ML18005A433
| ML18005A433 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 05/24/1988 |
| From: | Watson R CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CON-NRC-626 GL-87-07, GL-87-7, HO-880114-(O), NUDOCS 8805310107 | |
| Download: ML18005A433 (4) | |
Text
WJ f
ACCESSION NBR FAC IL: 50-400 AUTH. NAME LPATSONi R. *.
RECIP. NAME REGUL(
Y INFORMATION DISTRIBUTI YSTEM (RIDS) 880531010?
DOC. DATE: 88/05/24 NQTARIZED:
NO Shearon Harris Nuclear Poujer Planti Unit ii Carolina AUTHOR AFFILIATION Carolina Poeer 5 Light Co.
RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000400
SUBJECT:
Certifies that licensed operator initial 4~ requalif ication trainjng programs accredited bg INPO Natl Nuclear Accreditation Board. per direction provided in Generic Ltr 87-07. Programs based on sos approach to training.
DISTRIBUTION CODE:
M003D COPIES RECEIVED: LTR
~
ENCL ~
SIZE:
TITLE: Operator Requalif ication Program NOTES: Application For permit reneeal filed.
05000400 RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY'S 9 INTERNAL: ACRS AEQD/DSP/TPAB B 10 01 EXTERNAL:
LPDR NSIC COP IES LTTR ENCL 10 i~
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DQA NRR/DLPG/HFB 10 NUDOCS-ABSTRACT RGN2 NRC PDR COPIES LTTR ENCL TOTAL NURSER OF COPIES REQUIRED:
LTTR SS ENCL
-RP
l N'I
Carolina Power & Light Company HARRIS NUCLEAR PROJECT P.O.
Box 165 New Hill, North Carolina 27562 HAY 24 19')d File Number'SHF/10-13510E Letter Number'HO-880114 (0)
Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20S55 NRC-626 CAROLINA POWER
& LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER'PLANT DOCKET NO. 50-400 LICENSE NO. NPF-63 Gentlemen:
In accordance with direction provided in NRC Generic Letter 87-07, this letter hereby certifies that the licensed operator initial and requalification training programs required by 10CFR55.31a and 55.59c at the Shearon Harris Nuclear Power Plant (SHNPP) of the Carolina Power
& Light Co.,
have been accredited by the Institute for Nuclear Power Operations'ationai, Nuclear Accrediting Board and that these programs are based upon a
systems approach to training.
The date of the above accreditation for Reactor Operator and Senior Reactor Operator programs was July 22, 1987.
The following additional SHNPP training programs have also been accredited by the National Nuclear Accrediting Board on the dates listed below.'Pro ram Mechanic Electrician Instrumentation
& Control Technician Radiological Control Technician Environmental
& Chemistry Technician Technical Staff
& Manager Non-Licensed Operator Shift Technical Advisor Accreditation Date December ll, 1985 December ll, 1985 December ll, 198S September 25, 1986 September 25, 1986 September 25, 1986 July 22, 1987 July 22, 1987 8805310107 880524 PDR
- DOCK 05000400 P
PDR MEM/HO-8801140/1/Osl
U.S. Nuclear Regulatory Commission Page 2
This notification is submitted in advance of an update to the SHNPP Final Safety Analysis Report (FSAR) required by 10CFR50.71(e) which will describe our current program.
Sincerely, R. A. Watson Vice President Harris Nuclear Project GMB:ddl cc:
Dr.
Mr.
Mr.
Mr.
Dro J.
N. Grace (NRC-RII)
L. H. Martin (CP&L)
G. F. Maxwell (NRC-SHNPP)
A. W. Powell (CP&L)
J.
B. Wright (CP&L)
MEM/HO-8801140/2/OS 1