ML18005A457
| ML18005A457 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 06/27/1988 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18005A458 | List: |
| References | |
| NUDOCS 8807050516 | |
| Download: ML18005A457 (2) | |
Text
June 27, 1988 Carolina Power and Light Company ATTN:.Nr.
E.
E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0.
Box 1551
- Raleigh, NC 27602 p ~i/i6 f;/6 Gentlemen:
SUBJECT:
SHEARON HARRIS EXAMINATION REPORT 400/OL-88-01 The NRC administered examinations on April 25-28, 1988, to employees of your accompany who had applied for licenses to operate the Shearon Harris Nuclear Power Plant.
At the conclusion of the written examination, a copy of the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your staff identified in the Examination Report, Enclosure 1.
Copies of the written examination questions and answer key are included in this report as Enclosure 2.
Facility comments regarding the written examination are included in this report as Enclosure
- 3. Enclosure 4 summarizes simulator performance deficiencies observed during conduct of the simulator portion of the operating examinations.
In accordance with 10 CFR 2.790(a),
a copy of this letter and its enclosures will be placed in NRC's Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, (ORIGINAL SIGNED BY G. A. BELISLE FOR)
Enclosures:
l.
Exam Report 50-400/OL-88-01 2.
RO/SRO Exam guestions
& Answer Key 3.
Faci1 ity Comments 4.
Simulation Facility Fidelity Report cc w/encls 1
& 3:
B. Furr, Corporate Training Dir.
J.
- Harness, Plant Hanager cc w/encls 1, 2, 3
& 4:
A.
W. Powell, Site Training Director bcc:
(See Page 2) pgp 880627 ADOCK O50004O0 PNv Caudle A. Julian, Chief Operations Branch Division of Reactor Safety
~
~
Carolina Power and Light Co. June 27,,1988 bcc w/encl 1:
B. Buckley, Project Manager, NRR P. Fredrickson, Section Chief, DRP W. N. Dean, OL Examiner, DRS State of North Carolina bcc w/encls 1, 2, 3,
& 4:
Senior Resident Inspector Operator Licensing Branch, DLPg:NRR yflocument Control Desk Sonalysts, Contractor R I RI I RShaw:obw WN3'can 06/ 7/88 06/L) /88 KNrockman 06/l" /88 RI I P~//m CAJulian 06/ g)/88