~AC CELERATEO DIAIBUTION DEMONSTCION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8805190262 DOC.DATE: 88/04/30 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION

'ALE,M.W.

Carolina Power 6 Light Co.

WATSON,R.A.

Carolina Power 6 Light Co."

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400

SUBJECT:

Monthly operating rept for Apr 1988.W/880512 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR /

ENCL ~

SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed.

05000400 >

8 RECIPIENT ID CODE/NAME PD2-1 LA BUCKLEY,B INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/PEB 11 NRR/DREP/RPB 10 NUDOCS-ABSTRACT RGN2 EXTERNAL: EGGG WILLIAMS,S NRC PDR COPIES LTTR ENCL 1

0 1

0

'0 10 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11

~RR~~S ILRB12 G FIL 01 LPDR NSIC COPIES LTTR ENCL 5

5 1

1 2

2 1

1 1

1 1

1 1

1 1

1 A

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 32 ENCL 30

C"

% ~

ul

~

l'<

I 1

DOCKET NO.:

050-400 UNIT:

Harris Unit 1

DATE:

April 1988 COMPLETED BY:

Mark Hale OPERATIONS

SUMMARY

Harris Unit 1 operated at a 100 percent Availability Factor for the month of April with a 101.91 percent capacity factor.

There was one load reduction.

Details are provided on the Unit Shutdowns and Power Reduction Sheet.

There are 157 fuel assemblies in the reactor and 0 spent fuel bundles in the Harris Unit 1 fuel pool.

New fuel receipt is in progress.

8805190262 380430 PDR ADOCK 05000400

('

DCD L

MEM/DATAREPa/1/OS4

v o r

~

  • t A

("Phl CO Rug DAz'E e5re3r88 RUN TINE 12:48:28 PLANT PERl"-ORNANCE DATA SYSTEM QPERATlNG DATA REPOR HARRIS UHXT 1

PAGE RpD36-e00 QPLRATIHG STATUS DQcKET Ho. e5e-4ee COMPLETED BY NARK M.

HALE TFI EPHONE (919>362-2944 1.

UNIT NAME:

HARRIS UNIT 1

2.

REPORTING PERXOD: APRIl, 88 3.

LICENSED THERMAL POWER (NMT): 2775 4.

NAMEPLATE RATIHG (GROSS MWE): 95e.9 5.

DESIGN ELECTRICAL RATING (NET NME): 900.0 6.

NAX DEPENDABLE CAPACITY <GROSS NME): 920.0 7.

NAX DEPENDABLE CAPACXTY (HET NWE): 860.0

8. IF CHAHGFB OCCUR IH CAPACITY RATINGS

( XTENB GIVE REASONS:

N/A l

NOTES I

There are 157 fuel elements in the Reactor Vessel and 0 elements in the spent fuel pools.

New fuel receipt in progress.

1 I

I 3

Tl-IRU 7)

SINCE LAST REPORT, 9 a POWER LEVEL TO MHICH RESTR ICTED IF AHY

( HET MWE ) 'one 1e.

Rl=ABOHS FOR RESTRICTION XF ANY: N/A THIS NOHTH YR TG DATE CUMUL ArIVE 12 13.

14 ~

15.

16.

'I 7.

18.

19.

20.

22

'3.

24.

HOURS IH REPORTING PERIOD NUMBER OF HOURS REACTOR CRXTXCAL REACTOR RESERVE SHUTDOWN HRS HOURS GFHERATOR OH LINE UNIT RESERVE SHUTDQMN HOURS GROSS Tl-IERMAL ENERGY GEH.

(MWH)

GROSS ELEC.

ENERGY GEH.

(MMH)

NET ELEC.

EHERGY GFHERATED (NWH)

UHXT SERVICE FACTOR UNIT AVAILABILITYFACTO~

UNIT CAP.

FACTOR (USING NDC NET)

UHIT CAP.

FACTOR (UBlNG DER NET)

UHXT FORCED OUTAGE RATE SHUTDOWHS SCHED ~

OVER NEXT 6 MONTHS Refueling Outage July 719 F 00 29e3.ee 719.e0 2713.22

.00

.00 719.0e 2701 F 42

.00

  • ee 19884e9

~ 6e 7411514 'e 670833.00 25e6616.00 63e153.e<>

23<6<22.ee 100.e0 93.06 100.00 93.06 101 '1 93.99 97.38 89.81

.e0 6.94

< TYPE,

DATE, AND DURATION 16, 1988 7 weeks 876e.00 7163.11

.ee 7025.02

.Oe 18561659.76 6171834.ee 5725251.0e Be.19 80.19 76.0e 72.62 9'2 OF EACH):

25.

