at a chlorine concentration of less than or equal to five ppm, shall be OPERABLE.
Each train shall consist of:
a detector at each Control Room Ventilation System intake (both normal and emergency);
and a
detector at the chlorine storage area whenever liquid chlorine is present at the storage area in quantities greater than 20 lbs.
APPLICABILITY: All MODEST ACTION:
a ~
With one Chlorine Detector Train inoperable, restore the inoperable system to OPERABLE st'atus within 7 days or within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> initiate and maintain operation of the Control Room Area Ventilation System in the recirculation mode of operation.
b.
With both Chlorine Detector Trains inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> initiate and maintain operation of the Control Room Area Ventilation System in the recirculation mode of operation.
C ~
The provisions of Specification 3.0.4 are not applicable.
SVRVEILLANCE RE UIREMENTS 4.3.3.7 Each Chlorine Detector Train shall be demonstrated OPERABLE by performance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, an ANALOG CHANNEL OPERATIONAL TEST at least once per 31 days and a
CHANNEL CALIBRATION at least once per 18 months.
SHEARON HARRIS - UNIT 1