ML18005A439
| ML18005A439 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/10/1988 |
| From: | Watson R CAROLINA POWER & LIGHT CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| HO-880109-(O), NUDOCS 8806030090 | |
| Download: ML18005A439 (3) | |
Text
ACCELERATED DISPBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)
ACCESSION NBR:8806030090 DOC.DATE: 88/05/10 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION WATSON,R.A.
Carolina Power S Light Co.
RECIP.NAME RECIPIENT AFFILIATION GRACE,J.N.
Region 2, Ofc of the Director
SUBJECT:
Notifies of snubber functional testing program to be implemented during first refueling outage on 880716.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR I
ENCL 1
SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.
DOCKET I 05000400 o5ooo4oo D RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB ll NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 OE~X~BERMAN,J
~G '~E~
02
'RGN2.
FILE 0 1 EXTERNAL: LPDR NSIC COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME BUCKLEY,B AEOD NRR MORISS EAUI D NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DXR 9A NUDOCS-ABSTRACT OGC 15-B-18 RES/DRPS DEPY NRC PDR COPIES LTTR ENCL 2
.2 1
.1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
D 8
h TOTAL NUMBER OF COPIES REQUXRED:
LTTR 25 ENCL 25
CML Carolina Power & Light Company HARRIS NUCLEAR PROJECT P. 0.
Box 165 New Hill, North Carolina 27562 MAY 1 0 1988 File Number'SHF/10-13510 Letter Number.'0-880109 (0)
Dr. J. Nelson Grace United States Nuclear Regulatory Commission 201 Marietta Street S.W.
- Atlanta, GA 30323 SHEARON HARRIS NUCLEAR POWER PLANT UNIT NO. 1, DOCKET NO. 50-400, LICENSE NO. NPF-63 NOTIFICATION OF SELECTION OF SAMPLE PLAN FOR SNUBBER FUNCTIONAL TESTING
Dear Dr. Grace:
As required by Shearon Harris Technical Specification 3.7.8 and FSAR Chapter 16.3, Technical Specification Equipment
- Lists, Carolina Power
& Light Company provides notification regarding the snubber functional testing program to be implemented during the first refueling
- outage, currently scheduled to commence on July 16, 1988.
Functional testing will be conducted as follows'.
(1)
Hydraulic snubbers will be tested per the 10X sample plan, as specified in FSAR 16.3, Table 16.3-4, Section 4.5.1.
(2)
Mechanical snubbers will be tested per the "37" plan, as specified in FSAR 16.3, Table 16.3-4, Section 4.5.2, and Figure 16.3-1.
8806030090 880510 PDR ADOCK 05000400 P
DCD MEM/HO-8801090/1/OS1
Dr. J.
Nelson Grace Page 2
Please contact Mr.
Dean L. Tibbitts at (919) 362-2718 if you require further information regarding the test program.
Very truly yours, R. A. Watson Vice President Harris Nuclear Project ajh:msb cc'.
Mr. G. Maxwell (US NRC-RII)
Mr. M. A. Turkal (NLS)
Mr. R. B. Van Metre Regulatory Compliance MEM/HO-8801090/2/OS1