XF SHUTDOWN AT END OF REPORT

PLRIQD, ESTlNATED DATE QF START UP:

26.

UHITB IN TEST STATUS

<PRXQR TQ COMMERCIAL OPERATIOH):

FORECAST ACHIEVED INXTIAL CRITICALITY XHITIAL ELECTRICITY COMMERCIAL OPERATION Hem/DataRepa/2/OS4 4.71.16

hv(

11

~,

(I p

h r

'I IIfr r

F4<< I

,a

~ >I I.

II t,

Ia

~

t tr

-I.'I I

)

It

~

<<'lh hei h

h r

.".Rll'

()a)l I

~

hat li af-fa I

I lt 1

~

P;"f

,)f'il l,,

(

ff' '-',

!'f'

~

ft tv a

) Il

-,pf'fr )

ll I

') "4 S

f,'<<Va

, RVq f ';," I f

I '"Irf,"

, V il ll ha I fahr

'if'

<<R hf r "I"

-f '

<<I R'ffr

hi<<

R a

a h

'I V h

~

f f, I'fepf

'fl 1 I

I p t

'IP 'hr

,hh a'

<, )I-> )

(

I

>h

~I II' 'f,

~P('

hP rt

~,I tf jr t I 'I I I

V I

" 'h"l h'ia f %."ral

'.f f

)I<<'

r tftt >>V I f

~

Pa

~

Pfff h fht'f, '"' ':" fa a'I Ivf IIV'p 'J lip p"

"'v...

a

" l.;l vft

~ th If h ), fftrr iil,.l f ~ltvr'L it lt I, i'I ff

i

<<'f E P'I

'tr,l<h t.faf ff a."

I

(

~ off.f

., )(f pp'l-phr

\\

h hj

~ h II ~

'<< Ilrr't, I,pt ',l "all I f f tft hl<<h'I I<<f vlih<< "',f I>frit~

,I>>'r a,"'Ai ",I

?

a,'<

f<<',

I f

vtpf

~

~

~

I I

CPS L CO Rug DATE 05r03r88 RUN TIHE 32:48:27 PLANT PERFORHANCE DATA SY+TEH ENDIX B AVERAGE DAILY F=R LEVFL I.IARRI8 UNIT PAGE RPD39-00e

'OCK NO ~ 050-400 COHPLETED BY HARK M.

HAI E TELEPHONE (919>362-2944 DAY 'VG. DAlLY POWER LEVEL (HME-NET>

875 DAY, AVG. DAILY POWER LEVEI (HME-NET>

880 87$

.)0

,882 880 877 878 875 884

$ 0 878 873 879 877 30 15 Mem/DataRepa/3/OS4

O.

'I H

Nl

, ~

4

.w P

II asiP jg I

l lt Ir.'

I H

II P

1 df lg

)t WN P

H I

4 E

II

I ~

I

~

~

I II I

I I I

~

~

~

~

~ ~

~

~

I

~

~

I I ~

~

~

~ I I ~

~ II

~

~

~

I'

~

~

~

~

~

I

~

I ~

~

I

~ I

~

~

I

~

~

~

I

~

~

~

~..

~

~

~

I I ~

I

~

~

~

~

~

~

~

4

CME Carolina Power & Light Company HARRIS NUCLEAR PROJECT PO Box 165 New Hill, North Carolina 27562 pAY. )'2 1988 File Number.

SHF/10-15505 Letter Number:

HO-884019 (0)

Document Control Desk United States Nuclear Regulatory Commission Washington, D.C.

20555 HARRIS NUCLEAR PROJECT DEPARTMENT UNIT NO.

1 DOCKET NO. 50-400 LICENSE NO. NPF-63 MONTHLY OPERATIONS REPORT Dear Sirs'.

In accordance with Technical Specifications 6.9.1.5 for the Harris Nuclear Power Plant, Unit No.

1, Carolina Power 6 Light Company herewith submits the report of operation statistics and shutdown experience for the month'f April 1988.

Yours very truly, MWH:dtp Enclosure R. A. Watson Vice President Harris Nuclear Project cc.'r. J. Nelson Grace (NRC)

Messrs.

J.

M. Taylor (NRC)

G. F. Maxwell (NRC-SHNPP)

R.

G. Oehl (DOE)

MEM/HO-8840190/1/OS4

v F'

f t)