Text
'
ACCELERkTED DI JBUTION DEMONSYR~TJO>
Py STEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8806070322 DOC.DATE: 88/05/26 NOTARIZED: NO FACXL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION" COLLINS,D.M.
Region 2, Ofc of the Director RECIP.MKE RECIPXENT AFFXLIATION UTLEY,E.E.
Carolina Power 6 Light Co.
DOCKET I 05000400
SUBJECT:
Advises that 880222 Rev 12 to radiological emergency plan consistent w/provisions of 10CFR50.54(p)
& acceptable.
R DISTRIBUTION CODE: IE35D COPIES RECEIVED: LTR Q ENCL +
SIZE:
TXTLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep NOTES:Application for permit renewal filed.
05000400>
RECXPIENT ID CODE/NAME PD2-1 PD
.INTERNAL: ARM/DAF/LFMB MAS/ILRB12 02 RGN2/DRSS/EPRPB EXTERNAL: LPDR NSIC COPXES LTTR ENCL 1
1 1
0 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME BUCKLEY,B NRR/DREP/EPB 10 NUDOCS-ABSTRACT RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1,
/
A A
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 12 ENCL 0
Carolina Power and Light Company ATTN:
Mr. E.
E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0.
Box 1551
- Raleigh, NC 27602 Gentlemen:
SUBJECT:
SHEARON HARRIS RADIOLOGICAL EMERGENCY PLAN REVIEW DOCKET NO. 50-400 We have completed our review of Revision 12 to the Shearon Harris Emergency
- Plan, dated February 22, 1988.
Our review indicated that the changes appear to meet the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
Please be reminded that 10 CFR 50.54(q) requires that proposed changes that decrease the effectiveness of your Emergency Plan shall not be implemented without application to and approval by the Commission.
- However, changes may be made without Commission approval if such changes do not decrease the effectiveness of the
- Plan, and the
- Plan, as changed continues to meet the standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
If a change is made without approval, you should furnish copies in accordance with 10 CFR 50.54(q).
- Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50, Appendix E, Section V.
Should you have any questions regarding this letter, please contact Mr. Thomas R. Decker of our staff at (404) 331-2559.
Sincerely, Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection Branch Division of Radiation Safety and Safeguards cc:
R. A. Watson, Vice President Harris Nuclear Project D. L. Tibbitts, Director of Regulatory Compliance J. L. Harness, Plant General Manager bcc:
(See page 2) 8806070322 880526 PDR ADOCK 05000400 F
Carolina Power and Light Company bcc:
C. Barth, OGC NRC Resident Inspector A. Upchurch, Chairman, Triangle J Council of Governments DRS Technical Assistant Document Control Desk State of North Carolina RI I AGooden 5/yy/88 RI I ~
TDec er 5/p>/88 RI I PFr rickson 5/+88
f