Forwards Insp Rept 50-400/88-12 on 880516-19.No Violations or Deviations Noted
ML18005A529
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 07/27/1988
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18005A530 List:
References
NUDOCS 8808150218
Download: ML18005A529 (4)


See also: IR 05000400/1988012

Text

~

~

I

ACCESSION NBR:8808150218

DOC.DATE: 88/07/27

NOTARIZED: NO.

FACIL:50-400 Shearon Harris Nuclear

Power Plant, Unit 1, Carolina

AUTH.NAME

AUTHOR AFFILIATION

COLLINS,D.M.

.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina

Power

& Light Co.

DOCKET

05000400

SUBJECT:

Forwards

Insp Rept 50-400/88-12

on 880516-19.No violations

or deviations noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR g

ENCI g 'IZE:

(gal/

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Application for permit renewal filed.

05000400

'ECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

.~IIEBE@4AN P J

EG

-

HE

02

RES/DSR

DEPY

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BUCKLEYPB

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC/HDS1

RES/DSIR

DEPY

RGN2

FILE

01

NRC

PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

26

ENCL

26

Docket No. 50-400

License

Ho.

HPF-63

C~olina

Power and Light Company

~TH:

Mr. E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUB'>ECT:

NRC INSPECTION

REPORT

NO. 50.-400/88-12

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

W.

M. Sartor, Jr.

on

May 16-19,

1988.

The inspection

included

a review of

activities authorized for your Shearon

Harris facility.

At the conclusion of

the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.

Within the

scope

of

the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please

contact us.

Sincerely,

Giigfr."ISigned By

~9K Collins

Enclosure:

(See

page 2)

Douglas

M. Collins, Chief

Emergency

Preparedness

and

Radiological Protection

Branch

Division of Radiation Safety

and Safeguards

PgR

~>>8 8BOy~~y

880@) g

9

~< O>OOOOPp

Peu

Carolina

Power

and Light Company

Enclosure:

Inspection

Report

cc w/encl:

ifh A. Watson,

Vice President

Harris Nuclear Project

LD; L. Tibbitts, Director of Regulatory

Compliance

g-: L. Harness,

Plant General

l1anager

bcc w/encl:

C~Barth,

OGC

ARC Resi dent Inspector

J~Upchurch,

Chairman, Triangle J

Council of Governments

DRS, Technical Assistant

Document Control

Desk

State of North Carolina

g;

D. Travers,

PEPB,

NRR

g~ D. Jamison, Battelle,

PNL

RII .5

RII .h.

RI I/

WSarto

TDecker

7/ ~/