ENCLOSURE 1
NOTICE OF VIOLATION Carolina Power and Light Company Shearon Harris Unit 1
Docket No. 50-400 License No.
NPF-63 During the Nuclear Regulatory Commission (NRC) inspection conducted on June 27
- July 20,
- 1988, a violation of NRC requirements was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Actions,"
10 CFR Part 2, Appendix C (1988), the violation is listed below:
Technical Specification 4.7.4a requires that at least two emergency service water loops be demonstrated operable at least once per 31 days by verifying that each valve servicing safety-related equipment, that is not
- locked, sealed, or otherwise secured in position, is in its correct
- position, Contrary to the
- above, the two emergency service water loops were not demonstrated operable at 'least once per 31 days, in that charging pump cooling supply valves 1SW-1430,
- 1431, 1432,
- 1433, 1434, and 1435 were not included in the monthly surveillance and therefore the correct positions were not verified.
This is a Severity Level IV violation (Supplement I).
Pursuant to the provision of 10 CFR 2.201, Carolina Power and Light Company is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice a written statement or explanation in reply including (for each violation):
( 1) admission or denial of-the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results
- achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending the,,response time.
Security or safeguards information should be submitted as an enclosure to facilitate withholding it from. public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.
FOR THE NUCL AR REGULATORY COMMISSION 3808i80262 880804 PDR ADOCK 05000400 9
PDC 0
Dated at Atlanta, Georgia this 3rd day of August 1988 D vid M.
rrelli, Chief R actor ojects Branch 1
Division of Reactor Projects