Forwards Insp Rept 50-400/88-08 on 880320-0420.No Violations or Deviations Noted
ML18005A421
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/09/1988
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML18005A423 List:
References
NUDOCS 8805190094
Download: ML18005A421 (4)


See also: IR 05000400/1988008

Text

ACCELERATED

DI

BUYION

DEMONSTRATION

SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:8805190094

DOC.DATE: 88/05/09

NOTARIZED: NO

FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina

AUTH.NAME

AUTHOR AFFILIATION

"

VERRELLI,D.M.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

UTLEY,E.E.

Carolina Power

& Light Co.

DOCKET

05000400

SUBJECT:

Forwards Insp Rept 50-400/88-08

on 880320-0420.No violations

or deviations noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED:LTR J

ENCL

l

SIZE: Zl-

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES:Application for permit renewal filed.

o5ooo4oo >

RECIPIENT

ID CODE/NAME

PD2-1

PD

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR 11

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

EXTERNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

BUCKLEY,B

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC 15-B-18

RES/DRPS

DEPY

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

A

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

~

I

h

)

~

MAY 0 9

1988

Docket No. 50-400

License

No.

NPF-63

Carolina

Power and Light Company

ATTN:

Mr.

E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P.

0.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT

NO. 50-400/88-08

This refers

to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

G.

F. Maxwell

on March 20 - April 20,

1988.

The inspection included

a review

of activities authorized for your Harris facility.

At the conclusion of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations of procedures

and

representative

records,

interviews

with personnel

and

observation

of

activities in progress.

Mithin the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2. 790 of the

NRC's

"Rules of Practice,"

Part

2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter, please

contact

us.

Sincerely,

Enclosure:

NRC Inspection

Report

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

8805l90094

880509

PDR

ADOCK 05000400

9

DCD

Carolina

Power and Light Company

cc w/encl:

R.

A. Watson,

Vice President

Harris Nuclear Project

D.

L. Tibbitts, Director of Regulatory

Compliance

J.

L. Harness,

Plant General

Manager

bcc w/encl:

C. Barth,

OGC

NRC Resident

Inspector

A. Upchurch,

Chairman, Triangle J

Council of Governments

DRS, Technical Assistant

Document Control

Desk

State of North Carolina