ML18005A524
| ML18005A524 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 07/14/1988 |
| From: | Buckley B Office of Nuclear Reactor Regulation |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18005A525 | List: |
| References | |
| TAC-64561, NUDOCS 8807190149 | |
| Download: ML18005A524 (2) | |
Text
Docket No. 50-400 Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering 5 Construction Carolina Power 5 Light Company Post Office Box 1551
- Raleigh, North Carolina 27602 DISTRIBUTION NRC PDR Local PDR PD21 r/f S.
Varga (14E4)
G. Lainas E.
Adensam P.
Anderson B. Buckley OGC E. Jordan (MNBB 3302)
B. Grimes (9A2)
R. Stevens (7E12)
ACRS (10)
Dear Mr. Utley:
SUBJECT:
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 - ANTICIPATED TRANSIENT WITHOUT SCRAM (ATWS)
RULE 10 CFR 50.62 (TAC NO. 64561)
The staff has reviewed your submittals dated January ll, Apri 1 12, and May 10, 1988 that described the ATWS mitigating system actuation circuitry proposed for installation at the Shearon Harris Nuclear Power Plant, Unit 1.
We have concluded that, pending the final resolution of the technical specification issue being deve'loped by the NRC staff, your proposed ATWS design is in com-pliance with the requirements of 10 CFR 50.62, paragraph (c)(1).
- Further, the staff conclusion is based on the successful completion of certain human factors engineering reviews delineated in the enclosed Safety Evaluation.
Until the NRC staff review is completed regarding the use of technical speci-fications for ATWS requirements, you should continue with the scheduled installation and implementation of the ATWS design using administratively controlled procedures.
S incere ly, OOV ct <R MQQ NO OO 09IA 070 o hc ct D wQ OA
'CZ OK 09%
MQ.Q.
Enclosure:
Safety Evaluation cc w/enclosure:
See next page
~
~
~
~
Bart C. Buckley, Project Manager Project Directorate II-l Division of Reactor Projects I/II
.NAME DATE PA
- BBuckley:ch:
EA 7/ //88 7/
/88 7/
OFFICIAL RECORD COPY nsam 88-
~g l