Text
ACCELERATED
DI
BUYION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:8805190094
DOC.DATE: 88/05/09
NOTARIZED: NO
FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina
AUTH.NAME
AUTHOR AFFILIATION
"
VERRELLI,D.M.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
UTLEY,E.E.
Carolina Power
& Light Co.
DOCKET
05000400
SUBJECT:
Forwards Insp Rept 50-400/88-08
on 880320-0420.No violations
or deviations noted.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED:LTR J
ENCL
l
SIZE: Zl-
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:Application for permit renewal filed.
o5ooo4oo >
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB 11
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NRR/PMAS/ILRB12
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
BUCKLEY,B
NRR MORISSEAU,D
NRR/DLPQ/QAB 10
NRR/DREP/EPB
10
NRR/DRIS DIR 9A
NUDOCS-ABSTRACT
OGC 15-B-18
RES/DRPS
DEPY
NRC PDR
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
A
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
25
ENCL
25
~
I
h
)
~
MAY 0 9
1988
Docket No. 50-400
License
No.
Carolina
Power and Light Company
ATTN:
Mr.
E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P.
0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT
NO. 50-400/88-08
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
G.
F. Maxwell
on March 20 - April 20,
1988.
The inspection included
a review
of activities authorized for your Harris facility.
At the conclusion of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations of procedures
and
representative
records,
interviews
with personnel
and
observation
of
activities in progress.
Mithin the
scope
of the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section
2. 790 of the
NRC's
"Rules of Practice,"
Part
2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter, please
contact
us.
Sincerely,
Enclosure:
NRC Inspection
Report
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
8805l90094
880509
ADOCK 05000400
9
Carolina
Power and Light Company
cc w/encl:
R.
A. Watson,
Vice President
Harris Nuclear Project
D.
L. Tibbitts, Director of Regulatory
Compliance
J.
L. Harness,
Plant General
Manager
bcc w/encl:
C. Barth,
NRC Resident
Inspector
A. Upchurch,
Chairman, Triangle J
Council of Governments
DRS, Technical Assistant
Document Control
Desk
State of North Carolina